| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :- |
| 2 | ST Pole 13/11 mtr. long |
| 3 | Line material MS channel 100X50X6 mm, MS angle 65X65X6 mm, pin insulator, disc insulator, stay set, stay wire, earth rod, GI wire, dog conductor, x-arms etc. |
| 4 | 11 KV XLPE cable 3x120 sq.mm |
| 5 | 11 KV Metering Cubical 15/5 Amp. |
| 6 | 11 KV CT/PT UNIT 15/5 Amp. |
| 7 | 11 KV VCB O/G CTR 200/100/5 Amp. |
| 8 | Cartage of following material from JE, Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :- |
| 9 | ST Pole 13/11 mtr. long |
| 10 | Line material MS channel 100X50X6 mm, MS angle 65X65X6 mm, pin insulator, disc insulator, stay set, stay wire, earth rod, GI wire, dog conductor, x-arms etc. |
| 11 | 11 KV XLPE cable3x120 sq.mm |
| 12 | 11 KV Metering Cubical 15/5 Amp. |
| 13 | 11 KV CT/PT UNIT 15/5 Amp. |
| 14 | 11 KV VCB O/G CTR 200/100/5 Amp. |
| 15 | Erection of Double pole on STP pole 11/13 mtr after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work. |
| 16 | Erection of Single support on STP pole 11/13 mtr after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work. |
| 17 | Erection of stay rod complete after digging a pit of size 1.20 x0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 18 | Laying lifting stringing of proper sagging of Dog conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly. |
| 19 | Digging of cable trench of size 1.5x3\" |
| 20 | Laying of 11 KV XLPE Cable under ground by providing of first class bricks and sand |
| 21 | Trench less boring |
| 22 | Providing and fixing of HDPE Pipe 6\" Dia |
| 23 | Providing and fixing of GI Pipe 6\" Dia for DP Riser |
| 24 | Fixing of 11 KV accessories on single support pole |
| 25 | Tree cutting and chopping of tree branches near/under 11 KV line |
| 26 | Gaurding of 11 kv line |
| 27 | Water level earthing of metering cubical and 11 KV VCB |
| 28 | Grouting of 11 KV VCB and Metering Cubical |
| 29 | Providing and fixing of Holding Clamp for STP Pole |
| 30 | Providing and fixing of Stay Clamp |
| 31 | Providing and fixing of MS Nuts& Bolts off size |
| 32 | Mounting of CT/PT unit on double pole |
| 33 | Providing and fixing of Pin Clamp |
| 34 | Grouting ofSTP pole 11/13 mtr. Long |
| 35 | Filling of cable jointing kit |