| 1 | Compaction of Earthwork:- Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (in case of link roads earthwork to be done by villagers. |
| 2 | Construction of Embankment with Material obtained from Borrow pits:- Construction of Embankment with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. |
| 3 | Granular Sub-Base (Mix in place):- Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications |
| 4 | Wet Mix Macadam:- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base /base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications. |
| 5 | Prime Coat @ 0.85kg per sqm:- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications. |
| 6 | Tack Coat:- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications. |
| 7 | Bituminous Macadam 50 to 75 mm thickness (grading II) with batch type hot mix p lant 100 · 120 TPH Providing and laying bituminous macadam 50-75mm thick with Batch type hot mix plant 100-120TPH using crushed aggregates of specifiedgrading premixed with bituminous binder VG -30 @3.4% transported to site, laid over apreviously prepared surface with paver finisherto the required grade, level and alignment androlled as per clauses 501.6 and 501. 7 to achievethe desired compaction complete as pertechnical clause 504 of MORT&H specifications |
| 8 | Tack Coat:- Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications. |
| 9 | Bituminous Concrete with Batch type HMP:- Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP:- Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications. |
| 10 | Cast in Situ Cement Concrete M20 Kerb:- Cast in Situ Cement Concrete M 20 Kerb with Channel Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408. |
| 11 | Primer in cement surface:- Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer. |
| 12 | Synthetic Enamel Paint:- Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. |
| 13 | Thermo plastic Paint:- Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Note:- 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. |