Survey, Investigation, Design And Construction Of Jjm Newpiped Water Supply Scheme Under Jal Jeevan Mission At Village 1.Baniyator 2.Silha 3.Najarpur 4.Palaychha Block Bhitarwar Distt.Gwalior Based On T.W Including Installation Of Electric Submersible W
Tender Overview
Project Description
Survey, Investigation, Design And Construction Of Jjm Newpiped Water Supply Scheme Under Jal Jeevan Mission At Village 1.Baniyator 2.Silha 3.Najarpur 4.Palaychha Block Bhitarwar Distt.Gwalior Based On T.W Including Installation Of Electric Submersible Water Motor Pump, Construction Ofr.C.C Sump Well Cum Pump House, Construction Of R.C.C. Oht Staging, Laying & Jointing Of Rising Main, Feeder Main And Distribution Pipe Line System, Household Tap Connections, Construction Of Pump Houseand Electric Power Connections At Tube Well And Sump Well Including Cost Of All Material & Labour With90 Days Trial Run / Commissioning Period
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-Jul-2022 | correndum | Technical Bid | 27-Jul-2022 |
| 2 | 25-Jul-2022 | correndum2 | Technical Bid | 27-Jul-2022 |
| 3 | 29-Jul-2022 | correndum | Date | 03-Aug-2022 |
| 4 | 04-Aug-2022 | correndum2 | Date | 08-Aug-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Survey, Investigation, Design and Construction of JJM NEWPiped Water Supply Scheme under Jal Jeevan Mission at Village 1.Baniyator 2.Silha 3.Najarpur 4.Palaychha Block BHITARWAR Distt.Gwalior based on T.W including installation of electric submersible water motor pump, construction ofR.C.C Sump well cum pump house, construction of R.C.C. OHT staging, laying & jointing of rising main, feeder main and distribution pipe line system, household tap connections, construction of pump houseand electric power connections at tube well and sump well including cost of all material & labour with90 Days Trial Run/Commissioning period |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender