| 1 | CONSTRUCTION OF 50,000 LTR CAPACITY RCC ESR |
| 2 | Earth work in all kinds of soil in excavation of foundation with in 50m initial lead & 1.50m initial lift including rough dressing & breaking clods to max 5cm to 7 cm & layers not exceeding 0.30mtr. in depth & as per direction of Engineer-in charge. |
| 3 | 1st.depth of 1.5mtr. |
| 4 | 2nd.depth of 0.80mtr. |
| 5 | Supplying all materials, labour T&P for providing for filling the foundation and plinth with sand well watered and rammed including cost, lead & royalty of materials etc complete as per the direction of the Engineer-in-charge. |
| 6 | Supplying all labour T&P materials providing cement concrete (1:3:6) with 40mm CB H.G.metals including cost, lead & royalty of materialsetc. all complete as per directon of engineer-in-charge of the department.. |
| 7 | Supplying all materials, labour and T&P forproviding RCC work of M-25 grade with 20mm & down grade black hard granite crusher broken stone chips including hoisting & laying, including cost, lead and royalty of materials etc. all complete as per direction of Engineer-in-Charge of the Department.. |
| 8 | Below G.L |
| 9 | Groundt floor ( upto 3.00 mt. Ht) |
| 10 | First floor ( upto 6.00 mt. Ht) |
| 11 | Second floor ( upto 9.00 mt. Ht) |
| 12 | Third floor upto 12.00 mtr. ht. |
| 13 | Supplying all materials, labour and T&P forproviding RCC work of M-30 grade with 20mm & down grade black hard granite crusher broken stone chips including hoisting & laying, including cost, lead and royalty of materials etc. all complete as per direction of Engineer-in-Charge of the Department.. |
| 14 | Fourth floor above 12.00 mtr. ht. |
| 15 | Supplying all materials, labour and T&P for cutting, bending, bindingand straighteining the rod and placing them in position including cost of binding wire of 18 to 20 gauge all complete including cost of MS tor rods of HYSD Fe 500grade and as per direction of Engineer-in-charge. |
| 16 | Supplying all labour T & P & materials providing Rigid & smooth Centering & Shuttering for RCC Works including false work & dismantlingthem after casting including cost ofmaterials complete in ground floor as per direction of Engineer-in charge. |
| 17 | Ground floor upto 3.00 mtr. |
| 18 | Column & Beam |
| 19 | slab & Chajja |
| 20 | Stair |
| 21 | First floor ( upto 6.00 mt. Ht) |
| 22 | Column & Beam |
| 23 | slab & Chajja |
| 24 | Stair |
| 25 | Second floor ( upto 9.00 mt. Ht) |
| 26 | Column & Beam |
| 27 | slab & Chajja |
| 28 | Stair |
| 29 | Third floor upto 12.00 mtr. ht. |
| 30 | Column & Beam |
| 31 | slab & Chajja |
| 32 | Stair |
| 33 | fourth floorabove 12.00upto 15.00 mtr. ht. |
| 34 | slab (Shell Roof) |
| 35 | Providing form work for concrete with F 2 finish for all permanently exposed surfaces not prominently nexposed to public view such as in bucket,ogeepiernoses & other curved surfaces with steel shuttering plastering including supply of rigid tie and supports with all labour ,materials and T &P complete including finish ing complete asdirected by Engineer in charge. |
| 36 | Column & Beam |
| 37 | fifthfloorabove15.00 mtr. ht. |
| 38 | Top slab (Shell Roof) |
| 39 | Wall |
| 40 | Supplying all materials, labour and T&P for providingplastic emulsion painting two coat over plastered surface including cost, lead and royalty of all materialsetc. complete as per the direction of the Engineer-in-charge. |
| 41 | Supplying and fixing of80 MM CI puddle collars including cost, all taxes, levies etc. complete as per the direction of the Engineer-in-charge |
| 42 | Supplying all materials, labour and T&P for providing 600 x 600 mm dia C.I.man hole cover2 (Two)nos of 600mm dia including cost, all taxes, levies etc. complete as per the direction of the Engineer-in-charge |
| 43 | Supplying all materials, labour T & P forfitting & fixing of Lighting Arrester of Copper on the roof of the Tank (OGR/ESR) as per IS 2309 with suitable earthed with alluminium tape (flat) conductor etc. all complete as per direction of Engineer- in charge. |
| 44 | Supplying all materials, labour T & Pfor fitting & fixing of Mechanical float with water level indicator etc. all complete as per direction of Engineer- in charge. |
| 45 | Supplying all materials, labour T & P forfitting & fixing of Alluminium ladder inside the containerfor approch to the flooretc. all complete as per direction of Engineer- in charge. |
| 46 | Transporting and supplying all materials, labour and T & P for fabrication, fitting and fixing ofG.I Fittings /Specialsat the required site using electic resistence welded G.I. pipes of medium quality and standard weight of reputed make ( TATA/ BANSAL/ZINDAL/SAIL) confirming to IS 1239 (P-1) 2004including cutting the pipes and flanges, drilling the bolt holes matching the pipes, flanges and jointing with proper gradient and alignment, welding with using eloctrodes, fitting, fixing using Gas cutter (Oxyacetelene gas set), welding machine and other consumablesetc. complete as per direction of Engineer in charge for use inconnection with fitting ad fixing of 32mm G.I.Pipe Handrails to the OGR/ESR as detailed as below |
| 47 | 32mm G.I. Pipe(Medium) |
| 48 | Cutting 32mm G.I pipe(circumferentially) |
| 49 | welding of 32 mmG.I.Pipe |
| 50 | Transporting of G.I .Pipe |
| 51 | Transporting and supplying all materials, labour and T & P for fabrication, fitting and fixing ofG.I Fittings /Specialsat the required site using electic resistence welded G.I. pipes of medium quality and standard weight of reputed make ( TATA/ BANSAL/ZINDAL/SAIL) confirming to IS 1239 (P-1) 2004including cutting the pipes and flanges, drilling the bolt holes matching the pipes, flanges and jointing with proper gradient and alignment, welding with using eloctrodes, fitting, fixing using Gas cutter (Oxyacetelene gas set), welding machine and other consumablesetc. complete as per direction of Engineer in charge for use inconnection with water tank, the cross drainage work, lowering of pumps etc. as per direction of Engineer in Charge. as follows:- |
| 52 | 80 mm G.I. pipe with double ended flange 6.0mtr.long. |
| 53 | G.I.80mm x900 bend(0.30x0.30mtr.) with double ended flange. |
| 54 | Supplying all labour T&p for providing |
| 55 | 16mmx60mm long nut&bolt |
| 56 | Rubber Insertion |
| 57 | Supplying all materials, labour and T&P for providing 80mm dia D/f Sluice valve for water works including cost conveyance |
| 58 | Supply all labour T&P for construction of brick masonry sluice valve chamber and N.R valve chamber of inside dimesion. (0.9 x 0.9 x 1.2mtr) as spicification drawing. |