| 1 | Dismantlingbrickwork tile, masonry or tile lining((b)) In cement |
| 2 | Dismantling concreteLimeconcrete,cement concreteof1:6:12orleaner mix |
| 3 | Removingdoorsand windows together with the dismantling of walls (i) Doors |
| 4 | (ii) Windows |
| 5 | (iii) Clerestory windows |
| 6 | Scraping (c) Cement plaster |
| 7 | CENTRING AND SHUTTERING Centering and shuttering for flat surfaces such as suspendedfloors,roofs, landings, chajjas, shelves etc. |
| 8 | CONCRETE Reinforcedcement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibratorbutexcludingsteel reinforcement centring and shuttering in superstructure. |
| 9 | Cement concrete 1:4:8 with stone ballast 20mm gauge(ii)mixingbymechanical meansusingconcretemixer volumetric type |
| 10 | BRICK WORK Firstclassburntbrick work laid in cement sand mortar 1:5 in foundation and plinth |
| 11 | PLASTERING & POINTING Plastering on underside of ceiling 10mm |
| 12 | 12.5 mm thick cementplaster 1:4 |
| 13 | 20mmthickcement plasterindampproofcourse 1:3 with two coats of bitumen at1.65Kg.PerSqmlaidhot and sanded((a)) Vertical |
| 14 | 12.5 mm thick cement plaster 1:4 |
| 15 | LOADING AND UNLOADING By Manual Means Stone(buildingor pitching) Sand, Earth, Fly Ash, Bajri, Shingle, Spalls, Brick bats,BrickballastandStone metal. |
| 16 | FLOORING & DADOS Conglomeratefloor 40mmthickcementconcrete topping 1:2:4 using mechanicalmixerformixing of material |
| 17 | Providing & fixing glass strips 4mm thick in floors(a) 50 mm wide |
| 18 | 40mm thick grey polished flooring cement concrete 1:2:4 toping finished with 3 mm thick neat coat of cementrubbedandpolished using mechanical mixer for mixing of material |
| 19 | EARTH WORK Extra For compensation &royaltyforOrdinaryearth/ Ordinaryclaytakenfrom private land. |
| 20 | Earth work in excavation in foundations trenches etc. in allkindsofsoilwhere Pick-Jumperworkisnot involvedandnotexceeding 2.0 metres depth including dressing of bottom and sides oftrenches,stackingthe excavated soil clear from the edgeofexcavationand subsequent filling around masonry in 15 cm, layers with compactionincludingdisposal of all surplus soil as directed within lead of 30 metres. |
| 21 | STEEL AND IRON WORK Supplyingandfixing of Japani sheet frames (Chowkat) consisting of 18 gauge(1.25mm)thicksteel sheet of the specified section (standard design latest), including iron lugs (hold fasts) iron hinges conforming to PWD specifications including bolts for fixing steps, lock notchprovisionforreceiving tower bolts and finished, fixed inpositionincludingthecost of cement concrete 1:3:6 for fillingintheframeand cement concrete 1:2:4for lugs completetothe satisfaction of Engineer-in-charge.(a) Doors and windows frame of size 118mm x 60mm with 40mm wide single rebateweighing3.43kgper meter. |
| 22 | Cold twisted detormed(Ribbed/Torsteel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete |
| 23 | WOOD WORK Hollock wood doors shutterwindows shutter including hinges, screws, chocks, cheats,stopscords etc. complete fixed in position.(a) panelled, glazed or glazed and panelled.(ii) 35 mm thick |
| 24 | Hollock wood cup boardshutterwithplywood panelsorfacedonbothside fixed in position (excluding the cost of handles, bolts hasp withstaplebutincludingthe labour for fixing them)(a) 30 mm thick |
| 25 | Cost of aluminum fittings complete for doors, windows such as tower bolts, handles,Stoppers and screw etc.forthese fittings (Excluding sliding bolt)(ii)Forshutterareaabove 0.50 sqm |
| 26 | Providingandfixing aluminumslidingdoorbolts ISImarkedanodized(anodic coating not less than grade AC 10asperIS: 1868) transparentor dyed to required colour or shade with nuts and screws etc. complete :(A) 300mm x 16mm |
| 27 | WHITE WASHING, DISTEMPERING,PAINTING& POLISHINGApplyingpinkprimer or aluminum priming coat on woodworkincluding preparation of surface knotting and stopping etc. |
| 28 | Painting two or more coatsexcludingprimingcoat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade. |
| 29 | White washing (two or more coat) |
| 30 | Distemperingwithdry distemper of approved manufacture two or more coats on old distempetered surface when shade is changed |
| 31 | Finishingwallswith exterior decorative cement based paint such as snowcem, robbiacem etc. two or more coats to give an even shade |
| 32 | COMMON SCHEDULE OF RATES RECESSED HDPE PIPE WIRINGSYSTEM WITH MODULAR SWITCHES:Wiring in PVC insulated copper conductor single core FR cable (ISImarked),overall1.5sq. mm,1100voltsgradetobe laid in HDPE electrical conduit pipe 20mm/25mm dia. ISI Marked, recessed in wall etc., complete with powder coated/anodizedconcealed metal boxes (1.6mm thick withBrasslugs)requiredfor suitablenumberofmodules (Modular accessories) for having Step type electronic fanregulators(twomodule) 100watts,bellpush,6Amp. 2/3 universal socket (shuttered), 16/20Amp. combined/ universal Socket (shuttered), 6/10Amp. Switches, 16/20Amp. switches with indicator etc. and covered with Frame Plate etc., PVCconnector(ForFanBox and Call Bell), PVC Bush, Steel Hooks,Sheetmetalfanbox (1.6mm thick shape hexagonal),CICircular junction Boxes (Four way 1½\" deep for walls and 3\" deep for ceiling), bonding to earth with PVCinsulatedcopper conductor single core FR cable (ISImarked)1sq.mm, 1100voltsgrade(For6Amp. wall socket & plug control point) and other petty material etc., including the cost of above material, cutting and filling up of chases (withfinishing the surface):-(i) b) Wiring fan point (With fan box) |
| 33 | (ii)) Wiring light point |
| 34 | SHEETMETALIRON CLAD SWITCHES:Supplyanderectionofsheet metalIronCladSwitcheson existing surface with G.I. bolts &nuts/ragboltsandnuts etc., according to the size of holes in the body of the enclosureincluding connections with suitable size ofthimblesandbondingto the existing earth as Per PWD General Specifications:-(xi)PORCELAINFUSE UNITS:Supply and erection of PorcelainFuseUnitwith Extension Strip on existing surface with G.I. bolts & nuts/ ragboltsandnutsetc., includingconnectionswith suitablesizeofthimblesand bonding to the existing earth asPerPWDGeneral(a)PorcelainFuseUnit 16Amp., 240volts |
| 35 | Providing & Fixing ISI marked electric fan & regulator etc complete in all respect as per approval of Engineer in-charge). |
| 36 | Providing & fixing ISI marked CFL Bulb 25 w complete in all respect. |
| 37 | Providing&fixingrainwater pipe complete in all respect. |
| 38 | CARRIAGE((i)) Earth,Surkhi, Sand, Earth,FlyAsh,Bajri,Ballast, Stoneboulders,Kankarand building rubbish, Earth.Jallalabad Sand |
| 39 | Pathankot Sand+ Bajri |
| 40 | Tibba Sand (Lead 5 Km) |
| 41 | HOISTING,ROOFINGAND WATER PROOFING Providingandfixing asbestoscementrainwater pipe100mmdiawithM.S. holder and clamps fixed on |
| 42 | Providingandfixing asbestos shoe for asbestos cement rain water pipe in position. |
| 43 | Providingandfixing cast iron head for rain water pipe on wooden plugs fixed on wall face including |
| 44 | Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement |
| 45 | Bottom khurra on ground 1.2m 0.6m consisting of bricks on edge laid in cementmortar1:3over7.5 cm 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement |
| 46 | Providing and placing in horizontal layers filtering mediascreened,washedand cleaned as described below:-(a) Top Layer:Top layer:----- Finesandscreened, cleaned andwashed and graded(effectivesize0.2to 0.4mm with uniformity coefficient 2.00to3.00) from Pathankotorotherapproved source. |
| 47 | TakingoutfilterMedia(Top layer)Washing,Screening& Placing the same in CTP complete in all respect. |
| 48 | Carriage of MaterialTop Layer lead Pathankot (300 Km) |
| 49 | Converting Lift |
| 50 | Taking out filter Media(2nd to 5thlayer) and replacing the same after washing screening CTP complete in all respect. |
| 51 | Washing the Filter beds complete in all respect. Taking out and ne hoisting RCC plates after |
| 52 | Washing the flase floor slabs complete in all respect. |
| 53 | Hoisting R.C.C. bed plates and placing in position |
| 54 | Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with thepriorapprovalof Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting,jointingandtesting complete as per specifications.(v)160mmo/dpipeof10 Kgf. / sqcm |
| 55 | Contraction of Plinth ProtectionaroundtheOHSR 125 Cum Capacity complete in all respect.(As per Drawing Attached) |
| 56 | Construction of brick Masonary Boundary wall 1.75 Mtr Height complete in all respect. (As per Drawing Attached) |
| 57 | CONSTRUCTION OF 3.00 METRE WIDE FOOT PATHS WITHCEMENTCONCRETE INTERLOCKING PAVER BLOCK INSIDEWATERWORKS COMPLETE IN ALL RESPECT.(As per Drawing Attached) |
| 58 | Providing & Fixing floating arm in position complete with sluice valve long spindle band wheel brackets and guides complete in all respects.150 mm i/d 2.00 Mtr long of engineer-in charge. |
| 59 | Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410)andBronze(gunmetal) workingpartsSluiceValves ISI marked 14846-2000, includingjointing,testing& costofNut,Bolt&insertion sheet,allcarriagecomplete (with the approval of Engineer in-charge).(A) Class PN-1 as per ISI(a)80mmi/dSluiceValves flanged |
| 60 | (b)100mmi/dSluiceValves flanged |
| 61 | (c)150mmi/dSluiceValves flanged |
| 62 | Construction of masonary Sluice Valve ChamberexcludingSluice valvecoverasperstandard design&drawingsofpublic health department.(b) Size 0.9 m. x 0.9 m. |
| 63 | Providing & Fixing floating arm in position complete with sluice valve long spindle band wheel brackets and guides complete in all respects.150 mm i/d 2.00 Mtr long of engineer-in charge. |
| 64 | ImprovementofLeakageof Pipe lines including material & labour Complete in all respect as per approval of Engineer-in Charge90mm o/d |
| 65 | ImprovementofLeakageof Pipe lines including material & labour Complete in all respect.as per approval of Engineer-in Charge110mm o/d |
| 66 | ImprovementofLeakageof Pipe lines including material & labour Complete in all respect.as per approval of Engineer-in Charge160mm o/d |
| 67 | ImprovementofLeakageof Pipe lines including material & labour Complete in all respect.as per approval of Engineer-in Charge250mm o/d |
| 68 | Providinghousehold connectionwith laying,jointing,fixing testing GI pipes B-Class (Jindal Make) (as approved by Engineer-in-charge),including cost of Excavation,Refilling 15 mm o/d GI pipe B-Class (Jindal Make) 4.50m(length onaveragebasis).3\"i/dPVC clamp,G.M ferrule ISI Marked, connectionof15mm i/dferrulemedium.Specials suchas tees,bends,sockets, elbows , nipples(100 mm & 150 mm),Union Couplings,GI hooks etc.and gun metal peet valve(heavypattern)with hand wheels on GI pipe B-Class(JindalMake)Lines laidinthegroundorinside buildings Cutting,Threading,Making hole in wall and testing in trenches in the ground All material Shouldbeofapprovedmake (to the approval of Engineer-in-charge)Complete jobinallrespectincluding cost of carriage.(ReferCSRitemnos.28.1,28.34b,,30.65,) |