|
| 1 | PART 1 - PS-Supply |
| 2 | Part A : RTU FOR CENTRALISED SCADA SYSTEMProject Management, Design, Engineering, Procurement of Materials, fabrications/ manufacturing, Inspection & Factory Acceptance Testing at works, Supply, Packaging, Shipping, Insurance, Port Handling, Custom Clearance, Inland Transportation to site, Storage & Safety, Installation along with necessary software, installation material, cables (all armored), Exp Cable Glands, connectors, power supply & surge protection devices, erection of foundation support channel on trench for panel erection, cable trays, test instruments / equipment, Test Run, Pre-commissioning activity,Commissioning, Training, Technical support, Warranty, Extended Warranty, Post Warranty Maintenance contract, Mandatory & commissioning spares, Documentation etc and shall be executed on turnkey indivisible works contract basis as per details scope of work, Technical Specification of RTU Annexure I to PJS, & Job specification PJS No. MEC/05/E5/T/Q7NK /PJS-094 (RTU) provided in the tender documents. All above with additionally supply & installation of RTU panels (size appx 800mm x 800mm x 2000mm plus 100mm base frame & 15 mm anti vibration pad), Preparation of data bank for RTU mapping with centralised SCADA as per desired format, Site Acceptance testing & Integration with FEP SERVERS & Centralized SCADA system, Integration with Telecom System & local IEDs complete in all respect. Location details will be provided after order placement or during detailed engineering. All proposed locations are tentative and may change during detailed engineering / execution; bidder shall follow instruction of client / EIC during installation. |
| 3 | Part A : RTU FOR CENTRALISED SCADA SYSTEM |
| 4 | Supply: Supply with all work define above |
| 5 | Remote terminal units (RTU) with accessories For Sectionalising Valve (SV) Stations. (Spare 2 no. Quantity) |
| 6 | Remote terminal units (RTU) with accessories For Receiving / Dispatch stations (Spare 1 no. Quantity) |
| 7 | Remote terminal units (RTU) with accessories For Intermediate Pigging (IP) Stations |
| 8 | PDT with all accessories including all cables & connectors as per the Technical specifications of RTU with RTU configuration software |
| 9 | Mandatory Spares:Supply of loose Mandatory Spares (For all RTU with spare - 10% of all type of Installed cards, convertors, power supply/ converters, termination boards, OEM cables between cards and termination boards, backplanes, relays, RTU chassis etc accounted & calculated considering total quantities of RTU of respective regions / states), during calculation of mandatory spares as defined in Particular Job Specification, PJS No. MEC/05/E5/T/Q7NK/PJS-094(RTU) (Bill of Material has to be provided along with offer, any fraction quantity should be round off to nearest number in higher side). Unit rate for Mandatory spares with cards details, part no., make etc. shall be given separately with the offer & price part. (10% Spare or Minimum One shall be calculated based on the total RTU quantities; region / state wise;) |
| 10 | Industrial standard Tool kit for equipments with leather bag |
| 11 | Test equipments as per specification |
| 12 | Portable Power Source cum Calibrator (Current & Voltage) as per specification |
| 13 | 4 ½ Digit Multi-meter as per specification |
| 14 | Protocol Analyser as per the specification defines in the Job specification PJS No. MEC/05/E5/T/23VA/PJS-094 Rev 0. |
| 15 | RTU test unit (test jig) with each type of RTU cards, power supply, CPU, communication, serial, AI,DI,AO,DO cards for simulating RTU test environment (to be mounted in 19” rack)( fully wired rackof 800 mm x 800 mm x 2000 mm plus base frame of 100 mm & 15 mm anti vibration pad) as per PJS MEC/05/E5/T/Q7NK/PJS-094(RTU) |
| 16 | Extended Warranty per month(The Extended Warranty is applicable only if completion of trial run/ acceptance of system by owner / handing over of system is delayed beyond 12 months from Supply (Date of receipt of Last material at site) and the delay is not attributed to contractor). All materials shall be considered to be in the custody of contractor fully insured with applicable conditions of warranty. This Extended warranty (after 12 months) is used to extend warranty for the delayed period till the start of Main warranty (i.e. 24 months), which is supposed to start on successful completion of trial run/ acceptance of system by owner / handing over of system (refer warranty clause). (Refer Note 6 to MR) (Decision of start date & no of month extension of extended warranty will be as per instruction of client/ EIC) |
| 17 | Total price including all costs, freight, insurance till commissioning, GST etc. |
| 18 | PART 2 -Site work |
| 19 | SERVICE AND SITE WORKInstallation, Testing & commissioning, Training, Interfacing with Instrumentation, Telecommunication, Electrical, CP system, APPS system any other work as define above, work for the completion/ hook-up of RTU to FEP and Centralized SCADA system complete in all respect as per MEC/05/E5/T/23VA/PJS-094(RTU) and as per the direction of the EIC. |
| 20 | Remote terminal units (RTU) with accessories For Sectionalising Valve (SV) Stations/ SV cum Tap-off stations |
| 21 | Remote terminal units (RTU) with accessories For Receiving S / Dispatch stations |
| 22 | Remote terminal units (RTU) with accessories For Intermediate Pigging (IP) Stations |
| 23 | Training (as defined in PJS MEC/05/E5/T/Q7NK/PJS-094(RTU) specifications at OEM testing facilities /Integration centre) before the final acceptance of the RTU for Centralised SCADA system by the Client |
| 24 | All inclusive per month rates for maintaining store at site for the supplied material of respective state / regions). (Refer Note 7) |
| 25 | All inclusive Man-day rates for services such as (all or less) installation/ supervision / configuration / simulations / data bank mapping/ integration /Testing & Commissioning of RTUs with SCADA system valid for the next 7 years from FOA within SAPL pipelines project applicable as & when required.The rates shall be valid for the next 7 year with the escalation from 3rdYear (from FOA) of 6 % of unit rate per year (date of FOA) as per SOR.(Note -9 of MR) |
| 26 | Total price including all costs including GST for SiteWorks |
| 27 | PART 3 - Post Warranty Period |
| 28 | Post warranty maintenance contract (PWMC) – comprehensive for supplied RTU and accessories, Testequipments complete as define in the Particular Job specification / bid document for complete system for 5 years after completion of main warranty / extended warranty complete in all respect as define in particular Job specification. Payment will be made on quarterly basis. (Note -8 of MR) |
| 29 | NOTE:1. The offer shall be evaluated on package wise basis ( Supply + Site Works +Post warranty maintenance contract ).2.The above shall be read in conjunction with notes of MR . |