Tender For The Reputed Agencies/Contactor For The Work Of Replacement And Upgradation Of Ahus Installed At Convention Centre Nimhans -1. Supply, Installation, testing and commissioning of Floor Mounted Double skin AHU with 48 mm profile insulated panel. 0.6 mm polyester pre coated galvanized steel sheet with EU-4 Grade filter Grade filter with dehumidifier heaters strips to maintain RH of 40% to 70% with inbuilt Humidistats, 63.0 TR Total Capacity, Supply Air Quantity 25000 CFM - 60mm ESP, with 15 kw motor based on Return air conditions: 24 Deg. C / 55 % with Pre filters. Stainless steel tray, AHU unit with PLUG FAN. etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc.,Make :ZECO/LUFTEK 2. Supply, Installation, testing and commissioning of Floor Mounted Double skin AHU with 48 mm profile insulated panel. 0.6 mm polyester pre coated galvanized steel sheet with EU-4 Grade filter Grade filter with dehumidifier heaters strips to maintain RH of 40% to 70% with inbuilt Humidistats.38.0 TR Total Capacity, Supply Air Quantity 15000 CFM - 60mm ESP, with 15 kw motor based on Return air conditions: 24 Deg. C / 55 % with Pre filters. Stainless steel tray, AHU unit with PLUG FAN.AHU unit with PLUG FAN etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading, un loading lead lift transportation charges and GST etc., Make :ZECO/LUFTEK 3. Supply, Installation, testing and commissioning of Floor Mounted Double skin AHU with 48 mm profile insulated panel. 0.6 mm polyster pre coated galvanized steel sheet with EU-4Grade Grade filter with dehumidifier heaters strips to maintain RH of 40% to 70% with inbuilt Humidistats. 30.0 TR Total Capacity, Supply Air Quantity 12000 CFM - 60mm ESP, with 10 kw motor based on Return air conditions: 24 Deg. C / 55 % with Pre filters. Stainless steel tray, AHU unit with PLUG FAN etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc.,Make :ZECO/LUFTEK 4. Supply, Installation, testing and commissioning of Floor Mounted Double skin AHU with 48 mm profile insulated panel. 0.6 mm polyster pre coated galvanized steel sheet with EU-4Grade filter with dehumidifier heaters strips to maintain RH of 40% to 70% with inbuilt Humidistats. 52.0 TR Total Capacity, Supply Air Quantity 21000 CFM - 60mm ESP, with 20 kw motor based on Return air conditions: 24 Deg. C / 55 % with Pre filters. Stainless steel tray, AHU unit with PLUG FAN.AHU unit with PLUG FAN etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc.,Make :ZECO/LUFTEK 5. Supply, Installation, testing and commissioning of Floor Mounted Double skin AHU with 48 mm profile insulated panel. 0.6 mm polyster pre coated galvanized steel sheet with EU -4 Grade filter with dehumidifier heaters strips to maintain RH of 40% to 70% with inbuilt Humidistats. 33.0 TR Total Capacity, Supply Air Quantity 13000 CFM - 60mm ESP, with 10 kw motor based on Return air conditions: 24 Deg. C / 55 % with Pre filters. Stainless steel tray, AHU unit with PLUG FAN.AHU unit with PLUG FAN etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc., Make :ZECO/LUFTEK 6. Supply, installation, testing and commissioning of floor mounted double skin AHU with 48mm profile insulated panel. 0.6mm polyster pre coated galvanized steel sheet with EU-4 Grade Grade filter with dehumidifier heaters strips to maintain RH of 40% to 70% with inbuilt Humidistats 15.0 TR total Capacity, supply air quantity 6000 CFM- 60mm ESP, with 10kw motor based on return air conditions:24 Deg.C/55% with pre filters. stainless steel tray, AHU unit with PLUG FAN Make :ZECO/LUFTEK 7. Supply, Installation, testing and commissioning of VFD panel for AHUs by pass control in case of star delta failure. The same can be bypassed and run the systems. Make DANFOSS VFD’s make etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc., 3 8. Existing AHU unit dismantling and shifting to specified place etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading, unloading lead lift transportation charges and GST etc., 9. New AHU supply and fixing of canvass connections etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc., 10. AHU mouth ducting connection to suit existing duct with 13 mm accoustic insulations etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc., 11. Existing AHU room ducts and pleanum cleaning before duct modifications and duct connections etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc., 12. After testing and commissioning of AHU’s air balancing to be done with HOOD and need to submit designed CFM report and temperature etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , unloading lead lift transportation charges and GST etc., 13. Replacing of AHU drain line with insulation etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , unloading lead lift transportation charges and GST etc., 14. Electrical cable work connected to AHU, VFD Panel etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , unloading lead lift transportation charges and GST etc., 15. Supply of 2/3 way Actuator with Thermostat make SEIMENS/HONEWELL as per site conditions etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , unloading lead lift transportation charges and GST etc. 16. Installation actuator with flange to suit existing chill water pipe line, Insulation of the same with nitrile rubber and aluminum gladding etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , unloading lead lift transportation charges and GST etc., 17. Existing electrical panel dismantling and fixing new VFD panel with necessary cables with terminations etc., complete as per direction of the Engineer in - charge of work including cost of all materials, labour charges, loading , un loading lead lift transportation charges and GST etc., 18. Providing 165 mm dia butterfly valves of PN 10 rating with extended stem with companion flanges and insulation as above etc., complete as per direction of the Engineer- incharge of work including cost of all materials, labour charges, loading ,unloading ,lead lift , transportation charge and GST etc., 19. Providing pressure test points etc., complete as per direction of the Engineer-in- charge of work including cost of all materials, labour charges, loading ,unloading, lead lift, transportation charge and GST etc., 20. Providing thermo meters etc., complete as per direction of the Engineer-in- charge of work including cost of all materials, labour charges, loading ,unloading, lead lift, transportation charge and GST etc., 21. Providing MS structural platform/civil works for AHUs as per site conditions etc., complete as per the direction of the Engineer-in- charge of work including cost of all materials, labour charges, loading, unloading, lead lift, transportation charge and GST etc., 22. Supply and instalation of pressure gauges with ball valves etc., complete as per the direction of Engineer-in-charge of work including cost of all materials, labour charges, loading unloading, lead lift, transportation charge sand GST etc., 23. Supply and fixing A.H.U piping with insulation F.R.P lining etc., complete as per the direction of Engineer-in-charge of work including cost of all materials, labour charges, loading unloading, lead lift, transportation charge sand GST etc., 24. Providing A.H.U welding work for all 8 A.H.U’s etc., complete as per the direction of Engineer-in-charge of work including cost of all materials, labour charges, loading unloading, lead lift, transportation charge sand GST etc., Grand Total (A) 1. By Back of Dismantled materials such as AHU’s, fitters, Channels, pipes etc as per the direction of Engineer-in-charge of work including cost of all materials, labour charges, loading unloading, lead lift, transportation charge sand GST etc.,