| 1 | TighteningofEPDMscrewsinGIprofilesheetroofingincludingfixingof missingscrews,arrestingroofleakagebyprovidingandapplyingsealant compound/GIwashersandotherroofleakingarrestingmaterialswherever requiredoverEPDMscrewsincludingprovidingsafetymeasuresforthe labourerstoworkathigherelevationviz.,ropesetc.,insurancecoveragefor labourers and hiring of required T&P etc complete. |
| 2 | Tightening of GI J or L hooks in AC sheet/ GI sheet roofing including removal of clotted bitumastic compound wherever necessary, arresting roof leakage by providing and applying bitumastic compound of approved brand and bitumen/ GI washers and other roof leaking arresting materials wherever required over J bolts including providing safety measures for the labourers to work at higher elevation viz., ropes etc., insurance coverage for labourers and hiring of required T&P complete. |
| 3 | Providing andlaying tarfelt/ plastic felt/ bitumen felt sheet with Shalibond CS over AC sheet roofing wherever necessary including providing and applying Shalibond CS & Bitumen felt :Type 3 grade 1 of approved brand wherever required over roof including providing necessary safety measures for the labourers to work at higher elevation, ropes etc., insurance coverage for labourers and hiring of requiring T&P complete. |
| 4 | Cleaningofservicewaterdrainsaroundgodowninalldepthsandwidth including removal of debris/ rubbish and disposal of the same in all leads and lifts, filling in low lying areas and levelling complete in the depot premesis as directedbytheEngineer-in-Chargeandthedraintobekeptcleanduringthe period of monsoon. |
| 5 | Servicing to the rolling shutters including cleaning the side guides, springs and shaftetc.,withkeroseneoil,providingandapplyingfreashgrease,applying tensiontothesprings,replacingdamagedpartsandweldinglockingplates, stoppers etc., wherever necessary etc. complete as directed by the Engineer-in- charge.(Rolling shutter parts like lathes, springs etc. will be supplied at free of cost) |
| 6 | Servicing to the sliding monkey grills including cleaning the side guides and top L angular sections etc.,withkeroseneoil,providingandapplyingfreashgrease,replacingdamagedpartsetc., wherever necessary etc. complete as directed by the Engineer-in- charge.(Sliding monkey grills parts like bolts etc. will be supplied at free of cost) |
| 7 | Supplyingrollingshutterspringsof27.5cm longwirespringgradeno.2for rolling shutters etc. complete as directed by Engineer-in-charge. |
| 8 | Supplying of 80x1.25mm machine rolled lathes/ bottom plates arrangement for inside and outside locking with push and pull operation etc.completeof required thickness etc. for rolling shutters as directed by Engineer-in-charge. |
| 9 | Providing and fixing ball bearing for rolling shutters. |
| 10 | Providing and replacing 6 mm thick corrugated AC sheets in roofing including dismantling broken AC sheet upto any pitch and fixing with polymer coatedJ or L hooks bolts and nuts 8 mm dia GI plain and bitumen washers etc. complete as per directions of Engineer-in-charge (excluding the cost of purlins, rafters and trusses) including cutting sheets to size and shape wherever required. |
| 11 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : Ridges plain (500 - 600mm) |
| 12 | Renewing glass panes, with putty and nails wherever necessary including racking out the old putty:Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm) |
| 13 | Cleaning of under ground sump, Over Head R.C.C. Tank ( independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i) Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge. |
| 14 | Supply of services of semi-skilled labour like carpenter, sewer man, plumber etc. on daily rate basis for day-to-day maintenance atleast weekly once as per direction of Engineer-in-charge. |
| 15 | Supply of services oflabour like beldar, coolie,helper etc. on daily rate basis for day-to-day maintenance atleast weekly once as per direction of Engineer-in-charge. |
| 16 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 17 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.25 mm nominal outer dia Pipes. |
| 18 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.20 mm nominal outer dia Pipes. |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 20 | Lettering with black Japan paint of approved brand and manufacture. |
| 21 | Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works |
| 22 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work |
| 23 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 24 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge |
| 25 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform |
| 26 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Cold twisted bars |
| 27 | Reinforced cement concrete work in beams, suspended floors, roofshaving slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarsesand(zone-III) derived from natural sources : 3 graded stone aggregate20 mm nominal size derived from natural sources). |
| 28 | 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand). |
| 29 | Neat cement punning. |
| 30 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand). |
| 31 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) |
| 32 | White washing with lime to give an even shade :Old work (two or more coats) |
| 33 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 34 | Fixing chowkhats in existing opening including embedding chowkhats in floors or walls cutting masonry for holdfasts, embedding hold fasts in cement concrete blocks of size 15 x 10 x 10 cm with cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), painting two coats of approved wood preservative to sides of chowkhats and making good the damages to walls and floors as required complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.Door chowkhats |
| 35 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1cement: 4 coarse sand) |
| 36 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes |
| 37 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 38 | Deduct towards cost of salvage value of dismantled materials received from specified items which shall be issued to contractor andshall be cleared by the cotractor from the site of workwith all leads and lifts complete as directed by the EIC as is where is basisfor removed steel items |
| 39 | Deduct towards cost of salvage value of dismantled materials received from specified items which shall be issued to contractor andshall be cleared by the cotractor from the site of workwith all leads and lifts complete as directed by the EIC as is where is basisfor dismantled AC sheet |