| 1 | Part \"A\" Bhat Mohalla |
| 2 | Earth work in excavation in all kinds of soil by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth,as per the directions of engineer incharge complete job in all kinds of soil |
| 3 | Supply and laying of dry stone soling (hand packed) in foundation trenches and ramming, including all leads, lifts cost and carriage of materials involvedcomplete. |
| 4 | P/L in position Cement Concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level1:4:8(1 cement 4coarse sand : 8 graded crusher stone agg.) 40mm nominal size all leads lifts cost & carriages of materials involved upto site of work complete |
| 5 | Random rubble masonry with hard stone from quarry in foundation and plinth in cement mortar 1:6 (1cement : 6 course sand), including leveling up with cement concrete 1:6:12 (1cement: 6 course sand: 12 graded stone aggregate 20mm nominal size) at plinth level with all leads lifts cost & carriages of materials involved upto site of work complete |
| 6 | Dry Random Rubble masonry in foundation and plinth using quarry stones with bond stones all leads lifts cost & carriages of materials involved upto site of work complete. |
| 7 | P/L 50mm thick Cement concretecoopingwith cement conc. 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone agg. 20mm nominal size with all leads lifts cost & carriages of materials involved upto site of work complete. |
| 8 | Pointing on stone work with cement mortar 1:4 (1cement : 4 fine sand) Flush Pointing including all cost and carriages involved |
| 9 | Supply & Filling of 2nd class stones/ Nallah Boulders for back filling behind walls including ramming, dressing, consolidation etcwith all leads, lifts, cost & carriages of involved materials upto site of work complete |
| 10 | Taking of photographs ofsize 125mm x100mm pre Execution, DuringExucation and PostExecution to be submitted with bill complete Job. Geo tagged photographs showingLongitude and latitude. |
| 11 | Part \"B\" Mughal Mohalla |
| 12 | Earth work in excavation in all kinds of soil by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth,as per the directions of engineer incharge complete job in all kinds of soil (Kacha Drain) |
| 13 | Earth work in excavation in all kinds of soil by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth,as per the directions of engineer incharge complete job in all kinds of soil |
| 14 | Supply and laying of dry stone soling (hand packed) in foundation trenches and ramming, including all leads, lifts cost and carriage of materials involvedcomplete. |
| 15 | P/L in position Cement Concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level1:4:8(1 cement 4coarse sand : 8 graded crusher stone agg.) 40mm nominal size all leads lifts cost & carriages of materials involved upto site of work complete |
| 16 | Random rubble masonry with hard stone from quarry in foundation and plinth in cement mortar 1:6 (1cement : 6 course sand), including leveling up with cement concrete 1:6:12 (1cement: 6 course sand: 12 graded stone aggregate 20mm nominal size) at plinth level with all leads lifts cost & carriages of materials involved upto site of work complete |
| 17 | Dry Random Rubble masonry in foundation and plinth using quarry stones with bond stones all leads lifts cost & carriages of materials involved upto site of work complete. |
| 18 | P/L 50mm thick Cement concretecoopingwith cement conc. 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone agg. 20mm nominal size with all leads lifts cost & carriages of materials involved upto site of work complete. |
| 19 | Pointing on stone work with cement mortar 1:4 (1cement : 4 fine sand) Flush Pointing including all cost and carriages involved |
| 20 | Supply & filling ofstones into wire crates with wire of 4mm dia anealed wireincluding hand packing tightly with tipping and tightening of crates with cost of crates. All inclusive with cost, labour & carriage of all involved materialscomplete job (Including cost of crates). |
| 21 | Supply & Filling of Khak Bajri / Quarry Muck for back filling behind Crates/ R Walls including ramming, dressing, consolidation etcwith all leads, lifts, cost & carriages by mechinical transport with all materials involved upto site of workcomplete |
| 22 | Providing &laying of RCC spun pipes in position including earth work cutting, laying of pipes in position & re-filling of excavated materials, providing sufficient cushions over pipes including loading, unloading, cost & carriages of pipes upto site of work complete. 12\"\" dia |
| 23 | Taking of photographs ofsize 125mm x100mm pre Execution, DuringExucation and PostExecution to be submitted with bill complete Job. Geo tagged photographs showingLongitude and latitude. |
| 24 | Part \"C\" inner links of Kalayban(Qureshi & Gaggi Mohalla) |
| 25 | Earth work in excavation in all kinds of soil by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth,as per the directions of engineer incharge complete job in all kinds of soil (Kacha Drain) |
| 26 | Earth work in excavation in all kinds of soil by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth,as per the directions of engineer incharge complete job in all kinds of soil |
| 27 | Supply and laying of dry stone soling (hand packed) in foundation trenches and ramming, including all leads, lifts cost and carriage of materials involvedcomplete. |
| 28 | P/L in position Cement Concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level1:4:8(1 cement 4coarse sand : 8 graded crusher stone agg.) 40mm nominal size all leads lifts cost & carriages of materials involved upto site of work complete |
| 29 | Random rubble masonry with hard stone from quarry in foundation and plinth in cement mortar 1:6 (1cement : 6 course sand), including leveling up with cement concrete 1:6:12 (1cement: 6 course sand: 12 graded stone aggregate 20mm nominal size) at plinth level with all leads lifts cost & carriages of materials involved upto site of work complete |
| 30 | Dry Random Rubble masonry in foundation and plinth using quarry stones with bond stones all leads lifts cost & carriages of materials involved upto site of work complete. |
| 31 | P/L 50mm thick Cement concretecoopingwith cement conc. 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone agg. 20mm nominal size with all leads lifts cost & carriages of materials involved upto site of work complete. |
| 32 | Pointing on stone work with cement mortar 1:4 (1cement : 4 fine sand) Flush Pointing including all cost and carriages involved |
| 33 | Supply & Filling of 2nd class stones/ Nallah Boulders for back filling behind walls including ramming, dressing, consolidation etcwith all leads, lifts, cost & carriages of involved materials upto site of work complete |
| 34 | Supply & spreading of Querry/Nallah Muck /RBM to specified lines ,grades & cross sections includingwatering dressing and consolidation with power road roller (8-10) ton capacity to reqired gradient and camberwith loading unloading costand carriage of materials upto site of work complete jobas per relevant clause of MORTH specification. |
| 35 | Supply, stacking & spreading of 63mm to 45mm size stone aggregate. (Quary Crushed)Includingapplying stone screening of 13.20 mm size @16% & binding material @ 8% of total quantityincludingconsolidation with Power Road Roller with 8-10 Tonne capacity to required gradient and camber. Complete job as per relevant clause of MORTH specification including scarifying of damaged road surface toGeometricalsize. All inclusive with costs & carriages of all involvedmaterials upto site of work (Compacted quantity after deduction of voids) |
| 36 | Providing &laying of RCC spun pipes in position including earth work cutting, laying of pipes in position & re-filling of excavated materials, providing sufficient cushions over pipes including loading, unloading, cost & carriages of pipes upto site of work complete. 12\"\" dia |
| 37 | Taking of photographs ofsize 125mm x100mm pre Execution, DuringExucation and PostExecution to be submitted with bill complete Job. Geo tagged photographs showingLongitude and latitude. |