Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #33118416

14 Nos Providing Cc Pavemets In Chandhrasekarapuram, Kurukkapuram, Malaiyampatti, Muthukalipatti Panchayats At Rasipuram Block Of Namakkal District Under Agamt Ii 2021-2022 Package 73

Issued by Local Bodies · rasipuram, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
02 Aug 2022
0 days left
EMD
55800
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
rasipuram → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

14 Nos Providing Cc Pavemets In Chandhrasekarapuram, Kurukkapuram, Malaiyampatti, Muthukalipatti Panchayats At Rasipuram Block Of Namakkal District Under Agamt Ii 2021-2022 Package 73

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 27-Jul-2022 Extension of Date Date 02-Aug-2022

BOQ

Name of Work : 14 NosProviding CC Pavemets inChandhrasekarapuram,Kurukkapuram,Malaiyampatti,Muthukalipatti Panchayats atRasipuram Blockof Namakkal District Under AGAMT II2021-2022 Package73
Sl. No. Item Description
1Providing CC Pavement at Chandrasekarapuram Via road West Side 1 St StreetH/O Chandrasekarapuram
2Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
3Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
4Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
5Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
6Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
7Supply and fixing of Bitumenpad charge
8Providing CC Pavement at Chandrasekarapuram To Murungapatti road Therkkupatti East Side 1 St Street H/O Chandrasekarapuram
9Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
10Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
11Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
12Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
13Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
14Supply and fixing of Bitumenpad charge
15Providing CC Pavement from Karattupatti To Thattankuttai Via Road 4 Th StreetH/O Chandrasekarapuram
16Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
17Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
18Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
19Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
20Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
21Supply and fixing of Bitumenpad charge
22Providing CC Pavement at Kolingipatti PUE School East StreetH/O Kurukkapuram
23Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
24Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
25Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
26Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
27Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
28Supply and fixing of Bitumenpad charge
29Providing CC Pavement at Alagapuram 1 st Cross StreetH/O Kurukkapuram
30Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
31Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
32Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
33Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
34Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
35Supply and fixing of Bitumenpad charge
36Providing CC PavementatKolingipatti West Street H/O Kurukkapuram
37Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
38Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
39Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
40Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
41Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
42Supply and fixing of Bitumenpad charge
43Providing CC Pavement from Bhagavan colony3rdCross StreetH/O Malaiyampatti
44Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
45Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
46Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
47Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
48Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
49Supply and fixing of Bitumenpad charge
50Providing CC Pavement from Kudi Street H/O Malaiyampatti
51Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
52Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
53Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
54Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
55Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
56Supply and fixing of Bitumenpad charge
57Providing CC Pavement from Pananthoppu AR Street 3 rd Cross Street H/O Malaiyampatti
58Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
59Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
60Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
61Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
62Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
63Supply and fixing of Bitumenpad charge
64Providing CC Pavement from Pananthoppu AR Street 4th Cross Street H/O Malaiyampatti
65Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
66Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
67Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
68Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
69Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
70Supply and fixing of Bitumenpad charge
71Providing CC Pavement at ATC Nanbargal Nagar Vinayagarkovil upto Cross StreetH/O Muthukalipatti
72Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
73Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
74Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
75Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
76Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
77Supply and fixing of Bitumenpad charge
78Providing CC Pavement at Agharam Colony 4 Th Cross StreetH/O Muthukalipatti
79Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
80Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
81Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
82Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
83Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
84Supply and fixing of Bitumenpad charge
85Providing CC Pavement from Panchayat office Opposite To Agricultral Godown roadH/O Muthukalipatti
86Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
87Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
88Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
89Supply and fixing of Bitumenpad charge
90Providing CC Pavement at Agharam ColonyNorthSide Last Street H/O Muthukalipatti
91Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
92Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
93Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing
94Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
95Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
96Supply and fixing of Bitumenpad charge
97GST Amount for providing Service to Government Contract Works for the above RENEWALWorks. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

AI Tender Summary

OUR REF NO 33118416
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 02-08-2022
Authority
Authority Name Rural Development And Panchayats Department
Work Description 14 Nos Providing Cc Pavemets In Chandhrasekarapuram, Kurukkapuram, Malaiyampatti, Muthukalipatti Panchayats At Rasipuram Block Of Namakkal District Under Agamt Ii 2021-2022 Package 73
Basic Detail
Tender No 4046/2021/a9
Bidding Type Tender
Location
City rasipuram
State Tamil Nadu
Key Dates
Publish Date 27 Jul 2022
Submission Date 02 Aug 2022
Open Date 02 Aug 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 55800
Exemption Not Available
Document List
b1ddce79-d3d2-42fc-aaa7-621b2802cb01.html
73.pdf
BOQ_286021.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 27, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 02, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 02, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 02, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

b1ddce79-d3d2-42fc-aaa7-621b2802cb01.html

pdf

73.pdf

xls

BOQ_286021.xls

pdf

Tendernotice_1.pdf