Indian Navy-IN has published Development Of Qty 18 Brake Inner Tube , ( Development Charges From Sl 1.1 To Sl 1.6 ) 1.1 Generation Of Technical Specificatons , Generation Of Engineering Drawings , Development Of Tooling / Dies Fixtures , Qualification Testing Charges , Overhe. Submission Date for this Tender is 11-08-2022. Machine Tools Tenders in dabolim Goa. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 28-Jul-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 04-08-2022 |
2 | 04-Aug-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 11-08-2022 |
Sl. No. | Item Description |
1 | (DEVELOPMENT CHARGES From Sl 1.1 to Sl 1.6) 1.1 Generation of Technical Specificatons |
2 | Generation of engineering drawings |
3 | Development of tooling/ dies fixtures |
4 | Qualification Testing charges |
5 | Overhead expenditure for development activity(if any) |
6 | Profit Margin for Development activities |
7 | (PROTOTYPE DEVELOPMENT COST FROM SLS 2.1 TO 2.7)2.1 Cost of Material |
8 | Design of prototype sample |
9 | Scrap Coverage for prototype sample only |
10 | Labour Charges for prototype sample only |
11 | Inhouse testing charges for prototype sample (if any) |
12 | Qualification Testing charges for prototype sample |
13 | Packing/Transport/Forwarding Charges for Prototype (END OF PROTOTYPE SAMPLE COSTING) |
14 | (BULK SUPPLY COST BREAKUP FROM SLS 3.1 TO 3.5) 3.1 Cost of Material |
15 | Total Manufacturing Cost of Bulk Samples |
16 | Testing Charges for Bulk ( if any) |
17 | Packing/Transport/Forwarding Charges for Bulk |
18 | Profit Margin for Bulk Supply (END OF BULK COSTING) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail