Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Creation Of 630 Kva Sub Station At Ice Factory Omara ( Stp-2 ) Under Nrcp ( Goi ) In District Udhampur On Tunkey Basis.-2 9 Mtr. Long St Pole ( St-410 Sp-33 ) 3 120 Mm² Ab ( Ht ) Cable ( 3X120+ 1X95mm² ) ( With Earthing ) 4 Heat Shrinkable Outdoor Cable Termination Kit 5 Suspension / Tension Clamp With Eye Hook 6 Galvinized Nuts And Bolts. 7 Danger Plates With Clamps 8 Anti-Climbing Device With Clamps 9 Earthing Complete Bygi Rod 20 Mm, 2.5 Mtr Long Through G.I. Strip 25X3 Mm 10 Painting Of 9 Mtr St Poleswith One Coat Of Red Oxide Paint. 11 Painting Of 9 Mtr St Poleswith Two Coat Of Aluminium Paint. 12 Cement Bottoming 1:2:4 Mix As Per Rec Standards, 0.5 Cum / Pole 13 Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Creation Of 630 Kva Sub Station At Ice Factory Omara ( Stp-2 ) Under Nrcp ( Goi ) 14 11 / 0.433Kv, 3-Phase 630 Kva Distribution Transformer With Bimetallic Terminal Connectors Energy Level-2, Copper Wound, And With Lv Cable Box Havingdetachable Aluminium Gland Plate 15 Gapless Surge Arrestor 9Kv, 10Ka, La With Polymer Housing Station Type 16 11Kv Go, Ab Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type 17 11 Kv Horn Gapfuse Set 3 Phase 200A 18 400 Mm² Single Core Cable, 1.1Kv Grade, Pvc Insulated Alumnium Stranded Conductor Frls Type 19 9 Mtr. Long St Pole ( St-410 Sp33 ) 20 11Kv Disc Insulators ( Polymeric 45Kn ) Creepage Distance 320 Mm With Tension Fittings 21 11Kv Pin Insulator ( Polymeric ) With Pins ( 12Kv, 5Kn ) Creepage Distance 320Mm 22 Gi Channel / Angle / Flat Of Sizes Including Clamps 23 Galvinized Nuts And Bolts. 24 Lt Distribution Box For 630 Kva Dtr With Mccb For Incomer And SfuS For Outgoing Circuits. 25 Cement Bottoming Of St Poles In 1:2:4 Mix As Per Rec Standards, 0.5 Cum Per Pole 26 Painting Of Sub Station With One Coat Of Red Oxide And Two Coats Of Aluminium Paint 27 Danger Plates With Clamps 28 Gi Barbed Wire For Anti Climbing 29 Earthing Of Substation --Excavation Of Earth Pit Of Dia 650 Mm & Depth 3000 Mm, Installation Of Earthing Pipe Of 40 Mm Nominal Bore & 4Mm Wall Thickness & Length 2.5 Mtr Long As Per Is 1239. Gi Strip For Neutral Earthing Of Size 50 Mm X 6 Mm & 32Mm X 3Mm For Connection Of Transformer Body, G.O Set & Lightening Arrestor As Per Is 2629 / 85, Gi Nuts & Bolts, Refilled With Earth Enhancement Materials And Earth Chamber With Rcc Slab Cover. 30 Galvanised Stay Set With 50X8mm Stay Clamp, Guy Insulator ( 2Nos. ) , Anchor Plate ( 200X 200 X 6 Mm ) , Nut-Bolts, 2 Nos Turn-Buckles, 1.8M Long, 16 Mm Diameter Solid Gs Stay Rod & 7 / 3.15 Mm Dia Gi Stranded Wire Complete 31 Wedge Connectors / Pg Clamp 32 3 Phase 4 Wire Trivector Meter With Ct Pt Unit 33 Transformer Pad / G.I Channel 34 Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Erection Of 2 No. 11 Kv Tapping Point / Isolation Point At Mid Span For Creation Of 630 Kva Sub Station At Ice Factory Omara ( Stp-2 ) . 35 9 Mtr. Long St Pole ( St-410 Sp-33 ) 36 Gi V Cross -Arm With Top Bracket Including Clamps 37 Gi Channel X-Arm Including Clamps And Angle For Braces 38 11 Kv Go, Ab Switch 3 Phase, 3 Pole, 200 Amp, Vertical Type. 39 50Mm² Acsr Rabbit Conductor 40 Pg Clamps For 50Mm²acsr Conductor 41 11Kv Disc Insulators ( Polymeric 45Kn ) Creepage Distance 320 Mm With Tension Fittings 42 11Kv Pin Insulator ( Polymeric ) With Pins ( 12Kv, 5Kn ) Creepage Distance 320Mm 43 Galvanized Nuts And Bolts 44 Painting Of 8 Mtr St Poles With One Coat Of Red Oxide Paint. 45 Painting Of 8 Mtr St Poles With Two Coat Of Aluminium Paint. 46 Danger Plates With Clamps 47 Anti-Climbing Device With Clamps 48 Cement Bottoming 1:2:4 Mix As Per Rec Standards, 0.5 Cum / Pole 49 Earthing Complete Bygi Rod 20 Mm, 2.5 Mtr Long Through G.I. Strip 25X3 Mm 50 Galvanised Stay Set With 50X8mm Stay Clamp, Guy Insulator ( 2Nos. ) , Anchor Plate ( 200X 200 X 6 Mm ) , Nut-Bolts, 2 Nos Turn-Buckles, 1.8M Long, 16 Mm Diameter Solid Gs Stay Rod & 7 / 3.15 Mm Dia Gi Stranded Wire Complete 51 Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Improvement Of Sheetla Mandir Feeder For Creation Of 630 Kva Sub Station At Ice Factory Omara ( Stp-2 ) 52 11 Mtr. Long St Pole ( St-410 Sp-56 ) 53 Gi Channel X-Arm Including Clamps And Braces 54 100 Mm Sq. Acsr Conductor Dog 55 Pg Clamps For 100Mm²acsr Conductor 56 11Kv Disc Insulators ( Polymeric 45Kn ) Creepage Distance 320 Mm With Tension Fittings 57 11Kv Pin Insulator ( Polymeric ) With Pins ( 12Kv, 5Kn ) Creepage Distance 320Mm 58 Galvanized Nuts And Bolts 59 Danger Plates With Clamps 60 Anti-Climbing Device With Clamps 61 Earthing Complete Bygi Rod 20 Mm, 2.5 Mtr Long Through G.I. Strip 25X3 Mm 62 Painting Of 11 Mtr St Poleswith One Coat Of Red Oxide Paint. 63 Painting Of 11 Mtr St Poles With Two Coat Of Aluminium Paint. 64 Cement Bottoming 1:2:4 Mix As Per Rec Standards, 0.5 Cum / Pole 65 Galvanised Stay Set With 50X8mm Stay Clamp, Guy Insulator ( 2Nos ) , Anchor Plate ( 200X 200 X 6 Mm ) , Nut-Bolts, 2 Nos Turn-Buckles, 1.8M Long, 16 Mm Diameter Solid Gs Stay Rod & 7 / 3.15 Mm Dia Gi Stranded Wire Complete