Augmentation Of Source, Pipeline, Cwr And Other Works Under Masi ( Naithana Devi ) Pumping Peyjal Scheme- 1 Providing Of All Materials, Carting To Site Of Work, Laying To True Alignment & Jointing Of Gi ( Medium ) Screwed Pipes Conforming To Latest Bis Code ( Including Supply Of All Jointing Materials Like Specials, White Lead, Hemp And Oil Etc. ) In Trenches With Its Cutting, Threading And Testing Of Pipe Line Etc. Complete For The Following Dia: 2 15 Mm 3 20 Mm 4 25 Mm 5 32 Mm 6 40 Mm 7 50Mm 8 65Mm 9 Excavation For Pipe Line Trenches 10 Excavation In Soil Mixed With Single Boulders Etc. Requiring The Use Of Specials T&P, If Any For Pipe Line Trenches Including Lift Up To 1.5 M And Lead Kup To 30 M With Back Filling, Watering, Ramming Of Excavated Earth In Trenches. 11 Same As Above But In Medium Rock By Chiseling. 12 Cartage Of Following Sizes Of Gate Valves Up To Site Of Work And Fixing The Same In Water Supply Lines Including Cost Of Valves, Specials, Labour And T&P Complete In All Respect But Excluding The Cost Of Earth Work And Construction Of Chamber . 13 20Mm 14 25Mm 15 32Mm 16 40Mm 17 50Mm 18 65Mm 19 Air Valves 20 20Mm 21 Supply Of All Materials, Labour, T & P Etc And Construction Of Wheel Valve / Water Meter Chamber As Per Type, Design 22 Supply Of All Materials, Labour, T & P Etc And Construction Of Air Valve Chamber As Per Type, Design 23 Supply Of All Materials, Labour, T&P Etc. And Construction Of Rcc Cwr Of Following Capacities ( In Kiloliters ) With M.S Ladder Outside & Inside Of The Tank, M.S. M.H. Cover With Locking Arrangement, Supply And Fixing Of Outlet, Inlet, Overflow And Wash Out Pipes With Necessary Sluice Valves, Pipe Pieces ( Including Cost Of Materials ) Flooring 0.60 Mwide Apron, Painting On Tank Body, Vertical Pipes, Ladder, M.S. M.H Cover Etf. Complete With Approved Water Proofing ( Apex ) / Enamal Paint, Testing, Filling Water For Testing Purpose Etc. Including Supply Of Vertical Pipes, Specials . 24 1Kl 25 2Kl 26 3Kl 27 4 Kl 28 5 Kl 29 7.5 Kl 30 10Kl 31 12.50Kl 32 15Kl 33 17.5Kl 34 20Kl 35 22Kl 36 25Kl 37 Making Ferrule Connection In The Existing Main Of G.I, A.C, Pvc Or Any Type Of Pressure Mains With Saddle Piece, Service Connections, Fittings And Fixing Of G.M. Ferrule Including Tapping The Main, Including All Materials, Ferrule, Clamp Etc. And Bib Cock.For Fhtc 38 Protection Work 39 Excavation In Foundation For Retaining, Breast Walls Etc, In All Types Of Soils And Rocks Including All Lead, Lift And Disposal Of Surplus Material As Per Direction Of Engineer - In - Charge 40 Concrete With Cement, Coarse Sand And 40 Mm Gauge Stone Ballast In Proportion 1:4:8 In Foundations And Floors Including Supply Of All Material, Labour And T&P Etc. Required For Proper Completion Of The Work. 41 Pcc Nominal Mix 1:2:4 ( Hand Mixed ) Plain / Reinforced Cement Concrete In Substructure Complete As Per Drawings And Technical Specification 42 Random Rubble Stone Masonry Laid In 1:6 Cement And Sand Mortar, In Breast Walls, Retaining Walls, Parapets, Scuppers, Etc. Including Supply Of All Material, Labour, T&P And Royaltiies Etc. 43 Randum Rubble Stone Masonry Laid Dry Including Supply Of All Materials, Labour, T&P Etc. Complete