| 1 | M-150 Brick Work in 1:4 (one cement & Four coarse sand of 1.25F.M. Mortar) in Foundation & Plinth including supply of all materials , labour & T& P etc. Required for proper completion of work .SI no 307(a) |
| 2 | 12 mm thick plaster with 1:4 cement and coarse sand including supply of all materials labour and completion of work .S.I. No. 584 |
| 3 | R.C.C. Work with cement ,approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement and its bending , but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials , labour, Tools & plants etc. required for proper completion of the work binding wire of supplied by the contractor free of cost .but for slab.S.I.No.284 |
| 4 | Mild Steel or ironin Plain work such as Reinforcement concreteOr Reinforcement Brick Work brought to required shape as necessaryincluding bending for proper completion of all steel.S.I.No.504 |
| 5 | cement concrete with 2cm gauge approved stone grit instead of 4cm gauge stone ballast, coarse sand & cementin the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc. Required for proper completion of the work. |
| 6 | Concrete with 4 cm. Gauge brick ballast , fine sand of 1.25 F:M.and cement , in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour , tools & plants etc. Required for proper completion of the work.S.I.No.273 |
| 7 | cement concrete with 2cm gauge approved stone grit , coarse sand & cementin the proportion of 1:1.5:3 in cc pavement (thickness as per design ) cement coarce &fine aggregate confirming to IS standard mixed in concrete mixture / plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design , laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film wedges , steel plates including leveling the form work spreading the concrete with shovels , rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified ) and water finishing to lines & grade including supply of all material , labour, tools& plants etc. requiredfor proper completion of the work and also including complete shifting of recron 3S fibre reinforcement material etc & concrete etc. NEW ITEM 3( p.no 49) |
| 8 | Earth work in filling in ordinary soil from out site 3 km . Distance all complete work |
| 9 | Mild steel or iron workin heavy sizes such as trusses ,built up gates, door, frames, record racks, roof work, gates etc. Wrought to required form including drilling holes, rivetting or welding necessary, and also including supply of steel, bolts and nuts S.I.No.503 |
| 10 | GST 12% |