Public Health Engineering Department-PHED has published Treatment Plant Based On Moving Bed Biological Reactor Technology ( Attached Growth Process ) To Combined Activated Sludge Process In Conjunction With Mbbr Bio Film Process With Addition Of Anoxic Tank, Individual Internal Recirculation Pumps, Return . Submission Date for this Tender is 22-07-2022. Sewage Treatment Plant Tenders in hansi Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Works Details |
2 | Upgradation and Commissioning after conversion of existing 7.5MLD capacity Sewage Treatment Plant based on Moving Bed Biological Reactor Technology (Attached growth process) to Combined Activated Sludge process in conjunction with MBBR Bio film process with addition of Anoxic Tank, Individual Internal Recirculation Pumps, Return activated sludge pumps, Aeration Tank, Treated Effluent Lifting Pumps in Tertiary Treatment Plant based on Dual Media Filters followed by Chlorination in existing STP complete in all respect with PLC, data transfer through modem to website and all other works contingent thereto including Operation and Maintenance of existing STP/MPS during up-gradation period and 3 months of trial run period, 12 months defects liability period after and 5 years thereafter on the commissioning of up-graded STP i.e. completion of Tertiary Treatment Plant at Hansi Town, Lalpura Road, District Hisar Entire Civil Works as per DNIT and existing structures any other work contingent thereto (As per detail attached and inclusive of O & M |
3 | Entire mechanical works as per DNIT Existing mechanical equipment any other works contingent thereto (As per detail attached and inclusive of O & M) |
4 | Entire Electrical & instrumentation works as per DNIT and existing electrical and instrumentation equipment any other work contingent thereto (As per detail attached and inclusive of O & M) |
5 | Guaranteed closure period of existing STPs (Amount to be loaded for recovery if delayed beyond guaranteed closure period) |
6 | Guaranteed completion period for the Up- gradation as per DNIT. (Amount to be loaded for recovery if delayed beyond guaranteed completion period) |