Trenching, laying of PLB/HDPE/RCC/GI/DWC Pipes, reinstatement of the excavated trench, pulling/ laying of OpticalFibre / Copper Cable and fixing of route indicators at approximate every 200 Mtrs fixing of M.S. Clamps for suspending GI/DWC Pipes at culvert
Tender Overview
Project Description
Trenching, laying of PLB/HDPE/RCC/GI/DWC Pipes, reinstatement of the excavated trench, pulling/ laying of OpticalFibre / Copper Cable and fixing of route indicators at approximate every 200 Mtrs fixing of M.S. Clamps for suspending GI/DWC Pipes at culvert/bridges, preparation of A/T pits, horizontal boring/HDD to avoid road/ Tar cutting & associated work as per construction specification given in the tender document.The work is to be executed along the NHAI/NH/SH/MSH/ZP/CITY Roads in the in section No.PS-5 of Partur TE –TO-Selu TE 48 F OFC Route .
BOQ
| Sl. No. | Item Description |
| 1 | Trenching,pipelaying and associated works |
| 2 | Trenching, laying of PLB/HDPE/RCC/GI/DWC Pipes, reinstatement of the excavated trench, pulling/ laying of OpticalFibre / Copper Cable and fixing of route indicators at approximate every 200 Mtrs fixing of M.S. Clamps for suspending GI/DWC Pipes at culvert/bridges, preparation of A/T pits, horizontal boring/HDD to avoid road/ Tar cutting & associated work as per construction specification given in the tender document insection No.section No.PS-5 of Partur-Selu, 48F OFC Route |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender