| 1 | Supplying, Fabricating, Galvanizing, transporting of towers parts including stub and cleat , extension parts,cost of all materials labour lead lift etc. complete.MS Tower part |
| 2 | Supplying, Fabricating, Galvanizing, transporting of towers parts including stub and cleat , extension parts,cost of all materials labour lead lift etc. complete.HTS part |
| 3 | Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size) |
| 4 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor Single suspension fittings |
| 5 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor Single Tension fittings |
| 6 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor Double Tension fittings |
| 7 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor SB Damper |
| 8 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor Mid span comp.joint for ACSR Panther |
| 9 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor Repair sleeve for ACSR Panther |
| 10 | Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., to location by pulling into river using crane including transport and hire charges etc., complete. |
| 11 | Setting of pilling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 600 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete. |
| 12 | Supplying, fabrication of 6mm M.S. sheet for making into circular casing shape to the required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour charges etc., complete. (600 mm dia Pile) |
| 13 | Boring and concreting of vertical reinforced concrete pile of 600mm dia. upto required depth from tip of the in all clauses of soil using pile augurs for boringusing Bentonite slurry and filling the bore with RCC M20 concrete using 20 mm machine crushed metal and a maximum water cement ratio not exceeding 0.50 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete (But excluding cost of steel reinforcement). |
| 14 | Chipping and dismantling of weak pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete. |
| 15 | Labour charges for transport of Template including assembling of template, stub and cleat and shifting of template from location to location and reassembling the same including cost of all labour, transport lead, lifts etc., complete as directed by the department engineer at site. (The template will be make own arrangement by the contractor). |
| 16 | RCC M30 Grade using 20 mm HBG metal for 230 KV equipment foundtion plinths with form work including cost of all materials curing, labour lead and lift. etc.,cost of form work, etc., complete. |
| 17 | Supply, cutting and bending the steel rods of required size and length as per the instruction of Engineer incharge, including tying and placing to the correct alignment and level as per drawing including cost and conveyance of all materials, lead, lift etc., complete. |
| 18 | Transportingof tower parts including sorting out of tower parts atsite, erection of tower, tightening of bolts and nuts includingcost of all T&P, labour, lead and lift etc., Complete |
| 19 | Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete |
| 20 | Labour charges for Transporting and hoisting of7 units 90 KN Antifog suspension insulators with suspension fittings including cost of fittings, all materials, labours, lead, and lift, etc., complete. |
| 21 | Labour charges for transporting and hoisting of8 units 120 KN Antifog tension insulators with tension fittings including cost of fitting and all materials, labours, lead, and lift, etc., complete. |
| 22 | Labour charges for Paying out, Rough sagging, Tensioningof 6 No of Panther conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading,at site providing trussels andrough sagging tensiioning, clippingcost of T&P lead and lift etc., complete. ( For singlespan) |
| 23 | Transporting paying out, stringing of 1 No OPGW with all fittings including labour charges sagging,tensioning,clipping,jumperting including cost of T&P lead lift, complete in all respects. |
| 24 | Providing temporary guys with steel wires and turn buckles including necessary earthwork excavation for fixing RSJ/ rail bitor concrete blocks for anchorage, dismantling after completion of stringing works including cost of all materials,labour, lead and lift etc., complete in all respects |
| 25 | Arranging and awailing shut down, lowering of LT / HT line during stringing work and restringing the same to original position including alllabour charges,lead and lift etc., complete in all respects. |
| 26 | Providing Pipe type earthing with 25 mm dia GI \"B\" Class pipe (medium class)as per specification and as direct by the site engineer including connecting the earthpipe with tower stub leg using 7/3.55mm GI earth wire with suitable lugs at both end of earth wire includingcost of all meterials, drilling charges, labour lead lift etc., complete. |
| 27 | PCC 1:2:4 using 12 to20mm HBG metal for muffing and coping with necessary form workincluding cost of all materials, labour, all lead lift etc., complete. |
| 28 | Plastering with CM 1:3, 12mm thick for smooth finishing including cost of all materials, labour, all lead lift etc., complete. |
| 29 | Cleaning the tower legs and painting with anti corrosive black paint, 2 coatsto the tower legs1.00m above coping concreteincluding bracings including cost of paint labour, charges, lead and lift etc. complete |
| 30 | Detailed Soil investigation, and submission of foundation design with sepcific remarks |
| 31 | Providing temporary bund/Stacking platform around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site |
| 32 | GST for bidders within TamilNadu |
| 33 | SGST |
| 34 | CGST |
| 35 | GST for bidders outside TamilNadu (IGST) |