Numaligarh Refinery Limited has published Power Transformer Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Power Transformer , Power Transformers ( 25 / 31. Submission Date for this Tender is 29-09-2022. Power Transformer Tenders in Golaghat Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 28-Jul-2022 | Corrigendum 1 | Date | 11-07-2022 |
2 | 11-Aug-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 18-08-2022 |
3 | 19-Aug-2022 | Corrigendum 3 | Date | 30-08-2022 |
4 | 31-Aug-2022 | Corrigendum 4 | Date | 12-09-2022 |
5 | 13-Sep-2022 | Corrigendum 5 | Date | 22-09-2022 |
6 | 23-Sep-2022 | Corrigendum 6 | Date | 29-09-2022 |
Sl. No. | Item Description |
1 | Power Transformers (25 / 31.5 MVA, 33/6.9kV, 50Hz) along withCondition Monitoring (CM) and Asset Performance Management (APM) system moisture removal kit as per details mentioned in MR |
2 | Power Transformers (20 / 25 MVA, 33/6.9kV, 50Hz) along with Condition Monitoring (CM) and Asset Performance Management (APM) system moisture removal kitas per details mentioned in MR |
3 | THIRD PARTY INSPECTION CHARGES for Sr No 1.1 & 1.2 |
4 | Mandatory Spares for Sr No 1.1 & 1.2 |
5 | TRANSPORTATION: For Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works / shop to Project site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation up to NMGS/Numaligarh Refinery Project Siding. |
6 | Site Workas per Sr no 5 of MR (for BOQ Sr No 1.1 & 1.2) |
7 | Training charges, as per scope defined in MR. |
8 | Post Warranty Annual Maintenance(For First year after expiry of warantee period) : PWAMC visits through OEM for 3 year after the completion of the warranty /defect liability period as per details mentioned in MR. |
9 | Post Warranty Annual Maintenance(For Second year after expiry of warantee period) : PWAMC visits through OEM for 3 year after the completion of the warranty /defect liability period as per details mentioned in MR. |
10 | Post Warranty Annual Maintenance(For Third year after expiry of warantee period) : PWAMC visits through OEM for 3 year after the completion of the warranty /defect liability period as per details mentioned in MR. |
11 | Unit rate forSupervision Sevices of erection and commissioning / Performance testingas per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days. ( BIDDERS TO QUOTEUNIT RATE FOR DIEM CHARGES ) |
12 | Unit rate forSupervision Sevices of erection and commissioning / Performance testingas per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days). ( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |
13 | Unit rate forSupervision Sevices of erection and commissioning / Performance testingas per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site). ( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |