Deepening And Improvements To The Ooranies_ 3Nos. In Agamt-Ii-2021-22 Village Panchayats Of Vadipatti Block In Madurai District In Package No.Vad_01
Tender Overview
Project Description
Deepening And Improvements To The Ooranies_ 3Nos. In Agamt-Ii-2021-22 Village Panchayats Of Vadipatti Block In Madurai District In Package No.Vad_01
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 14-Jul-2022 | TENDER DATE POSTPONED | Date | 20-Jul-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Name of Work: Construction of WeIr keelamattiyan Kanmoi @ Keelamattiyan Village in Melakkal Panchayat |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 3 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete |
| 4 | Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete. |
| 5 | Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete. |
| 6 | C.C. 1:3:6-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete |
| 7 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. |
| 8 | R.Cement concrete 1:11/2:3 mix using 20 mmHBGSmetal inculding cost and coveyance of all materials to site includinglabour for mixing ,laying,curing etc complete., |
| 9 | C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete |
| 10 | Provision for Name board charges |
| 11 | Name of Work: Deepening of Pudukulam oorani with Retainingwall @ Balakrishnapuram village in Irumbadi Panchayat |
| 12 | Cleaning heavy jungle(based on standard schedule of rates vid., S.no 1 Item no.1) |
| 13 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 54 Item no.1) |
| 14 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 15 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete |
| 16 | Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete. |
| 17 | C.C. 1:3:6-using 40mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete |
| 18 | Provision for Name board charges |
| 19 | Cleaning heavy jungle(based on standard schedule of rates vid., S.no 1 Item no.1) |
| 20 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 54 Item no.1) |
| 21 | Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete(based on standard schedule of rates vid., S.no 59 Item no.3) |
| 22 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete |
| 23 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete |
| 24 | Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete. |
| 25 | C.C. 1:3:6-using 40mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete |
| 26 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 27 | Provision for Name board charges |
| 28 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender