Piped Water Supply Scheme At. Nhave, Tal. Panvel Dist.Raigad ( Jal Jeevan Mission )
Tender Value
1.43 Crore
Estimated cost
Bid Submission
25 Jul 2022
0 days left
EMD
1.43 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
panvel → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Piped Water Supply Scheme At. Nhave, Tal. Panvel Dist.Raigad ( Jal Jeevan Mission )
BOQ
| Sl. No. | Item Description |
| 1 | SUBWORK 1:- Gravity mainItem No 1:-Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete.Note:- H.D.P.E. Pipes shall be as per latest IS Specifications Also HDPE pipes upto 110 mm Dia shall be in coil form75 mm Dia HDPE Pipe 8Kg/sqcm |
| 2 | 90 mm Dia HDPE Pipe 8 Kg/sqcm |
| 3 | Item No 2:- 5% of cost of pipes shall be considered for cost of PVC/HDPE specials for estimate purpose only. |
| 4 | Item No 3:- Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete PN -1 (Without by pass)Sluice valves 80mm Dia |
| 5 | Item No 4:- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Earth soils |
| 6 | Item No 5:- Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.HMB |
| 7 | Item No 6:- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Soft Rock |
| 8 | Item No 7:- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc.omplete by all means. Hard Rock |
| 9 | Item No 8:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. |
| 10 | Item No 9:- Lowering, Laying and Jointing H. D. P. E./M.D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II75 mm Dia HDPE Pipe 8 Kg/sqcm |
| 11 | 90 mm Dia HDPE Pipe 8 Kg/sqcm |
| 12 | Item No 10:- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)Sluice valves 80mm Dia |
| 13 | Item No 11:- Providing and laying in situ Cement Concrete of trap/ granite / quartzite /gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering,form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement)a) 1:2:4 (M-150) grade for Thrust Blocks |
| 14 | Item No 12:- Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.As above of 90 x 60 cm internal size and depth upto 1.2 M with precast R.C.C slab cover. |
| 15 | Item No 13:- Refillingthetrencheswithavailableexcavatedstuffwith soft materialfirst over pipeline andthen hardmaterial in 15cmlayerswithallleadsandliftsincluding consolidation, surcharging, etc. complete |
| 16 | Item No 14:- Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position.75mm Dia HDPE Pipe 8 Kg/sqcm |
| 17 | 90 mm Dia HDPE Pipe 8 Kg/sqcm |
| 18 | SUBWORK 2:-RCC Sump Pro RCC Sump for Nhavre North 10KLDesigning (aesthetically), and constructing RCC ground service reservoirs / RCC sumps in M-300 mix. of required capacity including excavation in all types of strata, foundation concrete,container walls, bottom slab top RCC roof slab / or dome, 20 mm thick cement plaster with water proofing compound in CM1:3 proportion. to inside face of the container,including epoxy paint from inside including refilling and disposing of surplus stuff within lead of 50 M, all labour and material charges, for laying and jointing of pipe assembly for inlet, outlet washout,over flow and bye-pass arrangement consisting of C.I./ M.S.D/F. pipes, specials and valves of given diameters, providing and fixing accesso- ries such as Stainless Steel ladder inside andoutside, C.I. Manhole frame and cover, water top slab, B.B.masonry chamber for all valves, ventilating shafts, including giving satisfactory hydraulic test and water tightness test as per IS code and providing three coats of Acrylic emulsion with Silicon additives Paint to all expose surface of structure including roof surface etc. com- plete as per design data,criteria, obligatory requirements and detailed specifications.Antitermite treatment shall be given for under ground portion of structure.Note :1. The designing shall be in accordance with various rel evant I.S. specification (I.S. 456/2000 (Latest edition) , I.S. 875 -1987, I.S.3370-1965 or revised.)2. Only M.S. bars grade I confirming to I.S. 432 part-I or high yield strength deformed bars confirming to I.S. 1786 or I.S.1139 shall be used grade II M.S. bars shall not be used.3. Entire structure shall be constructed in M300 only.4. The scope of pipe assembly work shall be upto 5 metrebeyond outside face of the wall, cost of pipes valves andspecials is not included in the rate but labour cost for laying andjointing is included.5. The G.S.R. / Sump above 15 lakh litres capacity shall be intwo compartment.6. The job includes designing the structure for uplift pressureand dewatering if required using entire execution and disposalof surplus excavated stuff within lead of 50 metres as directedby Engineer-in-charge. If up lifts considered in design thenthese rate shall be increased by 7.5%.7. G.S.R. outlets shall be with bell mouth of approved partern in bottom slab and cost of designing bell mouth is included in therate. Sump well includes cost of suction pit required at bottom.8. For pipe diameters upto 300 mm only CI pipes and CI specials shall be used. For pipe diameters above 300mm,M.S.pipes and specials minimum 10 mm thick shall be used with proper anticorrosive epoxy treatment from inside and outside.9. Cost of pump house is not included in these rates.10. Above rates are applicable for seismic zones-2,3 and 4.11. 75% part rate shall be payable for reinforcement,concrete and plastering items of all types of G.S.R.s. and sumps till satisfactory hydraulic testing for water tightness test is given and till that work shall be treated as incomplete.12. 10% shall be added for sump if overhead pump house isproposedNote : Condition from Sr. No. 1 to 11 shall form a part andparcel of tender and must be included in the Draft tenderpapers for work of R.C.C. GSRs and sump. Sump of Cap 10000 litres rate Rs is |
| 19 | Add 10% forMMRDA Rs. |
| 20 | ProRCC Sump 10000 LIT Nhave CentralDesigning (aesthetically), and constructing RCC ground service reservoirs / RCC sumps in M-300 mix. of required capacity including excavation in all types of strata, foundation concrete,container walls, bottom slab top RCC roof slab / or dome, 20 mm thick cement plaster with water proofing compound in CM1:3 proportion. to inside face of the container,including epoxy paint from inside including refilling and disposing of surplus stuff within lead of 50 M, all labour and material charges, for laying and jointing of pipe assembly for inlet, outlet washout,over flow and bye-pass arrangement consisting of C.I./ M.S.D/F. pipes, specials and valves of given diameters, providing and fixing accesso- ries such as Stainless Steel ladder inside andoutside, C.I. Manhole frame and cover, water top slab, B.B.masonry chamber for all valves, ventilating shafts, including giving satisfactory hydraulic test and water tightness test as per IS code and providing three coats of Acrylic emulsion with Silicon additives Paint to all expose surface of structure including roof surface etc. com- plete as per design data,criteria, obligatory requirements and detailed specifications.Antitermite treatment shall be given for under ground portion of structure.Note :1. The designing shall be in accordance with various rel evant I.S. specification (I.S. 456/2000 (Latest edition) , I.S. 875 -1987, I.S.3370-1965 or revised.)2. Only M.S. bars grade I confirming to I.S. 432 part-I or high yield strength deformed bars confirming to I.S. 1786 or I.S.1139 shall be used grade II M.S. bars shall not be used.3. Entire structure shall be constructed in M300 only.4. The scope of pipe assembly work shall be upto 5 metrebeyond outside face of the wall, cost of pipes valves andspecials is not included in the rate but labour cost for laying andjointing is included.5. The G.S.R. / Sump above 15 lakh litres capacity shall be intwo compartment.6. The job includes designing the structure for uplift pressureand dewatering if required using entire execution and disposalof surplus excavated stuff within lead of 50 metres as directedby Engineer-in-charge. If up lifts considered in design thenthese rate shall be increased by 7.5%.7. G.S.R. outlets shall be with bell mouth of approved partern in bottom slab and cost of designing bell mouth is included in therate. Sump well includes cost of suction pit required at bottom.8. For pipe diameters upto 300 mm only CI pipes and CI specials shall be used. For pipe diameters above 300mm,M.S.pipes and specials minimum 10 mm thick shall be used with proper anticorrosive epoxy treatment from inside and outside.9. Cost of pump house is not included in these rates.10. Above rates are applicable for seismic zones-2,3 and 4.11. 75% part rate shall be payable for reinforcement,concrete and plastering items of all types of G.S.R.s. and sumps till satisfactory hydraulic testing for water tightness test is given and till that work shall be treated as incomplete.12. 10% shall be added for sump if overhead pump house isproposedNote : Condition from Sr. No. 1 to 11 shall form a part andparcel of tender and must be included in the Draft tenderpapers for work of R.C.C. GSRs and sump. Sump of Cap 9000 litres rate Rs is |
| 21 | Add 10% forMMRDA Rs. |
| 22 | RCC Sump 10000 LIT Nhave SouthDesigning (aesthetically), and constructing RCC ground service reservoirs / RCC sumps in M-300 mix. of required capacity including excavation in all types of strata, foundation concrete,container walls, bottom slab top RCC roof slab / or dome, 20 mm thick cement plaster with water proofing compound in CM1:3 proportion. to inside face of the container,including epoxy paint from inside including refilling and disposing of surplus stuff within lead of 50 M, all labour and material charges, for laying and jointing of pipe assembly for inlet, outlet washout,over flow and bye-pass arrangement consisting of C.I./ M.S.D/F. pipes, specials and valves of given diameters, providing and fixing accesso- ries such as Stainless Steel ladder inside andoutside, C.I. Manhole frame and cover, water top slab, B.B.masonry chamber for all valves, ventilating shafts, including giving satisfactory hydraulic test and water tightness test as per IS code and providing three coats of Acrylic emulsion with Silicon additives Paint to all expose surface of structure including roof surface etc. com- plete as per design data,criteria, obligatory requirements and detailed specifications.Antitermite treatment shall be given for under ground portion of structure.Note :1. The designing shall be in accordance with various rel evant I.S. specification (I.S. 456/2000 (Latest edition) , I.S. 875 -1987, I.S.3370-1965 or revised.)2. Only M.S. bars grade I confirming to I.S. 432 part-I or high yield strength deformed bars confirming to I.S. 1786 or I.S.1139 shall be used grade II M.S. bars shall not be used.3. Entire structure shall be constructed in M300 only.4. The scope of pipe assembly work shall be upto 5 metrebeyond outside face of the wall, cost of pipes valves andspecials is not included in the rate but labour cost for laying andjointing is included.5. The G.S.R. / Sump above 15 lakh litres capacity shall be intwo compartment.6. The job includes designing the structure for uplift pressureand dewatering if required using entire execution and disposalof surplus excavated stuff within lead of 50 metres as directedby Engineer-in-charge. If up lifts considered in design thenthese rate shall be increased by 7.5%.7. G.S.R. outlets shall be with bell mouth of approved partern in bottom slab and cost of designing bell mouth is included in therate. Sump well includes cost of suction pit required at bottom.8. For pipe diameters upto 300 mm only CI pipes and CI specials shall be used. For pipe diameters above 300mm,M.S.pipes and specials minimum 10 mm thick shall be used with proper anticorrosive epoxy treatment from inside and outside.9. Cost of pump house is not included in these rates.10. Above rates are applicable for seismic zones-2,3 and 4.11. 75% part rate shall be payable for reinforcement,concrete and plastering items of all types of G.S.R.s. and sumps till satisfactory hydraulic testing for water tightness test is given and till that work shall be treated as incomplete.12. 10% shall be added for sump if overhead pump house isproposedNote : Condition from Sr. No. 1 to 11 shall form a part andparcel of tender and must be included in the Draft tenderpapers for work of R.C.C. GSRs and sump. Sump of Cap 8000 litres rate Rs is |
| 23 | Add 10% forMMRDA Rs. |
| 24 | SUBWORK 3:-SWITCHROOM (Siz- 2.50mX 2.50m) 3 no Nhave North,South & CentralItem No 1:-Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 25 | Item No 2:- Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 26 | Item No 3:- Providing and laying in situ cement concrete in M – 15 (1:2:4) grade of trap /granite/quartzite/gneiss metal for foundation & bedding including bailing out water manually, form work compaction & curing, etc complete. |
| 27 | Item No 4:- Providing uncoursed rubble masonry of t rap / granite / quartzite /gneiss stones in cement mor tar 1:6 in foundation and plinth of innerwalls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and water ing etc.complete. |
| 28 | Item No 5:- Providing second class Burnt Br ick masonry wi th convent ional/ I.S.type br icks in cement mor tar 1:6 in superst ructure including striking joints, raking out joints, water ing and scaffolding etc. Complete |
| 29 | Item No 6:- Providing and casiting in situ CC of trap /granite/quartzite/gneiss metal ofapprovedquality for R CCwork asper detailed drawing anddesigns or as diredcted by Engineer – in- charge including normal dewatering, centering, fromwork,compaction, finishing the formed surface withCM 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish to be provided and curing, etc complete. |
| 30 | Item No 7:- Providing internal cement plaster 20mm. thick in two coats in cement mortar 1:3 without neeru finish, to concrete, brick surface, in all positions including scaffolding and cur ing etc. complete. |
| 31 | Item No 8:- Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 daysnd keeping the surface of the base coatrough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surfaceby taking out grains and curing for fourteen days scaffolding etc.complete. |
| 32 | Item No 9:-Filling the plinth & floors Murum bedding in trenches with approved murum from excavatyed materials form foundation15 cm. to 20 cm. layers including watering and compaction complete. |
| 33 | Item No 10:-Providing and laying cement concrete flooring 40 mm thick wi th M15 cement concrete laid to proper level and slope in alternate bays including compact ion, fi lling joints, marking lines to give the appearance of t i les of 30 cm x 30 cm or other size laid diagonally / square etc finishing smooth (wi th ext ra cement ) in any colour as directed and cur ing etc. complete. With Natural Sand |
| 34 | Item No 11:-Providing and fixing frame wi th / wi thout ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebat ing, iron holdfast of size 300mm x 40mm x5mm with oil paint ing, etc. complete |
| 35 | Item No 12:-Providing and fixing Count ry cut teak wood double or single leaf panelled shut ters, 35 mm thick style top and freze rail 95 x 35 thick with lock and bottam rail 195 x 25 mm thick and panels without ventilator as per detai led drawing excluding the door frame, stainless steel fixtures and fastening and finishing the wood work wi th oil paint ing 3 coats complete |
| 36 | Item No 13:-Providing and fixing Count ry cut teak wood windows wi th double leaf 25 mm thick planked shutters without ventilators as per detailed drawings including stainless steel fixtures and fastenings and finishingthe wood work wi th oil paint ing 3 coats etc. complete |
| 37 | Item No 14:-Providing flush grooved pointing with cement mor tar 1:3 for stone masonry work including scaffolding and curing etc. complete. |
| 38 | Item No 15:-Providing and applying washable oil bound distemper of approved colour and shade to old/ new surfaces, in three coats including scaffolding, preparing the surface to receive the priming coat and finishing coat etc. complete. |
| 39 | Item No 16:-Providing and fixing locking arrangement the standered qualityof lock for pump house, etc complete |
| 40 | Item No 17:-Providing and fixing in position steel bar reinforcement of various diamenters for RCC piles, caps, footing, foundation, slabs, beams, columns, canopies, staircases, newels,chjjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules, including cutting, bending, hooking he bars, binding with wires or tack welding and supporting as required, etc. complete.(including cost of binding wire) |
| 41 | 3 No of Switch room for Nhave North,south& Central |
| 42 | SUBWORK 4:- PUMPING MACHINERY 10.0 BHPItem No 1:- Providing, erecting and giving test of submersible Monoblock pump set conforming to IS 8034 and motor conforming to IS 9283, with water proof winding. Pump shall be suitable for various delivery head and discharge with stainless steel shaft. Motor suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.c. Supply, with cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust. The pump set shall be suitable for direct coupling, with suitable suction strainer. Pump should have suitable discharge out let as per manufacturer\"s design. Antithrust stream lined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single /double run and 2 pairs of suitable size erection clamp 10 mm thick shall be provided with each pump.Submersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge 4.51 lit/sec, 71 mtr head |
| 43 | Item No 2:- Supplying and erecting, Flat flexible submersible cable with, Copper Conductor, PVC insulated, and PVC sheathed.3 core 6sqmm |
| 44 | Item No 3:- Supplying and erecting Fully Automatic StarDelta starter to operate squirrel cage induction motor working on 380- 440 Volt, 3 phase, 50 Hzwith no volt coil, over load element, and ON - OFF push buttons, with necessary material andconnected to supply, etcomplete. Starter withoriginal sheet steel encloser. 7.5 HP & Up to 12.5 HP |
| 45 | Item No 4:- Providing , installing & commissioning main control pannel boardincluding V.meter & A. meter of suitable range single phase prevention 8 Nos. of phase indicater lamps with colour glass of 230 V rotary switch over load capacitor suitable for 7.50HP and 12.50BHP pump etc.complete. (Market rate) |
| 46 | Item No 5:- Providing, erecting Pressure gauge of required range complete with syphon tube, isolating cock suitable for 12 mm dia G.I. Pipe. Pressure gauge shall be installed as directed, with tapping on rising main. |
| 47 | Item No 6:- Providing tools for pumping. |
| 48 | Item No 7:- Main wiring work from M. S. E. B. cut out to the panel board 4 core x 16 sq mm 1100 grade with I. S. I. Mark standard / Aluminum armored cable (94.1 p.36) |
| 49 | Item No 8:- Providing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm dia. G.l. Rod complete with all materials as per specification no. EA-EP |
| 50 | Item No 9:- Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with eachfull length of pipe cost of which is included inrates below.65 mm, Medium class |
| 51 | Item No 10:- Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.65 mm, Medium class |
| 52 | Item No 11:- Providing and erecting double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, ainless steel spindle, caps, including inspection harges, transportation upto departmental store, loading, stacking excluding GST levied by GOI & OM in all respect etc. complete.65mm Dia |
| 53 | Item No 12:- Providing, supplying and erecting ISI mark CI D/F reflux valves (non-return valves ) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete.Reflux valves as per I.S.5312 Part I (1984)65mm Dia |
| 54 | Item No 13:- Chain Pulley BlockProviding, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying lSI mark, 1 Tonne capacity |
| 55 | Item No 14:- Travelling TrolleyProviding, erecting Travelling Trolley of capacity as below with 6 m lift, tested to 50% over load1 Tonne capacity |
| 56 | Item No 15:- Structural SteelProviding, installing and commissioning of track girders/ ISMB 150Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. |
| 57 | PUMPINGMACHINERY 3.00 BHP Nhave CentralItem No 1:-Providing, erecting and giving test of submersible Monoblock pump set conforming to IS 8034 and motor conforming to IS 9283, with water proof winding. Pump shall be suitable for various delivery head and discharge with stainless steel shaft. Motor suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.c. Supply, with cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust. The pump set shall be suitable for direct coupling, with suitable suction strainer. Pump should have suitable discharge out let as per manufacturer\"s design. Antithrust stream lined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single /double run and 2 pairs of suitable size erection clamp 10 mm thick shall be provided with each pump.Submersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge1.16 lit/sec, 21 mtr head3 BHP pumpsetSubmersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge1.16 lit/sec, 21 mtr head |
| 58 | Item No 2:- Supplying and erecting, Flat flexible submersible cable with, Copper Conductor, PVC insulated, and PVC sheathed.3 core 2.5 sqmm |
| 59 | Item No 3:- Supplying and erecting assembled DOL starter in provided cubical panel, with ON-OFF push buttons, no volt coil, over load element and required power and control wiring complete.Upto 7.5HP |
| 60 | Item No 4:- Providing , installing & commissioning main control pannel boardincluding V.meter & A. meter of suitable range single phase prevention 8 Nos. of phase indicater lamps with colour glass of 230 V rotary switch over load capacitor suitable for 7.50HP and 12.50BHP pump etc.complete. (Market rate) |
| 61 | Item No 5:- Providing, erecting Pressure gauge of required range complete with syphon tube, isolating cock suitable for 12 mm dia G.I. Pipe. Pressure gauge shall be installed as directed, with tapping on rising main.Pressure gauge (100mm Dia) |
| 62 | Item No 6:- Providing tools for pumping. |
| 63 | Item No 7:- Main wiring work from M. S. E. B. cut out to the panel board 4 core x 16 sq mm 1100 grade with I. S. I. Mark standard / Aluminum armored cable (94.1 p.36) |
| 64 | Item No 8:- Providing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm dia. G.l. Rod complete with all materials as per specification no. EA-EP |
| 65 | Item No 9:- Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with eachfull length of pipe cost of which is included inrates below.50mm ,Medium class |
| 66 | Item No 10:- Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.50mm ,Medium class |
| 67 | Item No 11:- Providing and erecting double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, ainless steel spindle, caps, including inspection harges, transportation upto departmental store, loading, stacking excluding GST levied by GOI & OM in all respect etc. complete.50mm Dia |
| 68 | Item No 12:- Providing, supplying and erecting ISI mark CI D/F reflux valves (non-return valves ) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete.Reflux valves as per I.S.5312 Part I (1984)50mm Dia |
| 69 | Item No 13:- Chain Pulley BlockProviding, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying lSI mark, 1 Tonne capacity |
| 70 | Item No 14:- Travelling TrolleyProviding, erecting Travelling Trolley of capacity as below with 6 m lift, tested to 50% over load1 Tonne capacity |
| 71 | Item No 15:- Structural SteelProviding, installing and commissioning of track girders/ ISMB 150Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. |
| 72 | PUMPINGMACHINERY 3.00 BHP Nhave NorthItem No 1:-Providing, erecting and giving test of submersible Monoblock pump set conforming to IS 8034 and motor conforming to IS 9283, with water proof winding. Pump shall be suitable for various delivery head and discharge with stainless steel shaft. Motor suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.c. Supply, with cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust. The pump set shall be suitable for direct coupling, with suitable suction strainer. Pump should have suitable discharge out let as per manufacturer\"s design. Antithrust stream lined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single /double run and 2 pairs of suitable size erection clamp 10 mm thick shall be provided with each pump.Submersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge1.16 lit/sec, 21 mtr head3 BHP pumpsetSubmersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge1.27 lit/sec, 21 mtr head |
| 73 | Item No 2:- Supplying and erecting, Flat flexible submersible cable with, Copper Conductor, PVC insulated, and PVC sheathed.3 core 2.5 sqmm |
| 74 | Item No 3:- Supplying and erecting assembled DOL starter in provided cubical panel, with ON-OFF push buttons, no volt coil, over load element and required power and control wiring complete.Upto 7.5HP |
| 75 | Item No 4:- Providing , installing & commissioning main control pannel boardincluding V.meter & A. meter of suitable range single phase prevention 8 Nos. of phase indicater lamps with colour glass of 230 V rotary switch over load capacitor suitable for 7.50HP and 12.50BHP pump etc.complete. (Market rate) |
| 76 | Item No 5:- Providing, erecting Pressure gauge of required range complete with syphon tube, isolating cock suitable for 12 mm dia G.I. Pipe. Pressure gauge shall be installed as directed, with tapping on rising main.Pressure gauge (100mm Dia) |
| 77 | Item No 6:- Providing tools for pumping. |
| 78 | Item No 7:- Main wiring work from M. S. E. B. cut out to the panel board 4 core x 16 sq mm 1100 grade with I. S. I. Mark standard / Aluminum armored cable (94.1 p.36) |
| 79 | Item No 8:- Providing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm dia. G.l. Rod complete with all materials as per specification no. EA-EP |
| 80 | Item No 9:- Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with eachfull length of pipe cost of which is included inrates below.50mm ,Medium class |
| 81 | Item No 10:- Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.50mm ,Medium class |
| 82 | Item No 11:- Providing and erecting double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, ainless steel spindle, caps, including inspection harges, transportation upto departmental store, loading, stacking excluding GST levied by GOI & OM in all respect etc. complete.50mm Dia |
| 83 | Item No 12:- Providing, supplying and erecting ISI mark CI D/F reflux valves (non-return valves ) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete.Reflux valves as per I.S.5312 Part I (1984)50mm Dia |
| 84 | Item No 13:- Chain Pulley BlockProviding, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying lSI mark, 1 Tonne capacity |
| 85 | Item No 14:- Travelling TrolleyProviding, erecting Travelling Trolley of capacity as below with 6 m lift, tested to 50% over load1 Tonne capacity |
| 86 | Item No 15:- Structural SteelProviding, installing and commissioning of track girders/ ISMB 150Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. |
| 87 | PUMPINGMACHINERY 3.00 BHP Nhave SouthItem No 1:-Providing, erecting and giving test of submersible Monoblock pump set conforming to IS 8034 and motor conforming to IS 9283, with water proof winding. Pump shall be suitable for various delivery head and discharge with stainless steel shaft. Motor suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.c. Supply, with cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust. The pump set shall be suitable for direct coupling, with suitable suction strainer. Pump should have suitable discharge out let as per manufacturer\"s design. Antithrust stream lined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single /double run and 2 pairs of suitable size erection clamp 10 mm thick shall be provided with each pump.Submersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge1.16 lit/sec, 21 mtr head3 BHP pumpsetSubmersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge 1.04 lit/sec, 21 mtr head |
| 88 | Item No 2:- Supplying and erecting, Flat flexible submersible cable with, Copper Conductor, PVC insulated, and PVC sheathed.3 core 2.5 sqmm |
| 89 | Item No 3:- Supplying and erecting assembled DOL starter in provided cubical panel, with ON-OFF push buttons, no volt coil, over load element and required power and control wiring complete.Upto 7.5HP |
| 90 | Item No 4:- Providing , installing & commissioning main control pannel boardincluding V.meter & A. meter of suitable range single phase prevention 8 Nos. of phase indicater lamps with colour glass of 230 V rotary switch over load capacitor suitable for 7.50HP and 12.50BHP pump etc.complete. (Market rate) |
| 91 | Item No 5:- Providing, erecting Pressure gauge of required range complete with syphon tube, isolating cock suitable for 12 mm dia G.I. Pipe. Pressure gauge shall be installed as directed, with tapping on rising main.Pressure gauge (100mm Dia) |
| 92 | Item No 6:- Providing tools for pumping. |
| 93 | Item No 7:- Main wiring work from M. S. E. B. cut out to the panel board 4 core x 16 sq mm 1100 grade with I. S. I. Mark standard / Aluminum armored cable (94.1 p.36) |
| 94 | Item No 8:- Providing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm dia. G.l. Rod complete with all materials as per specification no. EA-EP |
| 95 | Item No 9:- Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with eachfull length of pipe cost of which is included inrates below.50mm ,Medium class |
| 96 | Item No 10:- Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.50mm ,Medium class |
| 97 | Item No 11:- Providing and erecting double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, ainless steel spindle, caps, including inspection harges, transportation upto departmental store, loading, stacking excluding GST levied by GOI & OM in all respect etc. complete.50mm Dia |
| 98 | Item No 12:- Providing, supplying and erecting ISI mark CI D/F reflux valves (non-return valves ) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete.Reflux valves as per I.S.5312 Part I (1984)50mm Dia |
| 99 | Item No 13:- Chain Pulley BlockProviding, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying lSI mark, 1 Tonne capacity |
| 100 | Item No 14:- Travelling TrolleyProviding, erecting Travelling Trolley of capacity as below with 6 m lift, tested to 50% over load1 Tonne capacity |
| 101 | Item No 15:- Structural SteelProviding, installing and commissioning of track girders/ ISMB 150Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. |
| 102 | SUBWORK 5:- Rising MainItem No 1:- Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete.Note:- H.D.P.E. Pipes shall be as per latest IS Specifications Also HDPE pipes upto 110 mm Dia shall be in coil form.75 mm Dia HDPE Pipe 8 Kg/sqcm |
| 103 | 125 mm Dia HDPE Pipe 8 Kg/sqcm |
| 104 | Item No 2:- 5% of cost of pipes shall be considered for cost of PVC/HDPE specials for estimate purpose only. |
| 105 | Item No 3:- Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete PN -1 (Without by pass)Sluice valves 80 mm Dia |
| 106 | Sluice valves 125 mm Dia |
| 107 | Item No 4:- Providing and supplying Air Valves as per IS- 14845-2000 and MJP’s standard specifications of approved make and quality of following diameters including railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores, unloding and stacking excluding GST levied by GOI & GOM in all respect etc. complete.Air Valve Single Ball Flanged / ScrewedType - PN -1Air valves 20mm Dia |
| 108 | Item No 5:- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Earth soils |
| 109 | Item No 6:- Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. completeHMB. |
| 110 | Item No 7:- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Soft Rock |
| 111 | Item No 8:- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc.omplete by all means. Hard Rock |
| 112 | Item No 9:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. |
| 113 | Item No 10:- Lowering, Laying and Jointing H. D. P. E./M.D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II75 mm Dia HDPE Pipe 8 Kg/sqcm |
| 114 | 125 mm Dia HDPE Pipe 8 Kg/sqcm |
| 115 | Item No 11:- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)Sluice valves 80mm Dia |
| 116 | Sluice valves 125 mm Dia |
| 117 | Item No 12:- Lowering, laying and fixing in proper alignment and position all types of C.I. air valves as directed by Engineer-in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc. complete. (for all class of valves)Air valves 20mm Dia |
| 118 | Item No 13:- Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -in- charge for following diameters of pipe lines (type design attached.)Foundation on Murum and Harder Strata.upto 150mm |
| 119 | Item No 14:- Providing and laying in situ Cement Concrete of trap/ granite / quartzite /gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering,form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement)a) 1:2:4 (M-150) grade for Thrust Blocks |
| 120 | Item No 15:- Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.As above of 90 x 60 cm internal size and depth upto 1.2 M with precast R.C.C slab cover. |
| 121 | Item No 16:- Refillingthetrencheswithavailableexcavatedstuffwith soft materialfirst over pipeline andthen hardmaterial in 15cmlayerswithallleadsandliftsincluding consolidation, surcharging, etc. complete |
| 122 | Item No 17:- Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position.75 mm Dia HDPE Pipe 8 Kg/sqcm |
| 123 | 125 mm Dia HDPE Pipe 8 Kg/sqcm |
| 124 | SUBWORK 6:- R.C.C. ESR100000 LIT 9M @ NhaveItem No 1:- Designing (aesthetically),and constructingRCCelevatedservice reservoirsoffollowingcapacitywith RCCstagingconsistingofcolumns, internalandexternalbracingsspaced verticallynotmore than4.5 metres centre to centre for ESR having capacityupto500cumandnotmore than 6 m c/c for ESRs having capacity above 500 Cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compoundtotheinsidefaceofthe containerincludingrefillingdisposing off the surplus stuff within a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypassarrangements asper departmental design, providing andfixingaccessoriessuchasM.S. ladder, C.I. manhole frame and covers, waterlevelindicators,lightening conductor, G.I. pipe railing around walk way and top slab, providing spiral stair casefromgroundleveltorooflevel, M.S. grill gate of 2 M height with locking arrangementofapproveddesign,B.B. masonry chambers for all valves, ventilatingshafts,providingand applying three coats of cement paint to the structure including roof slab, epoxy painting to internal surface and anti- termite treatment for underground parts ofthestructureandgivingsatisfactory watertightnesstestasperI.S.code. The job to include painting the name of theschemeandotherdetailsonthe reservoir as per the directions of Engineer-in-Charge.1)The design of the structure be in accordance with relevant I.S. specification (I.S. 3370 - 1965 or revised.)2)The design shall satisfy the stipulations as per I.S. 1893 - 1984 and I.S. 13920 / 1993 for seismic force and I.S. - 11682/ 1985 for R.C.C. staging of overhead tanks.3)For design having more than 6 columns, provision of internal bracing is obligatory. External bracings is also obligatory.4)The entire structure shall be in M-300 mix only.5)Plain round mild steel bars grade-I conforming to I.S. 432 part-I or high yield strength deformed bars conforming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed.6)Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the ground level.7)These rates include providing M.S. ladder for E.S.R.s upto 2 lakh litres capacity and providing spiral staircase for E.S.R. above 2 lakh litres capacity.8)Staging shall have to be designed with stresses of M-200 concrete for ESR. However all RCC construction should be done in M-300.9)These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is stretch at shallow depth, extra provision of dewatering shall be made as per site condition.10)All conditions given in the Member Secretary\"s Circular No. MJP / TS-I / 350 / 1668 dt. 2-8-97 and MJP / S-I / 350 / 2127 dt. 13-7-99 shall be strictly followed and additional cost, if any, due to these conditions is included in the rates mentioned below.11)75% part rate shall be payable for reinforcement concrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given; and till that work shall be treated as incomplete.12)The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet, washout, overflow and bypass arrangement. The scope of work, however, includes cost of erecting, laying and jointing of pipes and valves including cost of jointing materials upto 5 M beyond outer face of outermost column13)For ESR upto 500 cum capacity C.I. double flanged pipes upto 300 mm dia shall be provided and C.I. specials shall be used. For ESR above 500 cum capacity C.I./M.S. pipe assembly with minimum 8 mm thickness upto 500 mm dia and minimum 10 mm thickness above 500 mm dia can be used with proper anti-corrosive epoxy treatment from inside and outside.14)Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item.15)The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR.16)The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below12 to 16 M staging - 2% per metre16 to 20 M staging - 3% per metre20 M and above - 4% per metrecost of 75,000 Liters capacity |
| 125 | Item No 2:- Providing ISI mark GI. pipe of following class and dia.excluding GST levied by GOI & GOM in all respect,inspection charges, transportation to stores, etc. complete as per IS-1239/2004.Inlet,OverflowG. I Pipe125 mm ( 16.70 kg/m ) |
| 126 | G. I Pipe150 mm.( 19.70 kg./m ) |
| 127 | Item No 3:- Providing and supplying double flange sluice valves confirming for IS 2906/14846 including warn gear arrangement as per test pressure stainless steel spindle capsexcluding GST levied by Gol and GoM in all respect , transportation etc complete.Sluice valves 125mm Dia |
| 128 | Sluice Valve 150mm Dia ( PN -1) |
| 129 | SUBWORK 6:- R.C.C. ESR30000 LIT 9M @ Nhave NorthItem No 1:- Designing (aesthetically),and constructingRCCelevatedservice reservoirsoffollowingcapacitywith RCCstagingconsistingofcolumns, internalandexternalbracingsspaced verticallynotmore than4.5 metres centre to centre for ESR having capacityupto500cumandnotmore than 6 m c/c for ESRs having capacity above 500 Cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compoundtotheinsidefaceofthe containerincludingrefillingdisposing off the surplus stuff within a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypassarrangements asper departmental design, providing andfixingaccessoriessuchasM.S. ladder, C.I. manhole frame and covers, waterlevelindicators,lightening conductor, G.I. pipe railing around walk way and top slab, providing spiral stair casefromgroundleveltorooflevel, M.S. grill gate of 2 M height with locking arrangementofapproveddesign,B.B. masonry chambers for all valves, ventilatingshafts,providingand applying three coats of cement paint to the structure including roof slab, epoxy painting to internal surface and anti- termite treatment for underground parts ofthestructureandgivingsatisfactory watertightnesstestasperI.S.code. The job to include painting the name of theschemeandotherdetailsonthe reservoir as per the directions of Engineer-in-Charge.1)The design of the structure be in accordance with relevant I.S. specification (I.S. 3370 - 1965 or revised.)2)The design shall satisfy the stipulations as per I.S. 1893 - 1984 and I.S. 13920 / 1993 for seismic force and I.S. - 11682/ 1985 for R.C.C. staging of overhead tanks.3)For design having more than 6 columns, provision of internal bracing is obligatory. External bracings is also obligatory.4)The entire structure shall be in M-300 mix only.5)Plain round mild steel bars grade-I conforming to I.S. 432 part-I or high yield strength deformed bars conforming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed.6)Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the ground level.7)These rates include providing M.S. ladder for E.S.R.s upto 2 lakh litres capacity and providing spiral staircase for E.S.R. above 2 lakh litres capacity.8)Staging shall have to be designed with stresses of M-200 concrete for ESR. However all RCC construction should be done in M-300.9)These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is stretch at shallow depth, extra provision of dewatering shall be made as per site condition.10)All conditions given in the Member Secretary\"s Circular No. MJP / TS-I / 350 / 1668 dt. 2-8-97 and MJP / S-I / 350 / 2127 dt. 13-7-99 shall be strictly followed and additional cost, if any, due to these conditions is included in the rates mentioned below.11)75% part rate shall be payable for reinforcement concrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given; and till that work shall be treated as incomplete.12)The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet, washout, overflow and bypass arrangement. The scope of work, however, includes cost of erecting, laying and jointing of pipes and valves including cost of jointing materials upto 5 M beyond outer face of outermost column13)For ESR upto 500 cum capacity C.I. double flanged pipes upto 300 mm dia shall be provided and C.I. specials shall be used. For ESR above 500 cum capacity C.I./M.S. pipe assembly with minimum 8 mm thickness upto 500 mm dia and minimum 10 mm thickness above 500 mm dia can be used with proper anti-corrosive epoxy treatment from inside and outside.14)Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item.15)The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR.16)The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below12 to 16 M staging - 2% per metre16 to 20 M staging - 3% per metre20 M and above - 4% per metrecost of 25,000 Liters capacity |
| 130 | Item No 2:- Providing ISI mark GI. pipe of following class and dia.excluding GST levied by GOI & GOM in all respect,inspection charges, transportation to stores, etc. complete as per IS-1239/2004.Inlet,OverflowG. I Pipe125 mm ( 16.70 kg/m ) |
| 131 | G. I Pipe150 mm.( 19.70 kg./m ) |
| 132 | Item No 3:- Providing and supplying double flange sluice valves confirming for IS 2906/14846 including warn gear arrangement as per test pressure stainless steel spindle capsexcluding GST levied by Gol and GoM in all respect , transportation etc complete.Sluice valves 125mm Dia |
| 133 | Sluice Valve 150mm Dia ( PN -1) |
| 134 | SUBWORK 6:- R.C.C. ESR25000 LIT 9M @ Nhave NorthItem No 1:- Designing (aesthetically),and constructingRCCelevatedservice reservoirsoffollowingcapacitywith RCCstagingconsistingofcolumns, internalandexternalbracingsspaced verticallynotmore than4.5 metres centre to centre for ESR having capacityupto500cumandnotmore than 6 m c/c for ESRs having capacity above 500 Cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compoundtotheinsidefaceofthe containerincludingrefillingdisposing off the surplus stuff within a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypassarrangements asper departmental design, providing andfixingaccessoriessuchasM.S. ladder, C.I. manhole frame and covers, waterlevelindicators,lightening conductor, G.I. pipe railing around walk way and top slab, providing spiral stair casefromgroundleveltorooflevel, M.S. grill gate of 2 M height with locking arrangementofapproveddesign,B.B. masonry chambers for all valves, ventilatingshafts,providingand applying three coats of cement paint to the structure including roof slab, epoxy painting to internal surface and anti- termite treatment for underground parts ofthestructureandgivingsatisfactory watertightnesstestasperI.S.code. The job to include painting the name of theschemeandotherdetailsonthe reservoir as per the directions of Engineer-in-Charge.1)The design of the structure be in accordance with relevant I.S. specification (I.S. 3370 - 1965 or revised.)2)The design shall satisfy the stipulations as per I.S. 1893 - 1984 and I.S. 13920 / 1993 for seismic force and I.S. - 11682/ 1985 for R.C.C. staging of overhead tanks.3)For design having more than 6 columns, provision of internal bracing is obligatory. External bracings is also obligatory.4)The entire structure shall be in M-300 mix only.5)Plain round mild steel bars grade-I conforming to I.S. 432 part-I or high yield strength deformed bars conforming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed.6)Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the ground level.7)These rates include providing M.S. ladder for E.S.R.s upto 2 lakh litres capacity and providing spiral staircase for E.S.R. above 2 lakh litres capacity.8)Staging shall have to be designed with stresses of M-200 concrete for ESR. However all RCC construction should be done in M-300.9)These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is stretch at shallow depth, extra provision of dewatering shall be made as per site condition.10)All conditions given in the Member Secretary\"s Circular No. MJP / TS-I / 350 / 1668 dt. 2-8-97 and MJP / S-I / 350 / 2127 dt. 13-7-99 shall be strictly followed and additional cost, if any, due to these conditions is included in the rates mentioned below.11)75% part rate shall be payable for reinforcement concrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given; and till that work shall be treated as incomplete.12)The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet, washout, overflow and bypass arrangement. The scope of work, however, includes cost of erecting, laying and jointing of pipes and valves including cost of jointing materials upto 5 M beyond outer face of outermost column13)For ESR upto 500 cum capacity C.I. double flanged pipes upto 300 mm dia shall be provided and C.I. specials shall be used. For ESR above 500 cum capacity C.I./M.S. pipe assembly with minimum 8 mm thickness upto 500 mm dia and minimum 10 mm thickness above 500 mm dia can be used with proper anti-corrosive epoxy treatment from inside and outside.14)Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item.15)The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR.16)The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below12 to 16 M staging - 2% per metre16 to 20 M staging - 3% per metre20 M and above - 4% per metrecost of 25,000 Liters capacity |
| 135 | Item No 2:- Providing ISI mark GI. pipe of following class and dia.excluding GST levied by GOI & GOM in all respect,inspection charges, transportation to stores, etc. complete as per IS-1239/2004.Inlet,OverflowG. I Pipe125 mm ( 16.70 kg/m ) |
| 136 | G. I Pipe150 mm.( 19.70 kg./m ) |
| 137 | Item No 3:- Providing and supplying double flange sluice valves confirming for IS 2906/14846 including warn gear arrangement as per test pressure stainless steel spindle capsexcluding GST levied by Gol and GoM in all respect , transportation etc complete.Sluice valves 125mm Dia |
| 138 | Sluice Valve 150mm Dia ( PN -1) |
| 139 | SUBWORK 6:- R.C.C. ESR25000 LIT 9M @ Nhave NorthItem No 1:- Designing (aesthetically),and constructingRCCelevatedservice reservoirsoffollowingcapacitywith RCCstagingconsistingofcolumns, internalandexternalbracingsspaced verticallynotmore than4.5 metres centre to centre for ESR having capacityupto500cumandnotmore than 6 m c/c for ESRs having capacity above 500 Cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compoundtotheinsidefaceofthe containerincludingrefillingdisposing off the surplus stuff within a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypassarrangements asper departmental design, providing andfixingaccessoriessuchasM.S. ladder, C.I. manhole frame and covers, waterlevelindicators,lightening conductor, G.I. pipe railing around walk way and top slab, providing spiral stair casefromgroundleveltorooflevel, M.S. grill gate of 2 M height with locking arrangementofapproveddesign,B.B. masonry chambers for all valves, ventilatingshafts,providingand applying three coats of cement paint to the structure including roof slab, epoxy painting to internal surface and anti- termite treatment for underground parts ofthestructureandgivingsatisfactory watertightnesstestasperI.S.code. The job to include painting the name of theschemeandotherdetailsonthe reservoir as per the directions of Engineer-in-Charge.1)The design of the structure be in accordance with relevant I.S. specification (I.S. 3370 - 1965 or revised.)2)The design shall satisfy the stipulations as per I.S. 1893 - 1984 and I.S. 13920 / 1993 for seismic force and I.S. - 11682/ 1985 for R.C.C. staging of overhead tanks.3)For design having more than 6 columns, provision of internal bracing is obligatory. External bracings is also obligatory.4)The entire structure shall be in M-300 mix only.5)Plain round mild steel bars grade-I conforming to I.S. 432 part-I or high yield strength deformed bars conforming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed.6)Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the ground level.7)These rates include providing M.S. ladder for E.S.R.s upto 2 lakh litres capacity and providing spiral staircase for E.S.R. above 2 lakh litres capacity.8)Staging shall have to be designed with stresses of M-200 concrete for ESR. However all RCC construction should be done in M-300.9)These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is stretch at shallow depth, extra provision of dewatering shall be made as per site condition.10)All conditions given in the Member Secretary\"s Circular No. MJP / TS-I / 350 / 1668 dt. 2-8-97 and MJP / S-I / 350 / 2127 dt. 13-7-99 shall be strictly followed and additional cost, if any, due to these conditions is included in the rates mentioned below.11)75% part rate shall be payable for reinforcement concrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given; and till that work shall be treated as incomplete.12)The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet, washout, overflow and bypass arrangement. The scope of work, however, includes cost of erecting, laying and jointing of pipes and valves including cost of jointing materials upto 5 M beyond outer face of outermost column13)For ESR upto 500 cum capacity C.I. double flanged pipes upto 300 mm dia shall be provided and C.I. specials shall be used. For ESR above 500 cum capacity C.I./M.S. pipe assembly with minimum 8 mm thickness upto 500 mm dia and minimum 10 mm thickness above 500 mm dia can be used with proper anti-corrosive epoxy treatment from inside and outside.14)Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item.15)The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR.16)The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below12 to 16 M staging - 2% per metre16 to 20 M staging - 3% per metre20 M and above - 4% per metrecost of 25,000 Liters capacity |
| 140 | Item No 2:- Providing ISI mark GI. pipe of following class and dia.excluding GST levied by GOI & GOM in all respect,inspection charges, transportation to stores, etc. complete as per IS-1239/2004.Inlet,OverflowG. I Pipe125 mm ( 16.70 kg/m ) |
| 141 | G. I Pipe150 mm.( 19.70 kg./m ) |
| 142 | Item No 3:- Providing and supplying double flange sluice valves confirming for IS 2906/14846 including warn gear arrangement as per test pressure stainless steel spindle capsexcluding GST levied by Gol and GoM in all respect , transportation etc complete.Sluice valves 125mm Dia |
| 143 | Sluice Valve 150mm Dia ( PN -1) |
| 144 | SUBWORK 7:- Distribution SystemItem No 1:- Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete.Note:- H.D.P.E. Pipes shall be as per latest IS Specifications Also HDPE pipes upto 110 mm Dia shall be in coil form63 mm Dia HDPE Pipe 6 Kg/sqcm |
| 145 | 75 mm Dia HDPE Pipe 6 Kg/sqcm |
| 146 | 90 mm Dia HDPE Pipe 6 Kg/sqcm |
| 147 | 110 mm Dia HDPE Pipe 6 Kg/sqcm |
| 148 | 125 mm Dia HDPE Pipe 6 Kg/sqcm |
| 149 | 140 mm Dia HDPE Pipe 6 Kg/sqcm |
| 150 | 160 mm Dia HDPE Pipe 6 Kg/sqcm |
| 151 | Item No 2:- 5% of cost of pipes shall be considered for cost of PVC/HDPE specials for estimate purpose only. |
| 152 | Item No 3:- Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete PN - 1.6 (Without by pass arrangement)Sluice valves 65mm Dia |
| 153 | Sluice valves 80 mm Dia |
| 154 | Sluice valves 100 mm Dia |
| 155 | Sluice valves 125 mm Dia |
| 156 | Sluice valves 150 mm Dia |
| 157 | Item No 4:- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Earth Soils |
| 158 | Item No 5:- Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.HMB |
| 159 | Item No 6:- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Soft Rock |
| 160 | Item No 7:- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc.omplete by all means Hard Rock |
| 161 | Item No 8:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. |
| 162 | Item No 9:- Lowering, Laying and Jointing H. D. P. E./M.D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II63 mm Dia HDPE Pipe 6 Kg/sqcm |
| 163 | 75 mm Dia HDPE Pipe 6 Kg/sqcm |
| 164 | 90 mm Dia HDPE Pipe 6 Kg/sqcm |
| 165 | 110 mm Dia HDPE Pipe 6 Kg/sqcm |
| 166 | 125 mm Dia HDPE Pipe 6 Kg/sqcm |
| 167 | 140 mm Dia HDPE Pipe 6 Kg/sqcm |
| 168 | 160 mm Dia HDPE Pipe 6 Kg/sqcm |
| 169 | Item No 10:- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)Sluice valves 65 mm Dia |
| 170 | Sluice Valve 80 mm Dia |
| 171 | Sluice valves 100 mm Dia |
| 172 | Sluice valves 125 mm Dia |
| 173 | Sluice valves 150 mm Dia |
| 174 | Item No 11:- Providing and laying in situ Cement Concrete of trap/ granite / quartzite /gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering,form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) |
| 175 | Item No 12:- Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.As above of 90 x 60 cm internal size and depth upto 1.2 M with precast R.C.C slab cover. |
| 176 | Item No 13:- Refillingthetrencheswithavailableexcavatedstuffwith soft materialfirst over pipeline andthen hardmaterial in 15cmlayerswithallleadsandliftsincluding consolidation, surcharging, etc. complete |
| 177 | Item No 14:- ProvidingandmakingHDPE/PVC pipeconsumer serviceconnectionondistributionmainbydrilling holes with suitable means, including all labour. HDPE/PVCpipeofrequiredlengthwithorwithout roadcrossingasdescribedbelowincluding saddle/clampsaddleofsuitablematerial---as directed by Engineer in charge.Withroadcrossing15mmserviceconnectionwith road crossing (without watermeter) |
| 178 | Withoutroadcrossing15mmserviceconnectionwith road crossing (without watermeter) |
| 179 | Item No 15:- Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position.63 mm Dia HDPE Pipe 6 Kg/sqcm |
| 180 | 75 mm Dia HDPE Pipe 6 Kg/sqcm |
| 181 | 90 mm Dia HDPE Pipe 6 Kg/sqcm |
| 182 | 110 mm Dia HDPE Pipe 6 Kg/sqcm |
| 183 | 125 mm Dia HDPE Pipe 6 Kg/sqcm |
| 184 | 140 mm Dia HDPE Pipe 6 Kg/sqcm |
| 185 | 160 mm Dia HDPE Pipe 6 Kg/sqcm |
| 186 | SUBWORK 8:- Misc Works (MSEB Charges)Providing & streching transmission line & making Additional electric load connection to Head works, including all charges as per MSEB rule |
| 187 | SUBWORK 9:- Trial Run (For 1 Month)Commissioning, running and maintaining the scheme to quantities, rated capacity, including manning necessary personnel such as operator, valveman, etc. as per requirements of the scheme and who should also administer chemical dose for a period of 1 month for individual scheme and for regional scheme, together with training of personnel spared by MJP / Local Body and handing over the scheme to Local Body after completion of the above period as directed by Engineer-in-charge.Note: Required chemicals to be supplied by Department free of cost and electricity bill will also be paid by the Department.For single village without WTPFor 1 Month 26244 x 01 MonthsTotal For 1 Months |
| 188 | Add 12% GST |
AI Tender Summary
Tender Timeline
Jul 11, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJul 25, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 26, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender