| 1 | 1.Providing Pathway and water supply (Samathuva Sudugadu) @ Akkaraiputhu Theru in Keelakavathugudi Panchayat |
| 2 | Providing pile foundation with R.C.C 1:1.5:3 mix using 20mm ISS metal to 23mm dia., including cost and conveyance of all materials etc., complete as per std., specification |
| 3 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
| 4 | Supply and filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete. |
| 5 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x21/4\" and conveyance of all materials to site and all labour charges etc complete |
| 7 | Below Ground Level - Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon |
| 8 | Super structure- Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon |
| 9 | Supplying, fabricating and placing in position mild steel or robbed for steel and alla reinforced cement concrete works as per the design givrn including cost of steel and binding wire in all floors etc complete complying with standard ( Ms rods or RTS rods) which will be recovered at issue rate. The Binding wire shall be supplied by the contractor |
| 10 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete |
| 11 | Ceiling Plastering with CM 1:3,10mm thick inculding cost and conveyance of all materials to site and all loboure charges etc.,complete |
| 12 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 13 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 14 | Finishing the top of roof with one couse of pressed tiles of size 23cm x 23cm x 2cm of approved quality laid in cement mortar 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S at 2% by weight of cement |
| 15 | Painting two coats with approved emulsion over one caot of primering coat of cement paint over cement plastered wall surface, ceiling and other new surfaces including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers |
| 16 | A) Platform and Sintex Tank |
| 17 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
| 18 | Supply and filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete. |
| 19 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 20 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x21/4\" and conveyance of all materials to site and all labour charges etc complete |
| 21 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 22 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 23 | Painting two coats with approves colour washing charges etc., complete complying with standard specifications and as directed by the departmental officers |
| 24 | Provision for 1000Lit Sintex tank |
| 25 | Provision for Tap Connection 2m |
| 26 | B. Extension of New Pipe Line |
| 27 | Earthwork excavation of and depositing on bank with initial lead of 10m - 65mm & 75 mm PVC Rigid Pipes |
| 28 | Supply & Delivery of PVC rigid pipes for portble water supply as per IS 4935/1988 and amended from time to time with ISI marking of the following sizes with necessary couples or bended pipes as specified in ISI and the required quantity of solvent cement having the required woring pressure and for the delivery at site of works including loading, unloading stacking and transit insurance charges etc., complete |
| 29 | Refilling with excaveted earth ( other than sand compling with standard specifications for fillig in trenches |
| 30 | Convenyance |
| 31 | Solvent Cement |
| 32 | 63mm PVC TEE |
| 33 | 63mm PVC Elbow |
| 34 | 63mm PVC End cap |
| 35 | C.Construction of Cement Road |
| 36 | Earth work excavation in hard stiff clay soil with initail lead and lift as per SS20B for Foundation |
| 37 | Filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete. |
| 38 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 39 | Supplying and erecting centering and shuttering with steel materialsa & labour charges etc complete |
| 40 | Cement concrete 1:3:6mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 41 | Cement concrete 1:2:4 mix using 20mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 42 | Collection and supply of gritty grave from appd quarry including cost and conveyance of all materials to site including all charges for filling etc., complete |
| 43 | provision for tarped |
| 44 | provision for tar Pad |
| 45 | provision for name board Charges |
| 46 | 2.Tree plantation (Miyawaki Method)in GWC senthamnagalam nagar in keelakavathukudi Panchayat |
| 47 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 48 | Providing0 .300 mm diapile hole using hand bore drilling including cost and conveyance of all labour charges etc.,complete |
| 49 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 50 | Cost and Supply of Cut stone Pillars including cost and conveyance to site and all labour charges etc.,complete(.15x15.2.10m) |
| 51 | Cost and Supply of barbed wire including cost and conveyance to site and all labour charges etc.,complete |
| 52 | Cost and Supply of Diamond shape MS Wire fixing including cost and conveyance to site and all labour charges etc.,complete |
| 53 | Supply of coconut Fibre for Mixing with excavated earth in cluding all cost anveyence of mateials and Labour charges etc(300x2kg)in Local rate |
| 54 | Supply of LEDsolutions Mix( EM karasial)with excavated earth in cluding all cost anveyence of mateials and Labour charges etc(300x2kg) |
| 55 | Supply of All varities of Tree saplingsincludingall cost canveyence of Materialscharges etc(300nos) |
| 56 | Labour charges for Mixing sand and Cocount fibre |
| 57 | Labour charges for Planting of saplings |
| 58 | Provision for Water supply arrangements for pipe line |
| 59 | Provision for Entrance Gate |
| 60 | Provision for name board Charges |
| 61 | 3.Construction of Fish market shed and cement concrete platform at senthamnagalam nagar in keelakavathukudi Panchayat |
| 62 | Drilling of 230mm dia with Reinforced Cement concrete 1 : 11/2 : 3 mix using 20mm HBG metal for foundation including watering , compacting etc., complete complying with standard specifications and as directed. For pile foundation |
| 63 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 64 | Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification. |
| 65 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 66 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x21/4\" and conveyance of all materials to site and all labour charges etc completeI.Foundation and Basement |
| 67 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon |
| 68 | Grade Beam |
| 69 | Column |
| 70 | Supplying and Fabrication of steel including cost and conveyance of steel to site And all labour charges for straightening,cutting to length ,bending to shape and tiying in position and forming grills for all RCC works |
| 71 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete -upto basement |
| 72 | lastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 73 | Granolitheic Flooring 1 : 2 : 4 mix using 10-12mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 2.5cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 74 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 75 | Provision for GI Sheet Roofing |
| 76 | Light&Fan Point(Open) SD 21 |
| 77 | Plug Point |
| 78 | Provision for Name Borad Charges |
| 79 | 4.Tree plantation (Miyawaki Method)in GWC suppamma nagar in keelakavathukudi Panchayat |
| 80 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 81 | Providing0 .300 mm diapile hole using hand bore drilling including cost and conveyance of all labour charges etc.,complete |
| 82 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 83 | Cost and Supply of Cut stone Pillars including cost and conveyance to site and all labour charges etc.,complete(.15x15.2.10m) |
| 84 | Cost and Supply of barbed wire including cost and conveyance to site and all labour charges etc.,complete |
| 85 | Cost and Supply of Diamond shape MS Wire fixing including cost and conveyance to site and all labour charges etc.,complete |
| 86 | Supply of coconut Fibre for Mixing with excavated earth in cluding all cost anveyence of mateials and Labour charges etc(300x2kg)in Local rate |
| 87 | Supply of LEDsolutions Mix( EM karasial)with excavated earth in cluding all cost anveyence of mateials and Labour charges etc(300x2kg) |
| 88 | Supply of All varities of Tree saplingsincludingall cost canveyence of Materialscharges etc(300nos) |
| 89 | Labour charges for Mixing sand and Cocount fibre |
| 90 | Labour charges for Planting of saplings |
| 91 | Provision for Water supply arrangements for pipe line |
| 92 | Provision for Entrance Gate |
| 93 | Provision for name board Charges |
| 94 | 5.Construction of Girls Toilet at PUPS School Senthamnagalam in Keelakavathugudi Panchayat |
| 95 | Pile |
| 96 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 97 | Supply and filling with sand in layers not more than 15cm thick, well rammed, wattered and compacted etc., complete for foundation |
| 98 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 99 | Supplying and filling the carted earth including cost and coveyance and filling charges etc., complete |
| 100 | Brick work in cement mortar 1:5 mix using II class bricks for foundation, basement and super structure including cost and conveyance of all materials to site and all labour charges etc completeI.Foundation and Basement |
| 101 | Brick work in cement mortar 1:5 mix using II class bricks for foundation, basement and super structure including cost and conveyance of all materials to site and all labour charges etc completeI.Above basement |
| 102 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete- below basement |
| 103 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete- Above basement |
| 104 | Supplying and Fabrication of steel including cost and conveyance of steel to site And all labour charges for straightening,cutting to length ,bending to shape and tiying in position and forming grills for all RCC works |
| 105 | Supplying and erecting centering for sides and soffits including necessary supports and structing for plain surfaces such as RCC slab, Lintel, Beam column, sunshade etc complete- Below basement |
| 106 | Supplying and erecting centering for sides and soffits including necessary supports and structing for plain surfaces such as RCC slab, Lintel, Beam column, sunshade etc complete - Above basement |
| 107 | Paving the floor with ceromic tiles of size of 305 x 305 x 6mm including laid in CM 1:3 including cost of white cement and labour charges etc complete |
| 108 | Dadooing the walls with new glazed tiles of size 150 x 150 x 6mm laid in CM 1:2 10mm thick and pointing with cement using .40kg/m2 including finishing the joint and pointing flush with ties surface |
| 109 | Plastering with CM 1:5,12mm thick.including cost and conveyance of all materials to site and all labour charges for curing etc complete |
| 110 | Plastering with CM 1:3,10mm thick.including cost and conveyance of all materials to site and all labour charges for curing etc complete |
| 111 | Plastering with CM 1:4,20mm thick.including cost and conveyance of all materials to site and all labour charges for curing etc complete |
| 112 | Supplying and Fabrication of mild steel door of any sizes with single leaf outer frame made of 35x35x5mm equal M.S angle and shutter frame made of 25x25x5mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18G palte etc ., complete |
| 113 | Door |
| 114 | Toilet door |
| 115 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete for 100sqm |
| 116 | Distemberingtwo coats oil bound distember over priming coatincluding cost and conveyance of all materials to site and all labour charges etc complete for 100sqm |
| 117 | Painting two coats with approved emulsion over one caot of primering coat of cement paint over cement plastered wall surface, ceiling and other new surfaces including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers |
| 118 | Painting two coats over new iron works using ready mixed enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete |
| 119 | Labour charges for fixing steel door including all labour charges etc complete |
| 120 | Supply and fixing of water closet with P trap, PVC pipes, Jolly .60x.45m, Precast slab for manhole cover & lock and key etc complete |
| 121 | Supply and fixing of rain water PVC pipe of 110mm dia |
| 122 | Supply and fixing in position of best quality make white glazed wah basin of size 550x400mm |
| 123 | Provision for Rain water Harvesting structure |
| 124 | Provision for Soak pit arrangements 2000mm dia RCC Rings and cover slab |
| 125 | Provision for Tank, PVC & GI pipes and specials for water supply and sanitary arrangements |
| 126 | Provision for Open roofing arrangements |
| 127 | Provision for name board Charges |
| 128 | 6.Construction of CC Road @ Senthamangalam Puthu Colony Theru in Keelakavathagudi Panchayat |
| 129 | Earth work excavation in hard stiff clay soil with initail lead and lift as per SS20B for Foundation |
| 130 | Filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete. |
| 131 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 132 | Supplying and erecting centering and shuttering with steel materialsa & labour charges etc complete |
| 133 | Cement concrete 1:3:6mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 134 | Cement concrete 1:2:4 mix using 20mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 135 | Collection and supply of gritty grave from appd quarry including cost and conveyance of all materials to site including all charges for filling etc., complete |
| 136 | provision for tarped |
| 137 | provision for name board Charges |
| 138 | 7.Construction of CC Road @ Senthamangalam Ambethgar Nagar in Keelakavathagudi Panchayat |
| 139 | Earth work excavation in hard stiff clay soil with initail lead and lift as per SS20B for Foundation |
| 140 | Filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete. |
| 141 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 142 | Supplying and erecting centering and shuttering with steel materialsa & labour charges etc complete |
| 143 | Cement concrete 1:3:6mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 144 | Cement concrete 1:2:4 mix using 20mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete |
| 145 | Collection and supply of gritty grave from appd quarry including cost and conveyance of all materials to site including all charges for filling etc., complete |
| 146 | provision for tarped |
| 147 | provision for name board Charges |
| 148 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |