Tender For Fabrication Jobwork Season 2022-23- 1 M.S Pipe Line 2 Dismantling Of Pipe Lines 1” To 3’’ 3 Do 4’’To 11’’ 4 Do12” To 20” 5 Do 21’’To48’’ 6 M.S Pipe Line 7 Erection Of Pipe Line From 1” To 3” Dia 8 Do4” To 11” 9 Do12to20 10 D, palwal-Haryana

Cooperative Sugar Mills Societies has published Tender For Fabrication Jobwork Season 2022-23- 1 M.S Pipe Line 2 Dismantling Of Pipe Lines 1” To 3’’ 3 Do 4’’To 11’’ 4 Do12” To 20” 5 Do 21’’To48’’ 6 M.S Pipe Line 7 Erection Of Pipe Line From 1” To 3” Dia 8 Do4” To 11” 9 Do12to20 10 D. Submission Date for this Tender is 02-08-2022. Machine Tools Tenders in palwal Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

33173471
Tender For Fabrication Jobwork Season 2022-23- 1 M.S Pipe Line 2 Dismantling Of Pipe Lines 1” To 3’’ 3 Do 4’’To 11’’ 4 Do12” To 20” 5 Do 21’’To48’’ 6 M.S Pipe Line 7 Erection Of Pipe Line From 1” To 3” Dia 8 Do4” To 11” 9 Do12to20 10 D
Open Tender
Indian
Haryana
palwal
02-08-2022

Tender Details

Tender For Fabrication Jobwork Season 2022-23- 1 M.S Pipe Line 2 Dismantling Of Pipe Lines 1” To 3’’ 3 Do 4’’To 11’’ 4 Do12” To 20” 5 Do 21’’To48’’ 6 M.S Pipe Line 7 Erection Of Pipe Line From 1” To 3” Dia 8 Do4” To 11” 9 Do12to20 10 Do 21 To 48 11 Fabrication Of Pipe Line From 12”Above 12 Flanges And Blind Up To 48” 13 Dismantling Of Flanges / Blind 14 Refitting Of Old / New Flanges / Blind 15 Fabrication Of Flanges Blind From M.S. Plateupto 48 16 Bends, Reducersandnipples ( Up To 1’’ To 12’’ ) 17 Dismantling 18 Fabrication 19 Fitting 20 Bends, Reducersand Nipples ( Above 12’’ ) 21 Dismantling 22 Fabrication 23 Fitting 24 Dismantling , Fab.Anderection Of M.S. / G.L Pipe Accessories ( Tee, Cross, Distance Piece7” To 12’’ ) 25 Dismantling 26 Fabrication 27 Erection 28 Dismantling , Fab.Anderection Of M.S. / G.L Pipeaccessories ( Tee, Cross, Distance Piece Above 12’’ ) 29 Dismantling 30 Fabrication 31 Erection 32 Dismantling , Fab.Anderection Of M.S. / G.L Pipeaccessories ( Tee, Cross, 0 To 6” ) 33 Dismantling, Fab.And Erection Of M.S. Tanks, / Vassalsfrom M.S Plates, Angle M.S Channel ‘I’ Section Etc ( Up To 6 Mm Plate 34 Dismantling 35 Fabrication 36 Erection 37 Dismantling, Fab.And Erection Of M.S. Tanks / Vessals From Ms Plate , Angles, Ms Channel , I- Section Etc. 38 Dismantling 39 Fabrication 40 Erection 41 Dismantlinganderection Of Railing 42 Dismantling 43 Fabrication 44 Erection 45 Valves 46 Dismantling 1’’ To 6’’ 47 Dismantling 7’’ To 12’’ 48 Dismantling Above 12’’ Size 49 Fitting 1’’ To 6’’ 50 Fitting 7’’ To 12’’ 51 Fitting Above 12’’ Size 52 S.S Pipe Line 53 Dismantling Of All Size 54 Erection All Size 55 Dismantling, Fab., Anderection Of S.S. Pipe Accessories ( Tee, Cross, Distance Piece, Nipples Reducer And Bend ) Up To 12” 56 Dismantling 57 Fabrication 58 Erection 59 Patch Work On Tankandpipe ( M S Plate Cutting, Fittingandwelding, 02 Round Welding ) 60 Dismantling , Fabricationanderection Of Cone Of Bigger Size Will Be Treated 61 Dismantling 62 Fabrication 63 Erection 64 Fabricationanderection Of Gutter Of Any Size By Required Thickness ( Bigger Size Will Be Treat As Dia ) 65 Dismantling , Fabricationanderection Of 3 Nos. Hood Of Cutter, Chopper And Leveler By 8 / 6 Mm M.S. Plate 66 Dismantling , Fabricationanderection Of Old Feed Pipe Line Feed Pump To Boiler 67 Dismantling Of Oldanderection Of New I D Fan Taper Cone. 68 Dismantling, Fabricationanderection Of Old Ducting From I.D. Fan Inlet Damper To I D Fan . 69 Dismantling , Fabricationanderection Of Flue Gas Ducting Size 5’ X 5’ 70 Dismantling , Fabricationanderection Of I.D. Fan Casing Form8 To 10Mm M.S Plate 71 Dismantling , Fabricationanderection Of I.D. Fan Outlet Damper 72 Dismantling , Fabricationanderection Of I.D.Fan Inlet Damper 73 Dismantling , Fabricationanderectionof Bagasse Elevator, Bagasse Carrierandrbc Bottom And Side Plate Worn Out Portion 74 Dismantling , Fabricationanderection Of Boiler Bagasse Feeding Chute By 8 / 6 Mm M.S. Plate. 75 Dismantling , Erection And Fabrication Of Umbrella Of Pan. 76 Dismantling , Fabricationanderection Of Save All Of Quad Body. 77 Dismantling 78 Fabrication 79 Erection 80 Dismantling , Fabricationanderection Of Save All Of Pan. 81 Dismantling 82 Fabrication 83 Erection 84 Stair Case ( Fab. With Chaquered Plate / Old Plate And Pipe Line ) 85 Dismantling 86 Fabrication 87 Erection 88 Dismantlingand Erection Of Pump Up To 4’’And15 Hp Motor Shifting Of Pump / Motor Upto 20 Mtr Distance 89 Dismantling 90 Erection 91 Dismantlinganderection Of Pump More Than 4”And15 H.P Motor Shifting Of Pump / Motor More Than 20 Mtr Distance 92 Dismantling 93 Erection ( Pump / Motor ) 94 Ammoniaandgas Coils ( Dismantling , Fab.And Erection ) 95 Dismantling 96 Fabrication 97 Erection 98 Dismantling, Fabricationanderection Ofnew Plate Form Asper Requirement From Old M S Plate 6Mm To 8 Mm Thickness.Up To 2 Sqm 99 Dismantling 100 Fabrication 101 Erection 102 Dismantling , Fabrication, Anderection Of New Plate From By M S / Chequared Plate More Than 2 Sq Mtr 103 Dismantling 104 Fabrication 105 Erection 106 Crystallizer Coils 107 Dismantling 108 Fabrication 109 Erection 110 Old And Worn Out Staging, Plate Farm Tank, Vassals. 111 Dismantling 112 Fabrication 113 Erection 114 Repairing Of Rubber Seated Exhaust / Vapor Valve Above 16 “ 115 Dismantling , Fabricationanderection Of Side Plate Of Canekicker Cutter, Leveler, And Chopper By 8 / 6 Mm M.S. Plate 116 Dismantling , Fabricationand Erection Of Mill Juice Tray By 8 Mm / 10 Mm M.S Plate 117 Dismantlingof Existing Cane Carrier Chute And Fabricationanderection Of 8 To 10 Mm M.S Plate 118 Repairing Of Steam Jacket For Sulphur Furnace 119 Replacement Of Steam Jacket Of Evaporator Bodies 120 Strengthening Of Vapour Line Above 16”By Innerand Outer Side / Ring Of Angle / Pipes 121 Dismantling , Fabricationanderection Ofsupport Angle, Pipe, Channelat Any Equipment 122 Hopper Centre Piece By 12 Mmplate 123 Dismantling 124 Fabrication 125 Erection 126 Hopper Tray 127 Dismantling 128 Fabrication 129 Erection 130 Sulphur Furnace Cooler Dismantling, Fab. And Erection Work 131 Sulphur Furnace Scrubber Dismantling, Fabrication And Erectionwork 132 ‘B’ Vacuum Crystallizer Shell To Be Changed From 10 Mm M.S. Plate 133 ‘C, Vacuum Crystallizer Shell To Be Changed From 10 Mm M.S.Plate 134 Dismantling , Fabrication & Erection Of S.F. Chamber With Cooling Jacket Complete. 135 Strengthening Of Factory Columns Of Various Size By 10 Mm M.S.Plate Angle Channels Etc. 136 Strengthening Of Factory Beams Of Any Size By M.S.Plate Angle Channeli. Section Etc. 137 Chipping , Cleaning And Painting Of Columns And Beams Orstaging Of Factory Machinery. 138 Painting One Coat With Ready Mixed Paint In Factory Building M.S. Column ( 25 Mtr Approx. Height. And15-5 Mtr Height Approx ) And M.S Trusses Including Rubbing Down Old ( If Required At Site. All The Bracing And Purlins Are Included With This Work. 139 Dismantling, Fabrication And Erection Of Any Size Factory / Building, Columns Beams And Trusses 140 Dismantling , Fabrication And Erection Of Worn Out Water Pipes, Nozzles, Drain Box Etc. 141 Dismantling , Fabrication And Erection Of Worn Out Shell Ofboth Wet Scrubber 142 Dismantling, Fabrication And Erection Of Worn Out Internal Of Both Wet Scrubber 143 Dismantling, Fabrication And Erection Of Wornflue Gas Ducting Size 5’ X5’Of Both Wet Scrubber From Damper To Chimney 144 Replacement Of Worn Out Portion Of Supports Of Molasses Tank Roof. 145 Replacement Of Worn Out Portion Ofroof Of Molasses Tank 146 Dismantling Of Boiler Exit Flue Gas Damper 147 Dismantling, And Erection Of Boiler I.D., F.D. Fan Impeller 148 Fabrication Of Staging Of C / F Machine Nk 1100 And Erection And Commission Of C / F Machine Nk 1100. 2 Nos 149 Replacement Of Weak Portion Of Molasses Tank Up To A Height Of10 Mtr By 6 Mm, 8 Mm, 10 Mm , 12 Mmplate Etc. 150 Providing Roof Above Molasses Khacha Pitby M.S. / Cgi Sheets Withproper Columns, Staging And Tresses 151 Dismantlingandassembling Of Air Heater Outlet Ducting 152 Dismantling Of Worn Out Air Heater Tubes 153 Replacement Of Worn Out Air Heater Tubes. 154 Dismantling , Fabrication, Erection Of Worn Out Both Boiler Blow Down Line Boiler To Drain Pit. 155 Dismantling, Fabrication, Erection Of Worn Out Of 2 Nos. 5” Long Bend Of Feed Water Line Header 156 Replacement Of Juice Heater Partition Plate In All Respects 157 Reconditioning Of Worn Out 02 Nos. J.H. ( 04 Nos Covers ) Juice Heater Grooves With Respect To Its Top / Bottommating At Outside Cover 158 Dismantling Of Worn Out Body Shell Of Any Quad Body 159 Fabricationanderection Of Body Shell Of Anyquad Body 160 Dismantling , Fabrication, Erection Of 10 X 20 Vacuum Filter Mud Tray 161 Dismantling Of Worn Out Body Shell Of Anypan 162 Fabricationanderection Of Body Shell Of Anypan 163 Dismantling , Fabrication, Erection Of 8 X 16 Vacuum Filter Mud Tray 164 Pan No. 3 Retubing Work 165 Dismantling Of Worn Out Bottom And Fabrication And Erection Of New Bottom Of Crystalizer No. 3, 4, 9 10 And 11 166 Dismantling Ofcalanderia Ofpan 167 Fabrication, Erection Of Calanderia Ofpan 168 Dismantling Ofcalanderia Ofquad ( Evaporator ) 169 Fabrication, Erection Of Calanderia Ofevaporator ( Quad ) 170 Increasingthe Length Of Hydraulic Grab Fingers 171 Dismantling , Fabrication, Erection Ofkicker Drum With Holder Assembly 172 Dismantling , Erection Commissioning Of Pan Discharge Valve Of Pan No 5 And 6 173 Modification Of Mill Kush Kush Conveyor 174 Dismantling , Erection Commissioning Of Crystallizer Shaft 175 Fabrication, Erection Of New Juice Door Filtration System 176 Dismantling , Fabrication, Erection Offlocculating Chamber Top Andbottom Plate Of Door 177 Crystallizer Spiral Ribbon Strip Has To Dismantle And Again Set Right Fitting. Worn Out Armsandother Related Work Also To Be Done 178 Dismantling , Fabrication, Erection Ofworn Out Runner Of Cane Carrier / Bagasse Elevator / Rbc / Mbc 179 Dismantling The Kush-Kush Conveyorandhole To Beincreased 180 Dismantling , Fabrication, Erection Ofworn Out Portion Of D.S.M. Screen 181 Fabrication, Erection Ofi.D Fan Cone Ring With Flange 182 Erectionandcommissioning Ofb- Messcutte C / F Machine Including Machine Structure , Leveling Of Machine And Related Work To Be Done In All Respect Of M / C 183 Dismantling Of Oldworn Out And Fabrication, Erection Ofnew Juice Sulphitor Internal Drum 184 Juice Ring Fabrication By 6Mm Plate For Mill Rollers 185 Hinge Type Cover Fabrication At Chopper, Levelerandcutter 186 Railway Line Changing Of Cane Unloader 187 Dismantling , Fab. & Erection Of Condenser Catcher Of Vaccum Filter 188 Dismantling , Fab. & Erection Of Molasses Conditioner Of Pan 189 Labour Supply Of ( Per Day 8 Hr. Basis ) Turner, Mechinist, Fitter, Electrician, Wireman, Welder 190 Labour Supply Of ( Per Day 8 Hr. Basis ) Helper And Khalasi 191 Supply Of ( Per Day 8 Hr. Basis ) Draftsman, Foreman

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Tender for FABRICATION JOBWORK SEASON 2022-23
Sl. No. Item Description
1M.S Pipe Line
2Dismantling of pipe lines 1” to 3’’
3do 4’’to 11’’
4do12” to 20”
5do 21’’to48’’
6M.S Pipe Line
7Erection of pipe line from 1” to 3” dia
8do4” to 11”
9do12to20
10do 21 to 48
11Fabrication of pipe line from 12”above
12Flanges and blind up to 48”
13dismantling of flanges/blind
14refitting of old/new flanges/blind
15fabrication of flanges blind from M.S. plateupto 48"
16Bends, reducersandnipples (up to 1’’ to 12’’)
17Dismantling
18fabrication
19fitting
20Bends, reducersand nipples (above 12’’)
21Dismantling
22fabrication
23fitting
24Dismantling , fab.anderection of M.S. / G.l pipe Accessories ( Tee, cross, distance piece7” to 12’’)
25Dismantling
26Fabrication
27Erection
28Dismantling , fab.anderection of M.S./G.l pipeAccessories ( Tee, cross, distance piece above 12’’)
29Dismantling
30Fabrication
31Erection
32Dismantling , fab.anderection of M.S. / G.l pipeAccessories ( Tee, cross, 0 to 6”)
33Dismantling, Fab.and Erection of M.S. tanks,/Vassals from M.S plates, angle M.S channel ‘I’ section etc ( up to 6 mm plate
34Dismantling
35Fabrication
36Erection
37Dismantling, Fab.and Erection of M.S. Tanks/vessals from MS plate , angles, MS channel , I- section etc.
38Dismantling
39Fabrication
40Erection
41DismantlingandErection of railing
42Dismantling
43Fabrication
44Erection
45Valves
46Dismantling 1’’ to 6’’
47Dismantling 7’’ to 12’’
48Dismantling above 12’’ size
49fitting 1’’ to 6’’
50fitting 7’’ to 12’’
51fitting above 12’’ size
52S.S Pipe Line
53Dismantling of all size
54Erection all size
55Dismantling, fab., anderection of S.S. pipe Accessories (tee, cross, distance piece, nipples reducer and bend) up to 12”
56Dismantling
57Fabrication
58Erection
59Patch Work on tankandpipe(M S plate cutting, fittingandwelding, 02 round welding)
60Dismantling , FabricationandErection of cone of bigger size will be treated
61Dismantling
62Fabrication
63Erection
64FabricationandErection of gutter of any size by Required thickness (bigger size will be treat as dia)
65Dismantling , fabricationanderection of 3 Nos. hood of cutter, chopper and leveler by 8/6 mm M.S. plate
66Dismantling , Fabricationanderection of old feed pipe line Feed pump to boiler
67Dismantling of oldanderection of new I D Fan taper cone.
68Dismantling, Fabricationanderection of old ducting from I.D. fan inlet damper to I D Fan .
69Dismantling , Fabricationanderection of flue gas ducting size 5’ x 5’
70Dismantling , fabricationanderection of I.D. fan casing form8 to 10mm M.S plate
71Dismantling , fabricationanderection of I.D. Fan outlet damper
72Dismantling , fabricationanderection of I.D.Fan inlet damper
73Dismantling ,fabricationandErectionof Bagasse elevator, bagasse carrierandRBC bottom and side plate worn out portion
74Dismantling , fabricationanderection of Boiler bagasse feeding Chute by 8/6 mm M.S. plate.
75Dismantling , erection and fabrication of umbrella of pan.
76Dismantling , fabricationanderection of save all of Quad body.
77Dismantling
78Fabrication
79Erection
80Dismantling , FabricationandErection of save all of pan.
81Dismantling
82Fabrication
83Erection
84Stair case( fab. with chaquered plate /old plate and pipe line)
85Dismantling
86Fabrication
87Erection
88Dismantlingand erection of pump up to 4’’and15 hp motor Shifting of pump/motor upto 20 mtr distance
89Dismantling
90Erection
91Dismantlinganderection of pump more than 4”and15 H.P motor Shifting of pump / motor more than 20 mtr distance
92Dismantling
93Erection ( pump / motor)
94Ammoniaandgas coils( Dismantling , fab.and erection)
95Dismantling
96Fabrication
97Erection
98Dismantling, fabricationanderection ofnew plate form asPer requirement from old M S plate 6mm to 8 mm thickness.up to 2 sqm
99Dismantling
100Fabrication
101Erection
102Dismantling , fabrication,anderection of new Plate from by M S/ chequared plate more than 2 sq mtr
103Dismantling
104Fabrication
105Erection
106Crystallizer Coils
107Dismantling
108Fabrication
109Erection
110Old and worn out staging, plate farm tank, vassals.
111Dismantling
112Fabrication
113Erection
114Repairing of rubber seated exhaust /vapor valve above 16 “
115Dismantling , fabricationanderection of side plate of canekicker cutter, leveler, and chopper by 8/6 mm M.S. plate
116Dismantling , fabricationand erection of mill juice tray by 8 mm/10 mm M.S plate
117Dismantlingof existing cane carrier chute and fabricationanderection of 8 to 10 mm M.S plate
118Repairing of steam jacket for sulphur furnace
119Replacement of steam jacket of evaporator bodies
120Strengthening of vapour line above 16”by innerand outer side/ring of angle/pipes
121Dismantling , fabricationanderection ofsupport angle, pipe,channelat any equipment
122Hopper centre piece by 12 mmplate
123Dismantling
124Fabrication
125Erection
126Hopper tray
127Dismantling
128Fabrication
129Erection
130Sulphur Furnace cooler dismantling, fab. and erection work
131Sulphur Furnace scrubber dismantling, fabrication and erectionwork
132‘B’ Vacuum crystallizer shell to be changed from 10 MM M.S. plate
133‘C, Vacuum crystallizer shell to be changed from 10 MM M.S.plate
134Dismantling ,Fabrication & Erection of S.F. Chamber with cooling Jacket complete.
135Strengthening of factory columns of various size by 10 mm M.S.Plate angle channels etc.
136Strengthening of factory beams of any size by M.S.plate angle channelI. Section etc.
137Chipping ,cleaning and painting of columns and beams orstaging of factory machinery.
138Painting one coat with ready mixed paint in factory building M.S. column ( 25 mtr approx. height. and15-5 mtr height approx) And M.S trusses including rubbing down old(if required at site. All the bracing and purlins are included with this work.
139Dismantling, Fabrication and erection of any size factory/Building, columns beams and trusses
140Dismantling ,Fabrication and erection of worn out Water pipes, nozzles, drain box etc.
141Dismantling ,Fabrication and erection of worn out shell ofboth wet Scrubber
142Dismantling, Fabrication and erection of worn out internal of both wet Scrubber
143Dismantling, Fabrication and erection of wornflue gas ducting Size 5’ x5’of both Wet Scrubber from damper to chimney
144Replacement of worn out portion of supports of molasses tank roof.
145Replacement of worn out portion ofroof of molasses tank
146Dismantling of Boiler exit flue gas damper
147Dismantling, and erection of Boiler I.D., F.D. Fan impeller
148Fabrication of staging of C/F machine NK 1100 and erection and commission of C/F machine NK 1100. 2 Nos
149Replacement of weak portion of molasses tank up to a height of10 mtr by 6 mm,8 mm,10 mm , 12 mmplate etc.
150Providing roof above molasses khacha pitby M.S./CGI sheets withProper columns, staging and tresses
151Dismantlingandassembling of air heater outlet ducting
152Dismantling of worn out Air Heater tubes
153Replacement of worn out Air Heater tubes.
154Dismantling , fabrication, erection of worn out both boiler blow down line boiler to drain pit.
155Dismantling, fabrication, erection of worn out of 2 nos. 5” long bend of feed water line header
156Replacement of juice heater partition plate in all respects
157Reconditioning of worn out 02 Nos. J.H. ( 04 Nos covers)Juice Heater grooves with respect to its top/bottommating at outside cover
158Dismantling of worn out body shell of any quad body
159Fabricationanderection of body shell of anyquad body
160Dismantling , fabrication, erection of 10" x 20 " vacuum filter mud tray
161Dismantling of worn out body shell of anypan
162Fabricationanderection of body shell of anypan
163Dismantling , fabrication, erection of 8" x 16 " vacuum filter mud tray
164Pan No. 3 Retubing work
165Dismantling of worn out bottom and fabrication and erection of new bottom of Crystalizer no. 3,4,9 10 and 11
166Dismantling ofcalanderia ofpan
167Fabrication, erection of calanderia ofpan
168Dismantling ofcalanderia ofquad (evaporator)
169Fabrication, erection of calanderia ofevaporator ( quad)
170Increasingthe length of hydraulic grab fingers
171Dismantling , fabrication, erection ofkicker drum with holder assembly
172Dismantling , erection commissioning of pan discharge valve of pan no 5 and 6
173Modification of mill Kush Kush Conveyor
174Dismantling , erection commissioning of crystallizer shaft
175Fabrication, erection of new juice door filtration system
176Dismantling , fabrication, erection offlocculating chamber top andbottom plate of door
177Crystallizer spiral ribbon strip has to dismantle and again set right fitting. Worn out armsandother related Work also to be done
178Dismantling , fabrication, erection ofworn out runner of cane carrier/bagasse elevator/ RBC/MBC
179Dismantling the kush-kush conveyorandhole to beincreased
180Dismantling , fabrication, erection ofworn out portion of D.S.M. screen
181Fabrication, erection ofI.D fan cone ring with flange
182Erectionandcommissioning ofB- messcutte C/F machine including machine structure ,leveling of machine and related work to be done in all respect of M/C
183Dismantling of oldworn out and fabrication, erection ofnew juice sulphitor internal drum
184Juice ring fabrication by 6mm plate for mill rollers
185Hinge type cover fabrication at chopper, levelerandcutter
186Railway line changing of cane unloader
187Dismantling ,Fab. & Erection of condenser catcher of vaccum filter
188Dismantling , Fab. & Erection of molasses conditioner of Pan
189Labour supply of ( per day 8 hr. basis) Turner, Mechinist,Fitter, Electrician, Wireman, Welder
190Labour supply of ( per day 8 hr. basis) Helper and Khalasi
191Supply of ( per day 8 hr. basis) Draftsman, Foreman
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail