Baghpat Cooperative Sugar Mills Limited has published Dismantling Fabrication And Erection Of Machinery For Year, 2022-23- 2 Dis., Of Old M.S. Pipeline With Flange, Bend Up To 30 Cm Dia 3 Erection Of Old & New M.S. Pipeline With Flange Up To30 Cm Dia 4 Fab., & Ere. Of Following Up To30 Cm Dia ( M.. Submission Date for this Tender is 27-07-2022. Gear Product Tenders in baghpat Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | DISMANTLING FABRICATION AND ERECTION OF MACHINERY FOR YEAR, 2021-22 |
2 | Dis., of Old M.S. Pipeline with Flange, Bend up to 30 Cm Dia |
3 | Erection of Old & New M.S. Pipeline with Flange up to30 Cm Dia |
4 | Fab., & Ere. Of following up to30 Cm Dia (M.S.) |
5 | Bends Erection only (Ready made) |
6 | Nipples |
7 | Cross |
8 | Tee |
9 | Reducer |
10 | Dis., of Valves up to30 Cm Dia |
11 | Fitting of Valves up to30 Cm Dia |
12 | Dis., of Valves above30 Cm Dia |
13 | Fab., ofValve above30 Cm Dia |
14 | Fab., & Ere. Of following above30 Cm Dia |
15 | Bend |
16 | Nipple |
17 | Flanges |
18 | Tee |
19 | Reducer |
20 | Blind |
21 | Dis., of Following above30 Cm Dia (M.S.) |
22 | Bend |
23 | Nipple |
24 | Flanges |
25 | Reducer |
26 | Dis., of M.S. Pipeline with Bend, Flanges, Nipple etc. above30 Cm Dia |
27 | Fabrication of M.S. Pipe above30 Cm Dia |
28 | Erection of M.S. Pipe above30 Cm Dia |
29 | Fitting of M.S. Ring over Vapour pipe. |
30 | Dis., of M.S. Heavy Structure |
31 | Dis., of M.S.Light Structure |
32 | Fab., & Ere. Of heavy structure |
33 | Fab., & Ere. Of light structure |
34 | Dis., Fitting of Plateformusing old/New material |
35 | Fab., & Ere. Of M.S. Railling from Old/New Material |
36 | Patching of worn out portion of round/Square vessel |
37 | Fab., & Ere. Of Square/Round closed/open tank with required connections. |
38 | Removal of S.S./Brass Tubes |
39 | Pan |
40 | Evaporator Bodies |
41 | Semikestner/Juice Heater |
42 | Fitting of S.S./Brass Tubes with Hydraulic testing for leak proof of the following |
43 | Pan |
44 | Evaporator Bodies |
45 | Semikestner |
46 | Juice heater |
47 | Dis., Cleaning & Re-Fitting of M.S. Pipeline with bends, flanges, nipples etc. |
48 | Dis., Fab., & Ere., of different size M.S. Coil |
49 | 2.5 cm Ø to 15 Cm Ø |
50 | above 15 Cm Ø |
51 | Fab., of Pump & Motor Bed with fitting & alignment etc. |
52 | Up to 30 HP |
53 | Above 30 HP |
54 | Dis., & Fitting of C.C., B.C., I.RC Runners |
55 | Reconditioning of Links of CC., BC to suit sizesofPin & Bush |
56 | Reconditioning of Links of RC.& IRC to suit sizes of Pin 32 mm Ø welding in holes of links & making size on lath machine:- |
57 | Three Hole Link |
58 | One hole link |
59 | Dis., & Fitting of New M.S. Bottom of IRC, SRC, BC, RBC, MBC etc. |
60 | Dis., Fab., Ere., of runners supporting box of IRC, & SRC, BC & MBC etc. |
61 | Dis., & Fitting of Square bar of Cane Unloader |
62 | Dis., & Modification and re-alignment of runners beam as per instruction from chopper to drive end of C.C. |
63 | Welding of Mill roller, Coupling & Crown pinion damaged teeth to be built as per teeth gauge as per instruction of Enginner I/C. |
64 | Dis., Fab., & Ere. Of worn out Tail end Bend (Boot) of SRC & IRC |
65 | Dis., Repairing/Replacement of worn out scroll (Tawa) of Mill Screw Conveyor. |
66 | Repairing worn out portion of Screw Conveyor of Bottom Juice Trough with complete pipeline. |
67 | Fab./Ere., Mill Screw Conveyor with its shaft and Tawa as per drawing. |
68 | Fab., & Patching of worn out damaged portion of Boiler Feed Tank |
69 | Repairing of worn out portion & re-fitting bagasse feeder sliding arrangement of Boiler No. 4, 5 & 6 |
70 | Dis., Fab., & Ere., Repairing/Replacement worn out portion of Bagasse Spreader of Boiler. |
71 | Dis., Repairing , Replacement & Re-fitting of Ash discharge chute of Boilers. |
72 | Cleaning inside, outside of 3 Nos.Boiler Chimney & Painting Inside & out side as per instruction of engineer I/C. |
73 | Fab., & Ere. Of Rings for the strengthening of Boiler Chimney. |
74 | Repairing, Fab.,& Fitting of worn out ladder of Boiler Chimney. |
75 | Dis., of Boiler No. 4 Economizer all bends & cleaning all bends & tubes at site & re-fitting with hydraulic testing. |
76 | Dis., Fab., & Ere. Of worn out side plate approx. 6 mm thick x 230 mm Height of C.C., IRC, SRC, BC, MBC, RBC, by new/old plate etc. |
77 | Welding at sprocket of CC, MBC, BE, RBC, SRC & IRC as per teeth gauge. |
78 | Dis., Fab., & Replacement of worn out damaged portion of boiler chimney shell. |
79 | Fab., & Ere., of Suction Cone of ID Fan of Boiler |
80 | Fab., & Fitting of Baga-Cillo Fan Impeller as per sample. |
81 | Fab., & Fitting of Baga Cillo Casing as per instruction. |
82 | Fab., Ere., of Rotary Drum for Bagasse Feeder Stacker. |
83 | Dis., Fab., & Ere. Of New Condenser Catcher Juice & Syrup. |
84 | Dis., Repairing, & fitting of Condenser Catchers/Juice & Syrup Catcher |
85 | Dis., Fab., & Ere., of Sulphur Burner Melter with Internal Coil Including all necessary connection with hydraulic testing etc. |
86 | Dis., Repairing & fitting of M.S. Coil in Melters/Melter Shell & Vice Versa with all necessary connection. |
87 | Dis., Repairing &Fitting of worn out Cooling Jacket of Sulphur Burner. |
88 | Dis., Fab., & Fitting of Sulphur Burner Scrubber(Cooler) pipe with flanges & Nipples. |
89 | Dis., Fab., & Ere. Of New So2 Gas Boxes with flange & Nipple at Juice Sulphitor. |
90 | Dis., Fab., & Fitting of Sulphur Burner Scrubber Shell up to One meter height with all necessary connection. |
91 | Dis., Repairing & Re-fitting of worn out sublimation pipe jacket or So2 Gas |
92 | Dis., Fab., & Ere.., of New Entrainment Catcher/Save all of Pan/Quad/S.K. etc. |
93 | Dis., Repairing & Fitting of Entrainment Catcher/ Save all/ of Pan Quad/S.K. etc. |
94 | Dis., & Repairing of Foot Valve strainers for quad/ spray pond/Injection pump etc |
95 | Dis., Repairing of worn out Stirrer Arm of Crystallizer |
96 | Fab., of Seed & Sugar Elevator Bucket as per sample. |
97 | Dis., Fab., Ere. Of Hopper Trough with Trial. |
98 | Dis., Fab., & Ere. Ofdown take of vacuum pan. |
99 | Dis., Fab. & Ere., ofdown take of S.K., Vapour Cell, Evaporator. |
100 | Dis., Repairing & Fitting of discharge valve seat of V/Pan 60/40 Ton |
101 | Dis., Fab., & Fitting of Discharge chute of C/F Machine |
102 | Dis., Fab., & Ere. Of Umbrella for Quad. |
103 | Dis., Fab., & Ere. Of Umbrella forPan |
104 | Dis., Repairing & Fitting of Condensate bottle of Quad & Juice heater |
105 | Dis., Fab., & Fitting of New Condensate bottle of ( quad/Pan & juice heater) |
106 | Dis., Fab., & Ere. Of Feed header at Vacuum Pan with all necessary connection. |
107 | Dis., Fab., & Ere., of Super heated wash water system coil in column with all necessary connection. |
108 | Replacement of worn out Partition plate of Juice heater header |
109 | Fab., Ere., & Replacement of worn out grooves of Juice heater for fitting rubber strips in Juice heater |
110 | Dis., Fab., & Ere. Of Syrup sulphitor Tower Cone with all necessary connection. |
111 | Dis., Repairing & Fitting of worn out portion of Old Cooling Coil of Twin/Mono Vertical Crystallizer & hydraulic testing with all necessary connection |
112 | Fab., & Ere., of Cooling Coil of Mono/Twin Vertical Crystalizer from new pipes with all body connection & hydraulic testing. |
113 | Dis., Fab. & Ere., of Magma mixture /Pug Mill damaged Arm replacement work. |
114 | Dis., Fab., & Ere., of Massecute Juice/Lime/ Syrup/ Mud Gutter with all necessary connection |
115 | Dis., fab., & Ere., of Dorr compartment tray |
116 | Dis., Repairing & Fitting of Mud Boot of Clarifier. |
117 | Dis., Fab., & Ere., of Clarifier Arm with Scraper |
118 | Fab., & Ere., of Cover of NK-1100/1350/1503 as per sample. |
119 | Shifting & re-arrangement of magma mixer with all necessary connection & driving arrangement with trial. |
120 | Dis., Cleaning , Re-fitting of PVC Cluster & its branch pipe with nozzle of spray pond |
121 | Dis., Fab., & Fitting of Quad/ Pan/ Juice heater condensate boxes. |
122 | Dis., Fab., & Fitting of worn out ducting of Boiler No.. 4, 5 & 6 |
123 | Fab., Ere. Of New Screw Conveyor of Mud mixer as per sample. |
124 | Repairing of worn out portion of Mud conveyor Trough with complete pipeline. |
125 | Dis., Fab., & Fitting of Vacuum Filter Trough with all connection |
126 | Repairing of Vac., Filter Trough |
127 | Fab., & Fitting of Vac., Filter Agitator |
128 | Dis., Fab., & Fitting of Molasses Separator for KB-1250, KCP-1350, NK-1100 C/F Machine |
129 | Dis., Fab., Ere. Of Molasses distributor of Pan (Kachchuwa) |
130 | Dis., Fab., & Fitting of worn out Calendria Shellof Pan with all necessary connection and with hydraulic testing. |
131 | Dis., Fab., & Ere., of Top Tapper Cone |
132 | Vacuum Pan |
133 | Quad |
134 | Dis., Fab., & Ere., of vacuum Crystallizer shell from M.S. Plate with all connection & satisfactory trial. |
135 | Dis., & Fab.& Fitting of worn out sight glass of Pan/Quad with flange as per sample. |
136 | Dis., Fab., & Ere., of New Condensor of Vacuum Filter as per sample. |
137 | Dis., Fab., & Ere., of worn out portion of Pan/Quad Body Shell |
138 | Dis., of Old M.S. Blowdown Pit with pipeline & Valve & shifting to scrap yard. |
139 | Dis., & Repairing of ID FD, SA Fan Damper |
140 | Dismantling of Required old flange/Blind from old pipeline upto 30 CmØ line. |
141 | Dis., Fab., Modification & Erection of Hopper drive arrangement. |
142 | Fab.,of IRC & SRC Rakes |
143 | Fab., of Old RBC & MBC Rake |
144 | Dis., Fab., & Fitting of Dorr Compartment Shell |
145 | Dis.Fab., & Fitting of Bottom Compartment of Clarifier |
146 | Dis., Feb., & Ere. Of worn out portion of Syrup Sulphitor/Juice Sulphitor/Pan/Quad Body shell up to one meter height |
147 | Feb., & Ere. Of M.S. Angle valve 800 mm size as per drawing. |
148 | Feb., & Ere. Of Plate form & Boiler No. 4 Chimney for sampling port. |
149 | Replacement of worn out portion of Boiler ID/FD Fan Casing |
150 | Dis., Feb., & Ere. Of Juice withdrawal Tray of Dorr of Size 6’ length x 3’ width x 2’ height. |
151 | Dis., Feb. & fitting of Bottom plate of So2 Scrubber |
152 | Dis., Feb., & Fitting of Baffle plates in Juice/syrup Sulphitor |
153 | Dis., Feb., & Fitting of New So2 Cooler with all pipes & accessories |
154 | Feb., & fitting of KB-1250 Molasses Chamber Ring. |
155 | Dis., Feb., & fitting of Syrup sulphitor Tank with all connection & Chimney pipe etc. complete. |
156 | Dis., Feb., & Fitting of complete Telescopic Valve Juice Box with all connection. |
157 | Dis., Feb., & fitting of Chain Support Guide in Secondary Rack Carrier Under Fibrizer, Bagasse elevator, RBC, & MBC. |
158 | Dis., Feb., & fitting of Half bottom of crystallizer with all connection. |
159 | Dis., Feb., & fitting of full bottom of crystallizer with all connection. |
160 | Dis., Feb., & Ere. Of S.K./V. Cell/Pan/Quad Bottom saucer |
161 | Dis. & Fitting of Juice heater Cover. |
162 | Feb., of 6’x6” M.S. Tee Ring from new 12 mm thick M.S. Plate and erection around vacuum Pan. |
163 | Dis., Fab & Ere. Of Quad Shell with save-all & all necessary connection |
164 | Dis., Fab., & Ere. Of New Sulphur furnace with all accessories’ & connection |
165 | Dis., Fab., & Ere. Of Juice Sulphitor shell with all accessories & connection & chimney etc. |
166 | Dis., Fab., & Ere. Of M.S. Ring, Round, Quad Body (Bottom side) |
167 | Dis., Fab., & Ere. Of Bottom Dome of Quad |
168 | Dis., Fab., & Fitting of Hopper drive with all connection |
169 | Repairingdampers of ID/FD/SA Fan ducting to make it leak proof. |
170 | Dis., Fab., & Fitting of Bagasse Cello line (Approx. length of one pcs. |
171 | Modification of ID Fan Hood of Boiler No.5 |
172 | Fab., & Ere., of Ash Discharge chute of Boilers. (Appx. L- 1 x W-1 Mtr.) |
173 | Fab., of M.S. Bend up to 30 Cm Dia |
174 | Dis.. Fab., & Ere., of Ducting plate at Fly Ash Arrestor/Boiler |
175 | Dis., Fab., & Ere. Of Fly Ash System D.S.M. Screen with Side M.S.plate |
176 | Erection & Commissioning of Vibro Screen at Filtrate Tank with all connection. |
177 | Dis., Fab.., & Fitting of Steam Jacket at Pan |
178 | Dis., Fab., & Fitting of S.S. Juice Tray of Mill |
179 | Dis., Fab., & Fitting of Cone |
180 | Above One Meter Dia |
181 | Up to One Meter Dia. |
182 | Dis., Fab., & Fitting of Oil Guardof Pinion & Gear at Mills & MBC/RBC |
183 | Dis., Fab., & Fitting of Vertical Shell of Clarifier |
184 | Dis., Fab., & Fitting of Bottom Cone of Dorr |
185 | Dis., & Fitting of Screen of D.S.M. at Mills. |
186 | Replacement of all broken & damaged Bagasse Spreader teeth (Kanghi) from M.S. Angle of 30 Ton Boiler Bagasse feeder drum. |
187 | Modification of Bagasse Feeding chute of 30 Ton boiler from MBC Trough as per direction given |
188 | Repairing & Strengthening of Weigh Bridge Structure |
189 | Dis., Fab., & Ere. Of Front Beam of Boiler alignment of furnace gate, upper & lower window and Bagasse feeder spreader & wall |
190 | Dis., Fab., & Fitting of Feeder & Spreader Bed. |
191 | Dis., Fab., & Ere., of Front wall to make it leak proof by providing plate between spreader & wall |
192 | Dis., & Ere., of Channel of C.I. Plate near Steam Drum to make it leak proof of Boiler |
193 | Dis., & fitting of Demister plate in Wet Scrubber of Boiler and its trial. |
194 | Dis., Fab., & Fitting of man holes for various equipment. |
195 | Dis., of Top Ring and D.S.M. Screen,Providing a New extra ring to increase capacity of clarifier Fly Ash Arrestor. |
196 | Fab.of M.S flange upto 30 cm |
197 | Repairing of Old Clear Juice heater & Fitting at Position by making staging etc. and gives successefull trial with all necessary connection |
198 | Fab., & Fitting of Transient heater for New C/F machine with necessory connection.to mono vertical crystalizer |
199 | Dis., Fab., & Fitting of Hanging water tank with successful trial. |
200 | Fab., & Fitting of New Magma Mixer with motor, pump, R.G. Box alignment work etc and gives successful trial. |
201 | Dis., & Fab., of Injection Suction mouth piece |
202 | Fitting of New Lime Circulator with pipeline and successful trial |
203 | Fab., & Fitting of Monitor Gate of Molasses at Centrifugal machine. |
204 | Fab., & Fitting of New water super heater at Centrifugal Machine. |
205 | Modification in Old mud conveyor belt staging, fitting of rollers, conveyor belt durm, motor & R.G. along with mud chute suitable for 1000 mm wide belt.and to give successful trial. |
206 | Repairing of lime Slaker guide wheel and guide ring and to give successful trial. |
207 | Repairing Cone of Lime Slaker |
208 | Dis., Fab., & Ere., of Juice Sulphitor providing necessary connection of Juice, lime & So2 Gas and leakproof trial. |
209 | Dis., Fab., & Ere. Of Flash Tank with successful trial |
210 | Repairing of Lime Vibro Screen. |
211 | Dis., Fab., & Fitting of Complete Shell of Pan with Tapper portion andsave all. |
212 | Dis., Fab., & Fitting of Complete shell of Quad with tapper portion. |
213 | Replacement of worn out portion of Wet Scrubber Shell of Boiler No. 5 & 6 |
214 | New Chute for Boiler No. 4 Main Bagasse Carrier for removal of Bagasse out side |
215 | Repairing of ID Fan Imppeller of Boilers |
216 | Repairing of FD Fan Imppeller of Boilers |
217 | Dis., Fab., & Ere., of Donnlley chute of Mill No. 1,2, 3 & 4 |
218 | Repairing of Donnalley chute of Mill No. 1, 2, 3 & 4 |
219 | Repair of damaged Mud Discharge Chute |
220 | Dis., Fab., & Ere., of Mud Discharge chute |
221 | Dis., & Re-fitting of Air heater all3/2 tube plate with ducting as per instruction of site engineer/chief engineer |
222 | for 30 Ton Boilers |
223 | for 20 Ton Boiler |
224 | Removal of Boiler Air Heater Tubes |
225 | for 30 Ton Boilers |
226 | for 20 Ton Boiler |
227 | Fitting of Boiler Air heater Tube Plate with leakproof testing |
228 | for 30 Ton Boilers |
229 | for 20 Ton Boiler |
230 | Dis., Fab., & Ere., of E.T.P. Clarifier |
231 | Repairing of worn out portion of E.T.P. Clarifier |