| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 2 | Removal of fallen trees beyond 30m upto 120cm in girth from canal including disposal. |
| 3 | Removal of dead animals and disposal at safe plase far off from locality as per the diections of Engineer In-Charge. |
| 4 | Supply of labour for all sort of works as per requirement. |
| 5 | Deployment of JCB Machine including POL Charges and Operator. |
| 6 | Filling E.C.Bags with Sand/Earth including loading, unloading, carriage, placing in position in dryincluding cost of emprty cement bags, supply and carriage of material for filling (Complete Job). |
| 7 | Filling E.C.Bags with Sand/Earth including loading, unloading, carriage, placing in position in wet including cost of emprty cement bags, supply and carriage of material for filling (Complete Job). |
| 8 | Silt clearance from canals. Inclusive of all leads and lifts including disposal - Dry (Complete Job). |
| 9 | Silt clearance from canals. Inclusive of all leads and lifts including disposal - Wet (Complete Job) |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)- Crushed,including cariage of material from source to site of work (Complete Job). |
| 11 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, including all leads and lifts and disposed earth to be levelled and neatly dressed, as directed by Engineer-in-Charge. All kinds of soil (Completed Job). |
| 12 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) including carriage of material from source to site of work (Complete Job). |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 14 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 15 | Suspended floors, roofs, landings, balconies and access platforms, Shelves. |
| 16 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, including all leads and lifts. |
| 17 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 18 | Supply & Carriage of RBM including carriage. (Complete Job). |
| 19 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil . lead upto 25 meter beyond 1 m from cutting edge. |
| 20 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 21 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) including carriage of material. |
| 22 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) : |
| 23 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: |
| 24 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. |
| 25 | Providing and fixing M.S. grills/sheetsof required pattern in frames of windows etc. with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete - Fixed to steel windows by welding |
| 26 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece. |
| 27 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material inclusing all leadsas per direction of Engineer-in-charge: |
| 28 | Dry stone pitching (any thickness) including supply and carriage of stones - On Horizontal (Complete Job) |
| 29 | Dry stone pitching (any thickness) including supply and carriage of stones - On Slopes (Complete Job) |
| 30 | Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing and carriage of material. (Complete Job). |
| 31 | Wall Painting with acrylic emulsion paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 32 | White washing with lime to give an even shade on New Work (three or more coats) |
| 33 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 34 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 35 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 36 | Re-lettering with black Japan paint of approved brand and manufacture.(Complete Job). |
| 37 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge. |
| 38 | Carriage of bricks AV 35 KM by Mechanical Transport. |
| 39 | Disposal of dumped Silt/Mulba/Unhygenic material from canal banks AV 200 Mtr by Mannual/Head Load. |
| 40 | Disposal of dumped Silt/Mulba/Unhygenic material from canal banks byAV 2 KMMechanical Transport. |
| 41 | Supply of Superiod Quality T&P Articles - (a) AXE |
| 42 | (b) Showel |
| 43 | (c)Gum Shoes |
| 44 | (d)Spade |
| 45 | ( e)Sickle |
| 46 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fastenersshall be paid for separately): Second class deodar wood |
| 47 | Providing and fixing 30mm wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of Engineer-in-charge : Second class deodar wood. |
| 48 | Renewing glass panes, with putty and nails wherever necessary including raking out old putty : Float glass panes of thickness 4.0 mm(weight not less than 10kg/sqm) |
| 49 | Supply of long bamboo alongwith Panjas for removal of floating material from canal. |
| 50 | Hand-packing stones in wire-crates; including supply of stones, carriage of stones excluding cost of crates. |
| 51 | Tipping stone-filled wire crates in position; including equipment charges, Supply of stones, carriage of stonesexcluding cost of boxes |
| 52 | Supply of knited wire crates GI Wire Crates Mesh 10 cm x 10 cm (i) Size 6.0 x 1.50 x 1.50 |
| 53 | Supply of knited wire crates GI Wire Crates Mesh 10 cm x 10 cm (i) Size 6.0 x 1.20 x 1.20 |
| 54 | Supply of boxes (Size 1.50 x 1.50 x 1.20) |
| 55 | Supply of polythene sheets. |
| 56 | Supplying at site R.C.C. Standards post/ struts/rails/ poles of mix 1:1.5:3 (1 cement 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). |
| 57 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire |
| 58 | Supply and fixing of Iron Sigh Boards including painting writing on it (Size 2\" x 3\"), Iron Sign Board with angle iron legs and frame of 40 x 40 x 6 mm embedded in Cement Concrete Blocks. Complete Job. |
| 59 | Chemical treatment of vegetation along the bank of canals/minors (Rounup & Agni Chemicals) |
| 60 | Carriage of earth AV 200 Mtrby Head Load. |
| 61 | Carriage of earth AV 5 KM by Mechanical Transport. |