}

Running Contract For Extension / Improvement Works In Illuppur Sub-Division In Pudukkottai Edc - 2 Pit Excavation For 7.5 Mts / 8 Mts Pole In Ordinary Soil Including Cleaning Of Site ( Each Pit ) 3 1.25 X 0.6 X 1.5M [ Ordinary Soil ] 4 Semi , Pudukkottai-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Running Contract For Extension / Improvement Works In Illuppur Sub-Division In Pudukkottai Edc - 2 Pit Excavation For 7.5 Mts / 8 Mts Pole In Ordinary Soil Including Cleaning Of Site ( Each Pit ) 3 1.25 X 0.6 X 1.5M [ Ordinary Soil ] 4 Semi . Submission Date for this Tender is 30-07-2022. Coats and Jackets Tenders in Pudukkottai Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

33102379
Running Contract For Extension / Improvement Works In Illuppur Sub-Division In Pudukkottai Edc - 2 Pit Excavation For 7.5 Mts / 8 Mts Pole In Ordinary Soil Including Cleaning Of Site ( Each Pit ) 3 1.25 X 0.6 X 1.5M [ Ordinary Soil ] 4 Semi
Open Tender
Indian
Tamil Nadu
Pudukkottai
30-07-2022

Tender Details

Running Contract For Extension / Improvement Works In Illuppur Sub-Division In Pudukkottai Edc - 2 Pit Excavation For 7.5 Mts / 8 Mts Pole In Ordinary Soil Including Cleaning Of Site ( Each Pit ) 3 1.25 X 0.6 X 1.5M [ Ordinary Soil ] 4 Semi Rocky Soil 5 Pole Pit For 9.0M And 9.14 M Psc / Rcc / All Metal Poles ( Each Pit ) 1.25 X 0.6 X 1.83 Mtr 6 Ordinary Soil 7 Semi Rocky Soil 8 Heavy Rocky Soil Where Blasting / Cheseling Required [ Specific Approval Should Be Obtained From Concerned Ee ] 9 Stay Pit 10 In Ordinary Soil [ 0.95 X 0.6 X 1.2M ] 11 Semi Rocky Soil 12 Stay Pit In Heavy Rocky Soil Where Blasting / Cheseling Reqiured [ Specific Approval Should Be Obtained From Concerned Ee ] 13 Erection Of Poles & Stays ( Including Refilling Of Excavated Earth ) 14 Erection Of 7.5M / 8.0M Poles [ Rcc / Psc ] 15 Erection Of 9.00M / 9.14M Rcc / Psc / Rail Pole, Tubular Pole And All Metal Poles 16 Stay Set 17 Erection Stay Set Complete 18 Stay Erection Without Rod And Pit 19 Replacement Of Stay Rod Only. ( Including Stay Pit Excavation & Refilling & Erection ) 20 Replacement Of Guy Shackle Only In Existing Stay 21 Erection Of Line Materials 22 Fixing Of Lt 1 Ph X Arm 23 Fixing Of Lt / Ht Ti Fitting 24 Fixing Of Lt 3 Ph X Arm 25 Fixing Of 3 [ 1 / 2 ] V` X Arm 26 Fixing Of4 [ 1 / 2 ] V` X Arm 27 Fixing Of 5 V X Arm 28 Fixing Of Tapping Channel / Guarding X Arm 29 Providing Of Line Spacers In Lt Lines 1 Phase 30 Providing Of Line Spacers In Lt Lines 3 Phase 31 Erection Of Ab Switch With Pt Insulator & Jumpering Complete 32 Erection Of Centre Rotating Switch Ab Switch Complete 33 Fixing Of Ht Pin Insulator / Strain Disc 34 11 Kv Pin Insulator With Pin 35 11 Kvstrain Disc / Polymer Disc With Hardware 36 22 Kv Pin Insulator With Pin 37 22 Kv Strain Disc / Polymer Disc With Hardware 38 33 Kv Pin Insulator With Pin 39 33 Kv Pinstrain Disc / Polymer Discwith Hardware 40 Fixing Of Lt Pin Insulator With Pin 41 Lt Shakle With Hardware 42 Fixing Of Aluminium Knob 43 Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [ Including Transport Of Condutor From Road Side To Work Spot ] Per Run 44 Upto 7 / 2.59 Mm Acsr, 7 / 2.50 Aaac Including Pvc Cable Upto 25 Sqmm 45 Acsr 7 / 3.35Mm & 7 / 3.15 Aaac Including Pvc Cable Above 25 Sqmm 46 Acsr 7 / 4.09 Mm 47 Above 7 / 4.09 Mm Acsr & Dog Conductor 48 For Lc Works ( All Types Of Conductor ) 49 Route Surveying Andpeg Marking Of Ht / Ltlines 50 Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit ] 51 Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Throughtubes 52 Dp Earthing Including All Works [ Double Side Earthing ] 53 Erection Of 4Th Earth Pipe Including Earthing 54 Earthing Of Poles 55 Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. 56 Replacement Of Detoriated Earth Pipe Per Location 57 Concreting With Mixture 1:3:6 [ Including All Materials ] . 58 ( A ) Transformer Structure Poles Mass Concreting With Coping 0.75Mx0.5Mx1.8M Coping Material Supplied By The Contractor ( Cement =100 Kg River Sand, 40 Mm Jully Including Labour 2 Nos Of Pole In Structure ) 59 ( B ) Mass Concerting For Pole In Line0.75Mx0.5Mx1.8M 60 ( C ) Sleeve Concret For Poles In Line 0.75M X 0.5X 0.9M 61 ( D ) Sleeve Concret For Stay Set 0.3X0.3X0.75 62 Erection Of Distribution Transformer Structure Complete 63 Excavation Of Structure Pole Pits 0.9 X0.9 X 1.83 Mtr 64 Transporting Of Pole To Pit Location 2 Nos. 65 Erection Of Poles 2 Nos 66 Excavation Of Stay Pit 4 Nos 67 Erection Of Stay Set ( 4 Sets ) 68 Mass Concreting ( Cement:Sand:Jelly Supplied By The Contractor ) 2 Nos. 69 Erection Ofab Switch 70 Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes 71 Erection Of Top Channel 72 Bed Channel [ 2 Nos Channel ] Erection 73 Cross With Stud For Bed Channel Erection 74 Erection Of Belting Angle / Hg Fuse Angle 75 Erection Ofhg Fuse Set 76 Erection Of Ht Las With Jumpering And Earthing 77 Erection Of Lt Las With Jumbering And Earthing 78 Erection Of Jumpering [ Ht Side ] 79 Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. 80 Erection Lt Open Type Fuse Unit Arrangement Single 81 Erection Lt Open Type Fuse Unit Arrangementdouble 82 Painting Of Stru. Complete Excluding Dt [ Two Coat Of Red Oxide ] All Metal Parts ( Excluding Cost Of Paint ) . 83 Painting Of Stru. Complete Excluding Dt [ One Coat Alu Paint, Excluding Cost Of Paint ) 84 Colour Washing Of 2 Numbers Structure Pole [ Excluding Cost Of Distember / Snowsem ] 85 Painting Name Of Ss At Seating Channel Including Paint. 86 Painting Of Dt Alone [ Excluding Painting ] With Red Oxide And Double Coating Of Aluminium Paint. 87 Erection Of Single Pole Mounted Dt Erection Work ( Including Pole Concreting & 3Nos Earth Pipe & Paintimng ) 88 Erection Of Dt Metering Arrangement ( Materials Supplied By The Board ) 89 Erection Of Distribution Transformer / Dismantling Of Dt 90 Upto 100 Kva 91 Above 100 Kva And Upto 250 Kva 92 500 Kva 93 Colour Washing Of Rcc / Psc Poles 94 Numbering Of Poles Including Cost Of Paint / Loc [ Black Background And Yellow Letters ] 95 Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. 96 Service Connection 97 Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling 98 Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 Ws.V. Lamp / Mercury Lamp / Led Yard Light Fittingincluding Wiring, Clamping Of Pipe, Serial Board Assembling Etc. 99 Fixing Of Street Light Fitting With 2 Cfl / 4 Cfl 100 Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. 101 Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot 102 Erection / Dismantling Of Metering Set 11 Kv / 22 Kv / 33 Kv 103 Fabrication Works. 104 Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. 105 Providing Of Holes. 106 All Size Angles / Channel Upto 5 / 8 107 All Size Angles / Channel Above 5 / 8 108 Slot Holes In Flat / Angles / Channel Upto 3 / 4 109 Slot Holes In Flat / Angles / Channel Above 3 / 4 110 Fabrication Of Centre Support Only For Dt Structure 111 Cutting Of Rs Joist / Angles / Ms Channels 112 Welding Of Rs Joist / Angles / Ms Channels 113 General 114 Set Right The Leaning Pole In Both Ht & Lt [ Pin Point ] Location 115 Set Right The Leaning Pole In Both Ht & Lt [ Cut Point ] Location 116 Resagging Of Lines For All Sizes Cut Point Location 117 Converting Pin Point Into Cut Point Ht Lines 118 Converting Pin Point Into Cut Point Lt Lines 119 Clearing Tree Branches Ofcoconut Tree 120 Clearing Tree Branches Of Neem, Tamarind, Countrytree Etc., 121 Releasing And Re-Erection Of1 Ph Sc Wire [ During Conductor Or Support Change ] 122 Releasing And Re-Erection 3 Ph Sc Wire [ During Conductor Or Support Change ] 123 Destruction Of Pole Concerting At Site. 124 Retrieving Grill From Detoriated Pole [ Grill Separate From Damaged Pole ] 125 Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe 126 Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) 127 Guarding Arrangement :- 128 Cradle Guarding Including Earthing And Earth Pit Excavation [ Railway & P&T Crossing ] 129 Flat Guarding With 4 Wire 130 Split Netural Guarding 131 Loading And Unloading : 132 Loading Of 7.5 Mtr / 8.0 Mtr Rcc / Psc / Metal Pole [ Per Pole ] 133 Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Rcc / Psc Pole / Metal Pole [ Per Pole ] 134 Unloading Of Psc / Rcc / Metal Poles 135 Transporting From Road Side To Workspot 136 Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km 137 Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof [ Certified By Aee ] 138 Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km 139 Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof 140 Transport Of Line Materials 141 Transport Of Line Materials [ Minimum 1 Mt ] From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Upto 8 Kms 142 Transport Of Line Materials [ Minimum 1 Mt ] From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km 143 Loading / Unloading Of Line Materials 144 Transport Of Equipements 145 Transporting Of Distribution Transformer / Metering Set By Using Private Vehicleload Of One No.Minimumup To 30 Km 146 .Transporting Of Distribution Transformer / Metering Set By Using Private Vehicleload Of One No.Minimum Above 30 Km For Every Addl .1 Km 147 Dismantling Works 148 Dismantling Of 7.5M / 8.0M Poles [ Rcc / Psc ] 149 Dismantling Of 9.00M / 9.14M Rcc / Psc / Rail Pole, Tubular Pole And All Metal Poles 150 Dismantling Stay Set Complete 151 Dismantling Of Lt 1 Ph X Arm / Lt / Ht Ti Fitting 152 Dismantling Of Lt / Ht Ti Fitting 153 Dismantling Of Lt 3 Ph X Arm 154 Dismantlingof 3 [ 1 / 2 ] V` X Arm 155 Dismantlingof Tapping Channel And Guarding X Arm 156 Dismantling Of 11 Kv Strain Disc / Polymer Disc With Hardware 157 Dismantling Of 22 Kv Pin Insulator With Pin 158 Dismantling Of 22 Kvstrain Disc With Hardware 159 Dismantling Of 33 Kv Pin Insulator With Pin 160 Dismantling Of 33 Kvstrain Disc With Hardware 161 Dismantlingof Lt Pin Insulator With Pin 162 Dismantlingof Lt Shackle With Hardware 163 Dismantling Of Aluminium Knob 164 Dismantling Of Conductor7 / 2.59 Mm Acsr, 7 / 2.50 Aaac Including Pvc Cable Upto 25 Sqmm 165 Dismantling Of Conductoracsr 7 / 3.35Mm & 7 / 3.15 Aaac Including Pvc Cable Above 25 Sqmm 166 Dismantling Of Conductoracsr 7 / 4.09 Mm 167 Single Phase Meter &3 Phase Meter 168 Replacement ( Releasing & Fixing ) Of Single Phase Meter ( Including Transport Charges ) 169 Replacement ( Releasing & Fixing ) Of Three Phase Meter ( Including Transport Charges ) 170 Checking Healthiness Of Agl.Meter 171 Checking Healthiness Of Agl.Meter1

Key Value

Document Fees
Refer document
EMD
INR 25000.0 /-
Tender Value
INR 25 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail