Upgradation And Commissioning After Conversion Of Existing 5.0 Mld Capacity Sewage Treatment Plant Based On Moving Bed Biological Reactor Technology To Combined Activated Sludge Process In Conjunction With Mbbr Bio Film Process With Addition Of Anoxic Tan
Tender Overview
Project Description
Upgradation And Commissioning After Conversion Of Existing 5.0 Mld Capacity Sewage Treatment Plant Based On Moving Bed Biological Reactor Technology To Combined Activated Sludge Process In Conjunction With Mbbr Bio Film Process With Addition Of Anoxic Tank, Individual Internal Recirculation Pumps, Return Activated Sludge Pumps, Aeration Tank, Treated Effluent Lifting Pumps In Tertiary Treatment Plant Based On Disc Filters Followed By Chlorination In Exist
BOQ
| Sl. No. | Item Description |
| 1 | Works Details |
| 2 | Up gradation and commissioning after conversion of existing 5.0 MLD capacity sewage treatment Plant based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of Anoxic Tank, Individual Internal Recirculation Pumps, Return activated sludge pumps, Aeration Tank, Treated Effluent Lifting Pumpsin Tertiary Treatment Plant based on Dual Media filters followed by Chlorination in existing STP complete in all respect with PLC, data transfer through modem to website and all other works contingent there to including Operation and Maintenance of existing STP/MPS during up- gradation period and 3 months of trial run period, 12 months defects liability period after and 5 years thereafter on the commissioning of up-graded STP i.e. completion of Tertiary treatment plant at Bawani Khera Road, Hansi, District-HisarEntire Civil Works as per DNIT and existingstructures any other work contingent thereto (As per detail attached and inclusive of O & M |
| 3 | Entire mechanical works as per DNITExisting mechanical equipment any other works contingent thereto (As per detail attached andinclusive of O & M) |
| 4 | Entire Electrical & instrumentation works as per DNIT and existing electrical and instrumentation equipment any other work contingent thereto (Asper detail attached and inclusive of O & M) |
| 5 | Guaranteed closure period of existingSTPs (Amount to be loaded for recovery ifdelayed beyond guaranteed closure period) |
| 6 | Guaranteed completion period for the Up- gradation as per DNIT. (Amount to be loaded for recovery if delayed beyond guaranteedcompletion period) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender