Power Government Departments Closing in 0 days TDR #33143726

Work Under Maintenance And Repair, System Improvement And Deposit Scheme Of O.H., U.G. Line And Breakdown Work Of Lt Lines Distribution Jajmau Under The Area Of E.U.D.C.-Iii, Kesco. Kanpur.

Issued by Government Departments · jajmau, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Jul 2022
0 days left
EMD
18000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
jajmau → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Work Under Maintenance And Repair, System Improvement And Deposit Scheme Of O.H., U.G. Line And Breakdown Work Of Lt Lines Distribution Jajmau Under The Area Of E.U.D.C.-Iii, Kesco. Kanpur.

BOQ

Name of Work:
Sl. No. Item Description
1Electrical Items :
2Dismentalling of X-Arm/L.T. brackets and insulators etc. from the damaged pole/pole to be replaced/shifted.
3Excavation of foundation and taken out the damaged pole/pole to be replaced/shifted from the ground.
4Strengthening of damaged pole by providing and welding of pipe or angle by overlapping in the place of damaged portion.
5Loading, Carriage and unloading of STP poles from store to work site.
6Loading, Carriage and unloading of damaged poles from work site to store.
7Loading, Carriage and unloading of PCC Poles from store to work site.
8Grouting of pole with cement brick ballast and coarse sand as per Standard Spacification.
9Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.
10Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
11Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.
12Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials.
13Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification)
14Erection of Tri-Pole structure including fitting of channels etc. and proper alignment.
15Excavation of foundation and taken out the damaged PCC pole to be replaced.
16Grouting of PCC pole with cement brick ballast and coarse sand as per Standard Spacification.
17Erection ofnew PCC pole for L.T. O.H. line and fitting of all related hardware
18Increasing the pole length to Cross H.T./L.T. OH line by welding of M.S. pipe with all Material
19Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.
20Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
21Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles.
22Loading, carriage and unloading of conductor from store to work site and vice versa
23Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.
24Laying, stringing, tensioning and binding of Old & New Weasal conductor for H.T./L.T. O.H.
25Laying, stringing, tensioning and binding of Old & New Dog conductor for H.T./L.T. O.H.
26Fixing of guarding angle/guarding channel for laying of guarding Old & New
27Laying, stringing, tensioning & final sagging ofEarth wire/G.I. wire Old & New
28Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span)
29Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
30Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.
31Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.
32Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections.
33Fabrication/modifications of M.S. Items as per requirement of site conditions.
34Jumpering of H.T. Lines from the existing H.T.O.H. line.
35Jumpering of L.T. Lines from the existing L.T.O.H. line.
36Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.
37Dismentalling of Aearial Bunched Cable from L.T. O/H (damage) line.
38Loading, carriage and unloading of Aearial Bunched Cablefrom store to work site and vice versa.
39Laying of Old & New Aearial Bunched Cable for Erection of L.T. O/H Line.
40Mounting & Erection of single phase distribution box Old & New.
41Mounting & Erection of three phase distribution box. Old & New
42Opening and reconnection of consumer connections for shifted/replaced of pole.
43Making of cable box for 11/6.6 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)
44Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends With pipe (3Mtr. Long MS pipe will be provided by KESCo)
45Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends Without pipe
46Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line Single Core L.T. Cable
47Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 3 ½ Core L.T. Cable
48Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 11 KV H.T. Cable
49Loading, carriage and unloading of H.T.M.C. from store to site or vice-versa.
50Erection of H.T. metering cubical on plinth as per standard norms.
51Construction of plinth for H.T. pilffer metering cubical.
52Dismentalling of H.T. pilffer metering cubical.
53Erection of L.T. metering cubical as per standard norms and connection of L.T. Cable including crimping of Lugs etc.
54Earthing of supports/ metering cubical/ HTPB etc. as per standard specifications.
55Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa.
56Erection of O/D type Metering unit on D/P Structure.
57Connection of H.T. Jumper to HT Bushing of O/D type Metering unit.
58Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
59Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa.
60Erection of Distribution T/F on plinth/D/pole structure.
61Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer.
62Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.
63Connection of L.T. cable from L.T.D.B to L.T.O.H.
64To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
65Reparing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
66Reparing of T/F plinth, Size of the plinth will be 1.2 x 1.2 x 1.2 Cubic Mtr including civil matrial will be solid with brick work 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast with step.
67L/C for deep bore pipe earthing including (G.I. Pipe 40 mm. dia, B-Class, 40 feet, socket, cutter and earth wire size 7/14SWG with nut & bolt) with connecting the same with Distribution T/F Neutral & Body. All material will be provided by Contractor.
68Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth.
69Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion.

AI Tender Summary

OUR REF NO 33143726
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 25-07-2022
Authority
Authority Name Kanpur Electricity Supply Co Limited
Work Description Work Under Maintenance And Repair, System Improvement And Deposit Scheme Of O.H., U.G. Line And Breakdown Work Of Lt Lines Distribution Jajmau Under The Area Of E.U.D.C.-Iii, Kesco. Kanpur.
Basic Detail
Tender No 08/EUDC-III/2022-23
Bidding Type Tender
Location
City jajmau
State Uttar Pradesh
Key Dates
Publish Date 18 Jul 2022
Submission Date 25 Jul 2022
Open Date 25 Jul 2022
Finance
Tender Value Ref. Documents
Tender Fee 3540
EMD 18000
Exemption Not Available
Document List
558d745c-3cee-4ce3-8f33-3e12e6f44fda.html
BOQ_1152462.xls
ET-08-Tender-Doc.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 18, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 25, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 25, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

558d745c-3cee-4ce3-8f33-3e12e6f44fda.html

xls

BOQ_1152462.xls

pdf

ET-08-Tender-Doc.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders