| 1 | Laying of pipe line ,Head works, Other Balance Works |
| 2 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etcalong with required fittings & specials and construction ofvalve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office,Chlorination arrangement, installation of submersible pump with motor in deep Tube well etc.as perdetail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN andin ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7mwithout any likage in the entire PWS system as per direction of Engineer-in-charge. |
| 3 | Construction of 75,000 LTR OHR WITH 12MSTAGINGSupplying of alllabour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 75,000 ltrscapacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of100 mm medium grade GI pipe Tata/Jindal/Sailmake confirming to IS specification of requiredlength from production well to ESR & ESR to rising main includingin-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampurat his own cost) |
| 4 | OVER GROUND RESERVOIR(1,00,000 Ltr capacity )R C Cstorage reservoirSupplying of alllabour,T&P, material including taxes , testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC Under ground reservoir of100,000 ltrscapacity Cylindrical Container with circular dome, full raft using CC M-25 , withPCC layers as per approved drawing,supplying, fitting & fixing of 100 mm dia medium grade GI pipe Tata/Jindal/Sail/Nezonemake confirming to IS specification of requiredlength from PW to UGR & UGR to rising main includingin-let,out-let,over flow & washing line of UGR, and use ofaluminium ladderinside the OGR,CI puddle collar,0.6 m dia CI manhole cover at dome(2 Nos.) , RCC vent with brass jally,l,water level indicatoretc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR/VSS UT,Burla /NIT,Rourkela /IIT,BBSR/PMEC,Berhampur at his own cost) |
| 5 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure-G& H) |