Construction Of Water Tanki At Primary School Sounthan Pyt Sounthan Block Udhampur Boq
Tender Value
1 Lakhs
Estimated cost
Bid Submission
08 Jul 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
udhampur → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Water Tanki At Primary School Sounthan Pyt Sounthan Block Udhampur Boq
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:including all kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Dumping stone excluding cost of stones.in Horizontal on level |
| 5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:Cement mortar 1:6 ( 1 cement : 6 coarse sand |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms |
| 10 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 11 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer |
| 12 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand |
| 13 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 14 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate |
| 15 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 16 | Providing Pipes, tap etc. |
| 17 | Placing and fixingCIB at site of size 5ft X 3 ft x 0.75ft including painting and writing complete job |
| 18 | Carriage of cement 5km (avg.) by MT |
| 19 | Carriage of sand 55km (avg.) by MT |
| 20 | Carriage of Aggregate 13km (avg.) by MT |
| 21 | Carriage of Bricks 80km (avg.) by MT |
| 22 | Carriage of stone 13km (avg.) by HL/AT |
AI Tender Summary
Tender Timeline
Jul 02, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJul 08, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 09, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender