}

Provision Of Tech And Otm Accn For Mh At Yol - 1 Lumpsum Price Worked Out By The Contractor For Building Work As Listed In Schedule A Part-I. 2 Lumpsum Price Worked Out By The Contractor For Internal Watersupply And Bath / Toilet / Kitchen Appliance, Kangra-Himachal Pradesh

Military Engineer Services-MES has published Provision Of Tech And Otm Accn For Mh At Yol - 1 Lumpsum Price Worked Out By The Contractor For Building Work As Listed In Schedule A Part-I. 2 Lumpsum Price Worked Out By The Contractor For Internal Watersupply And Bath / Toilet / Kitchen Appliance. Submission Date for this Tender is 29-10-2022. Kitchen Equipment Tenders in Kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32799806
Corrigendum : Provision Of Tech And Otm Accn For Mh At Yol - 1 Lumpsum Price Worked Out By The Contractor For Building Work As Listed In Schedule A Part-I. 2 Lumpsum Price Worked Out By The Contractor For Internal Watersupply And Bath / Toilet / Kitchen Appliance
Open Tender
Indian
Himachal Pradesh
Kangra
29-10-2022

Tender Details

Provision Of Tech And Otm Accn For Mh At Yol - 1 Lumpsum Price Worked Out By The Contractor For Building Work As Listed In Schedule A Part-I. 2 Lumpsum Price Worked Out By The Contractor For Internal Watersupply And Bath / Toilet / Kitchen Appliances As Listed In Schedule A Part-Ii. 3 Lumpsum Price Worked Out By The Contractor For Plumbing And Sanitary Appliances As Listed In Schedule A Part-Iii. 4 Lumpsum Price Worked Out By The Contractor For Internal Watersupply And Bath / Toilet / Kitchen Appliances As Listed In Schedule A Part-Iv. 5 Lumpsum Price Worked Out By The Contractor For Protective Work As Listed In Schedule A Part-V. 6 Lumpsum Price Worked Out By The Contractor For Road, Path, Culvert And Hardstandings As Listed In Schedule A Part-Vi. 7 Lumpsum Price Worked Out By The Contractor For Sewage Disposal As Listed In Schedule A Part-Vii. 8 Lumpsum Price Worked Out By The Contractor For Area Drainage As Listed In Schedule A Part-Viii. 9 Lumpsum Price Worked Out By The Contractor For Security Fencing And Gate As Listed In Schedule A Part-Ix. 10 Lumpsum Price Worked Out By The Contractor For Water Harvesting As Listed In Schedule A Part-X. 11 Lumpsum Price Worked Out By The Contractor For Ground Water Tank As Listed In Schedule A Part-Xi. 12 Lumpsum Price Worked Out By The Contractor For Demolition And Dismantling Work As Listed In Schedule A Part-Xii. 13 Lumpsum Price Worked Out By The Contractor For External Electrification As Listed In Schedule A Part-Xiii. 14 Lumpsum Price Worked Out By The Contractor For External Water Supply As Listed In Schedule A Part-Xiv. 15 Lumpsum Price Worked Out By The Contractor For Dg Set As Listed In Schedule A Part-Xvii. 16 Lumpsum Price Worked Out By The Contractor For Fire Fighting As Listed In Schedule A Part-Xviii. 17 Lumpsum Price Worked Out By The Contractor For Refrigeration Work As Listed In Schedule A Part-Xix. 18 Lumpsum Price Worked Out By The Contractor For Earth Work And Site Clearance As Listed In Schedule A Part-Xxv. 19 Lumpsum Price Worked Out By The Contractor For Credit Schedule As Listed In Schedule A Part-Xxvi. 20 Internal Electrification 21 Supply And Fix Led Lamp 3W Suitable For Back Plate For Angle / Battern Fitting. ( Night Lamp ) Make Havells Cat Part No Lhlderuemk8x003 Or Equivalent In Bajaj / Crompton / Phillips 22 Supply And Fixing Of Reccessed 2X2 White Crca Powder Coated Led Luminaire With Dimmable Ballast With Total System Wattage 36W Covered By Acrylic Diffuser, Extruded Aluminium Housing, Prewired Electronic Driver Complete With All Accessories Suitable For Operation On Single Phase 240V 50Hz Ac Supply As Required. Led Shall Be Smd Type, Fixture Should Have Minimum Efficasy >= 100Lm / W And Minimum System Lumens 3600. ( Make:- Bajaj Cat Part No. Bzrsql 36W Led Gzi Wh Or Equivalent In / Philips / Havells / Wipro 23 Supply & Fixing Of Indoor Type Surface Mounted Linear Led Fitting White Crca Powder Coated With Total System Wattage 20W Covered By Pmma Acrylic Diffuser, Die Cast Aluminium Housing, High Efficiency Reflecctor, Prewired Electronic Driver Complete With All Accessories Suitable For Operation On Single Phase 240V 50Hz Ac Supply As Required. Led Shall Be Smd Type, Fixture Should Have Minimum Efficacy >=100 Lm / W And Minimum System Lumens 2000. Make:- Bajaj Cat Part No :- Bclab 20W Led / Philips-Bn108c Led 20S Psu Cdl Wh Led Luminaire Or Equivalentin Wipro / Havells 24 Supply, Installation, Testing, Commissioning And Numbering Of Indoor Type 10W Surface / Wall Mounted Led Batten Fitting ( Mirror Light ) Covered By Diffuser, High Efficiency Reflecctor, Prewired Electronic Driver Complete With All Accessories Suitable For Operation On Single Phase 240V 50Hz Ac Supply As Required. Led Shall Be Smd Type. ( Make:- Bajaj Cat Part No. Bclsb 10W Led Mirror Light Or Wipro Cat No Ll20-111-Xxx-65Ne3 Or Equivalent In Philips / Havells 25 Supply & Fixing Of Indoor Type Recess Mounted Downlighter White Crca Powder Coated Led Light Fixture With Total System Wattage 10-12W Covered By Pmma Acrylic Diffuser, Die Cast Aluminium Housing, High Efficiency Reflector, Prewired Electronic Driver Complete With All Accessories Suitable For Operation On Single Phase 240V 50Hz Ac Supply As Required. Led Shall Be Smd Type, Fixture Should Have Minimum Efficacy >=100 Lm / W And Minimum System Lumens 1000.Make:- Bajaj Cat Part No. Bzslo 12W Wh Led Pro Or Equivalent In Wipro / Philips / Havells 26 Supply & Fixing Of Indoor Type Surface Mounted Downlighter White Crca Powder Coated Led Light Fixture With Total System Wattage 10-12W Covered By Pmma Acrylic Diffuser, Die Cast Aluminium Housing, High Efficiency Reflector, Prewired Electronic Driver Complete With All Accessories Suitable For Operation On Single Phase 240V 50Hz Ac Supply As Required. Led Shall Be Smd Type, Fixture Should Have Minimum Efficacy >=100 Lm / W And Minimum System Lumens 1000.Make:- Bajaj Cat Part No.Bzslo Sleek Surface 12W Wh Rd Or Equivalent In Wipro / Philips / Havells 27 Supply & Fixing Of Led Bulkhead Luminaire, Vandal Resistant Polycarbonate Diffuser With Ip 65, Ik08 Dust Tight And Water Jet Proof For Clean Operation With Total System Wattage 9-10W And System Lumen >600 Lm, Luminaire Efficiency Of Luminaire Not Less Than55 Lm / W, ( Make:- Bajaj Cat Part No. Bibwp 10W Led Or Philips Cat No. Wt202w Led6s Cw Psu S2 Pc / Trilux 9W Led Or Equivalent In Wipro / Havells 28 Supply & Fixingshadoless Lamp ( 40000 Lux ) Complete All As Specified And As Directed. 29 M&L For Pvcconduit All Accessories ( Isi Marked ) Of 1.8Mm Thickness, Heavy Grade Of Including 25Mm Dia For Provision Of Passing Of Cable / Wire For Tv, Intercom, Tele Phone , Data, Complete All As Specified And As Directed By Engr-In-Charge. 30 M&Lincluding Terminations Ofco-Axial Tv Rg-6 Grade, 0.7 Mm Solid Annealed Bare Electrolytic Grade Copper Conductor Pe Insulated, Shielded With Fine Tinned Copper Braid And Protected With Pvc Sheath In The Existing Surface / Recessed Steel / Pvc Conduit As Required. 31 M&L Cable Tv Splitter 4Way O / G With 1-Way I / C Complete Incl Mounting Inside Pvc Box Of Suitble Size Flushed To Wall All As Directed By Engineer-In-Charge. 32 M&L For Modular Tv Co-Axial Socket Outlet 1 Module On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Base & Plate Etc. As Requiredall As Directed By Engineer-In-Charge. 33 M&L For Modular 250Volts Telephone Socket Outlet ( Rj-11 ) With Shutter 1 Module On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Base & Plate Etc. As Required. 34 M&L Of 1 Or 2 Module Modular Base & Cover Plate On Existing Modular Metal / Pvc Boxes Etc. As Required All As Directed By Engineer-In-Charge. 35 M&L For 1 Or 2 Module ( 75 Mmx75 Mm ) Modules, 0.8Mm Thick Gi Box For Modular Switches In Recess Etc As Required All As Directed By Engineer-In-Charge. 36 M&L Fortelephonecables With High Density Polyethelene Insulated, Solid Annealed High Conductivity Bare Copper With Dia 0.5Mm, Paired , Polyester Taped And Sheathed With High Oxygen Index Fireretardent Pvc Compound , Generally Conforming To Itd Specificationsg / Wir-06 / 02. May 94 Of 4-Pair Drawn Through Pvc Conduit And Connecting And Testing Complete All As Directed By Engineer-In-Charge. 37 Supply And Fix Energy Saving Ceiling Fan 1200Mm Sweep, 230V, Ac Including Electrical Connectioncomplete All As Specified And As Directed. Make Havells Model No Es55 Star Rating Or Equivalent In Crompton / Bajaj 38 Supply And Fix Exhaust Fan 300Mm Sweep, 900Rpm, Heavy Duty Complete With All Acccessories Internal Pre Wired And Including Connecting Up With Three Core Flexible Copper Conductor Cable With Suitable Size Complete All As Specified And As Directed. Makehavells Model Turbo Force Or Equivalent In Bajaj / Cg 39 Supply And Fix Louvers Suitable For Exhaust Fan 300Mm Sweep Of Gi Sheet Incl Fixing Arrangement Like Nut, Bolts, Washersetc Complete All As Specified And As Directed. 40 Supply And Fix Exhaust Fan 450Mm Sweep, 900Rpm, Heavy Duty Complete With All Acccessories Internal Pre Wired And Including Connecting Up With Three Core Flexible Copper Conductor Cable With Suitable Size Complete All As Specified And As Directed. Makehavells Model Turbo Force Or Equivalentbajaj / Cg 41 Supply And Fix Louvers Suitable For Exhaust Fan 450Mm Sweep Of Gi Sheet Incl Fixing Arrangement Like Nut, Bolts, Washersetc Complete All As Specified And As Directed. 42 G.I. Perforated Cable Traysupply, Fabrication And Installation Of G.I. Sheet Factory Fabricated Perforated Type Cable Trays Complete With All Bends, Tees, Elbows, Reducers Etc. Of Various Width ( Galvanisation Thickness Not Less Than 80 Microns ) With Perforation Not More Than 17.5% In Convenient Sections, Joined With Connectors, Suspended From The Ceiling With G.I. Suspenders Including G.I. Bolts & Nuts, Etc. As Required. As Per Is Code 2629-1985For The Following. ( The Cost Of Angle Iron / C Channel, Fastner & Gi Down Rod Shall Be Included In The Item Rate Quoted By The Contractor ) . 43 ( I ) 100Mm Tray, 1.6Mm Thick 40Mm Collar. 44 ( Ii ) 150Mm Tray, 1.6Mm Thick 40Mm Collar. 45 ( Iii ) 300Mm Tray, 2Mm Thick 40Mm Collar. 46 ( Iv ) 450Mm Tray, 2Mm Thick 40Mm Collar. 47 G.I. Ladder Type Cable Traysupply, Fabrication And Installation Of G.I. Sheet Factory Built In Ladder Type Cable Trays Complete With All Bends, Tees, Elbows, Reducers Etc. With Rungs At Every 250Mm Spacing Of Various Width In Convenient Sections, Joined With Connectors, Suspended From The Ceiling With G.I. Suspenders Including G.I. Bolts & Nuts, Etc. As Required. As Per Is Code 2629-1985 For The Following. ( All Bends & Tee Shall Be Of Factory Built-In Of Same Make As That Of Tray ) . 48 ( I ) 450Mm Tray, 2Mm Thick, ( 75X15x2 Side Channel ) ( Rung-35X15x2mm ) 49 ( Ii ) 600Mm Tray, 2Mm Thick, ( 75X20x2 Side Channel ) ( Rung-35X15x2mm ) 50 Nurse Call Systemsupply, Installationtestingandcommissioningofmicroprocessorcontrollernursesstationwith Terminal Monitor With In Builtpower Supply , With Charger Enclosed In A Powder Coated Cabinet . Having With Reset, Alarm / Buzzer, Call Acknowledge Withbattery Back Up, Batterychargercomplete System As Per Technical Specifications And As Per Required Of Followingsuitable Configuration.Complete All As Specified & Directed For The Follwing:- 51 ( I ) 24 Way 52 ( Ii ) 16 Way 53 Supplyinstallationtesting&Commissioningofbedcallpushbuttonwithledindicationand Flexiable Cord With Button , Call Reset , Call Indication, Station For Each Bed Complete As Required. 54 Supplyinstallationtesting&Commissioningoftoiletcallpushbuttonwithledindicationand Flexiable Cordwithbutton, Call Reset , Call Indication, Station For Each Bedcomplete As Required. 55 Supplyinstallationtesting&Commissioningofledindicatorsmoduleatoutsideof Eachward Complete As Required. 56 Supplying & Laying Of4-Pair Unshielded Twisted Pair With A Cross Filler ( + ) , Meeting Category 6 Standards As Per Tia-568C.2, The Cable Should Be Tested Till 250 Mhz , Shall Be Fire-Retardant, Low-Smoke & Zero-Halogen As Per Iec 60332-1, Iec 61034-2 & Iec 60754-1 Respectively In The Existing Surface / Recessed Steel / Pvc Conduit As Required. 57 Supplying, Fixing, Testing & Commissioning Ofsdb-1 In C-Block-A ( Lower Ground Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge. 58 Supplying, Fixing, Testing & Commissioning Ofsdb-2-Block-A ( Ground Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 59 Supplying, Fixing, Testing & Commissioning Of Sdb-3-Block-A ( Ground Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge. 60 Supplying, Fixing, Testing & Commissioning Of Sdb-1&3-Block-B Ground & Second Floor For Non-Essential Load All As Specified And As Directed By Engr-In- Charge. 61 Supplying, Fixing, Testing & Commissioning Of Sdb-2&4 -Block-A ( First & Third Floor ) For Non-Essential Load.All As Specified And As Directed By Engr-In- Charge. 62 Supplying, Fixing, Testing & Commissioning Of Sdb-1 -Block-C ( Lg Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge. 63 Supplying, Fixing, Testing & Commissioning Of Sdb-2-Block-C ( Ground Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 64 Supplying, Fixing, Testing & Commissioning Of Sdb-3-Block-C ( Third Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 65 Supplying, Fixing, Testing & Commissioning Of Sdb-1-Block-D ( Lower Ground ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 66 Supplying, Fixing, Testing & Commissioning Of Sdb-2&3-Block-D ( Ground & Third Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 67 Supplying, Fixing, Testing & Commissioning Of Sdb-1-Block-E ( Lower Ground Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 68 Supplying, Fixing, Testing & Commissioning Of Sdb-2, 3&4 -Block-E ( Ground, First & Second Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 69 Supplying, Fixing, Testing & Commissioning Of Sdb-1, 2&4-Block-A ( Lg, Ground & Second Floor ) For Essential Load All As Specified And As Directed By Engr-In- Charge.. 70 Supplying, Fixing, Testing & Commissioning Of Sdb-3-Block-A ( First Floor ) For Essential Load All As Specified And As Directed By Engr-In- Charge.. 71 Supplying, , Fixing, Testing & Commissioning Of Sdb-3-Block-A ( First Floor ) For Essential Load All As Specified And As Directed By Engr-In- Charge.. 72 Supplying, Fixing, Testing & Commissioning Of Sdb-1-Block-B ( Lower Groundfloor ) For Essential Load All As Specified And As Directed By Engr-In- Charge.. 73 Supplying, Fixing, Testing & Commissioning Of Sdb-2&4-Block-B ( Ground& Second Floor ) For Essential Load All As Specified And As Directed By Engr-In- Charge.. 74 Supplying, Fixing, Testing & Commissioning Of Sdb-3&5 -Block-B ( First & Second Floor ) For Essential Load All As Specified And As Directed By Engr-In- Charge.. 75 Supplying, Fixing, Testing & Commissioning Of Sdb-1 -Block-C ( Lower Floor ) For Essential Load All As Specified And As Directed By Engr-In- Charge.. 76 Supplying, Fixing, Testing & Commissioning Of Sdb-2 -Block-C ( Ground Floor ) For Non-Essential Load All As Specified And As Directed By Engr-In- Charge.. 77 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-3 -Block-C ( First Floor ) For Non-Essential Load. 78 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-4-Block-C ( Second Floor ) For Non-Essential Load. 79 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-5-Block-C ( Third Floor ) For Non-Essential Load. 80 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-1&2-Block-D ( Lg & Ground Floor ) For Essential Load. 81 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-3-Block-D ( First Floor ) For Essential Load. 82 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-4-Block-D ( Second Floor ) For Essential Load. 83 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-5-Block-D ( Third Floor ) For Essential Load. 84 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-1-Block-E ( Ground Floor ) For Essential Load. 85 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-2 -Block-E ( Ground Floor ) For Essential Load. 86 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-3 -Block-E ( First Floor ) For Essential Load. 87 Supplying, Fixing, Testing & Commissioning Ofabove Described Sdb-4-Block-E ( Second Floor ) For Essential Load. 88 Supplying, Fixing, Testing & Commisioningh Of Panel As Mentoned Below For Lift Panel:-Incomer 1 No. 160A Tpn Mccbmetering & Indication1 Set Of R, Y, B Phase Indicating Lamps1 No. ( 0-500V ) Voltmeter With Built-In Vss With 3 Nos. 2A Sp Mcb1 No. ( 0-160A ) Ammeter With Asswith 3 Nos. 160 / 5A CtSbus-Bar 1 Set Of 250A Tpn Aluminium Bus Bar With Colour Coded Pvc Sleeves Outgoings 5 Nos. 63A 4P Mccb . 89 Supplying, Fixing, Testing & Commisioning Of Panel As Mentioned Below For Lift Db:- Incomer 1 No. 63A Tpn Mccb+Elcbmetering & Indication1 Set Of R, Y, B Phase Indicating Lamps Bus-Bar 1 Set Of 100A Tpn Aluminium Bus Bar With Colour Coded Pvc Sleeves Outgoings2 Nos. 40A Tpn Mcb .2 Nos. 32A Tpn Mcb . 4 Nos. 16A Sp Mcb .4 Nos. 10A Sp Mcb . 90 Fire Fighting System 91 Supply And Fix Mild Steel Class C Diesel Pump Exhaust Pipe 150Mm Dia With One Layer Of 25Mm Thick Asbestos Rope Insulation And Including All Fitting Clamp / Structural Steel Supports Complete All As Specified And As Directed. 92 Supply And Fix Automatic Air Release Valve 50Mm Dia Suitable For Domestic Water With 50Mm Gun Metal Stop Valve Complete All As Specified And As Directed. 93 M&L For Cast Iron Sluice Valve 250Mm Dia With Steel Spindle And Flanged Ends Drilled Complete Class Pn -1.6 Conforming To Is-14846 Of 2000Any Pattern Complete With Iron Wheel Head, With Rubber Gaskets, Nuts, Bolts Washers And Packing Materials Etc All As Directed And As Per Site Requirement. 94 All As Per Item No. 94 But 300 Mm Dia 95 Supply, Fixing, Testing & Commissioning Ofc.I. Dual Plated Non-Return Valve 300Mm Dia [ Pn 1.6 Rating ( 16Kg / Cm2 ] Complete2 Nos. Matching Flanges, Rubber Insertion, With Nuts, Bolts And Washers Etc Of Following Sizes .Complete All As Specified And As Directed. 96 Supply, Instalation, Testing & Commissioning Of Strainer 300Mm Dia For Suction Made From Ms Body With Bottom And Top Removable Flanges With Nuts, Bolts Etc Complete All As Specified And As Directed. 97 Sprinkler & Its Piping ( Fire Fighting System ) 98 Supply And Fixing 25 Mm Dia Inspection & Testing Assembly With Gun Metal Gate Valve, Gun Metal Sight Glass, Drain Valve ( Ball Valve 50Mm Dia ) & Connection To Drain. Complete All As Specified And As Directed. 99 Fire Detection & Alarm System ) 100 Supplying And Fixing Frls Insulated Copper Conductor, Single Core Cable Of Size 2 Core, 1.50 Sqmm In Existing Steel Conmduits All As Specifed & As Directed By Engineer-In-Charge. 101 Supplying And Fixing Of 25 Mm Dia. 1.6 Mm Thick Isi Mark M.S. Conduit As Per Is:9537 Part-3 Along With Accessories In Surface / Recess Including Cutting The Wall And Making Good The Same In Case Of Recessed Conduit 102 Supply , Installation , Testing And Commissioning Of Network Repeater Panel With Minimum 10 Color Touch Screen Display With Qwerty Keypad, Mapping Minimum 2, 00, 000 Points On Network. The Nrp Shall Act As An Independent Node Communicating On The Peer To Peer Network And Shall Not Be Dependant On The Fire Panel Cpu For Operation. Failure Of Fire Panel Cpu Shall Not Result In Failure Of Nrp Operation Ul & Fm Approved Complete All As Specified & As Directed By Engineer-In-Charge. 103 Fire Fighting System ( Electrical Panel ) 104 Supplying, Fixing, Testing & Commissioning Offire Fighting Panel ( Indoor ) Use Located At Ground Floor On A Plain Civil Foundation With Cable Entry From Top Or Cable Trench With Bottom & Top Both Cable Entry / Outdoor Use Located In External Area On Rock Or Soft Soil As Case May Be With Bottom Cable Entry. 105 External Electric Supply 106 M & L Earthing Complete With Galvanised Steel Earth Plate Electrode 60 Cm X 60 Cm X 6.30Mm Thick Buried Directly In Ground To A Depth Not Less Than 2.25 Mtr Below Normal Ground Level With Top Edge Of Earth Plate At A Depth Not Less Than 1.50 Mtr Below Ground Level, Earth Plate Surrounded By 15 Cm Thick Packed Layer Of Charcoal And Common Salt Alternatively Upto 90 Cm And Connected With And Including Gi Strip Of Size 32X6 Mm By Means Of Bolts, Nuts, Check Nuts And Washers Of Gi. 40 Mm Bore Gi Pipe Light Grade From Earth Plate Up To Testing Point For Protection Of Strip And 20 Mm Bore Gi Pipe Mediumgradewith Wire Mesh Andfunnel Forwatering Including Necessary Excavation And Earth Work Pcc Chamber ( 1:3:6 ) Type C-2 With Rcc Cover Completeall As Shown In Electrical Plate No 3 Of Mes Schedule Part I Of Ssr Part I ( 2009 ) Complete All As Specified.Notes:- ( I ) Rcc Pit Cover Shall Be Pre-Cast Of Rcc ( 1:2:4 ) Type B, 80 Mm Thick Reinforcement With 8 Mm Torsteel @ 100 C / C In Lieu Of Ci Cover And The Rate Includes In The Unit Rate Of Item ( Ii ) Earth Electrode Shall Be Protected Upto Test Point Using Necessary Arrangement With Suitable Size Gi Pipeand The Rate Includes In The Unit Rate Of Item ( Iii ) Earth Pit Chamber And Rcc Cover Shall Be Painted With Redpaint Over A Primer Coat And The Rate Includes In The Unit Rate Of Item. 107 M & L Earthing Complete With Copperearth Plate Electrode 60 Cm X 60 Cm X 3.15Mm Thick Buried Directly In Ground To A Depth Not Less Than 2.25 Mtr Below Normal Ground Level With Top Edge Of Earth Plate At A Depth Not Less Than 1.50 Mtr Below Ground Level, Earth Plate Surrounded By 15 Cm Thick Packed Layer Of Charcoal And Common Salt Alternatively Upto 90 Cm And Connected With And Including Gi Strip Of Size 20 X 3 Mm By Means Of Bolts, Nuts, Check Nuts And Washers Of Gi. 40 Mm Bore Gi Pipe Light Grade From Earth Plate Up To Testing Point For Protection Of Strip And 20 Mm Bore Gi Pipe Mediumgradewith Wire Mesh Andfunnel Forwatering Including Necessary Excavation And Earth Work Pcc Chamber ( 1:3:6 ) Type C-2 With Rcc Cover Completeall As Shown In Electrical Plate No 3 Of Mes Schedule Part I Of Ssr Part I ( 2009 ) Complete All As Specified.Notes:- ( I ) Rcc Pit Cover Shall Be Pre-Cast Of Rcc ( 1:2:4 ) Type B, 80 Mm Thick Reinforcement With 8 Mm Torsteel @ 100 C / C In Lieu Of Ci Cover And The Rate Includes In The Unit Rate Of Item ( Ii ) Earth Electrode Shall Be Protected Upto Test Point Using Necessary Arrangement With Suitable Size Gi Pipeand The Rate Includes In The Unit Rate Of Item ( Iii ) Earth Pit Chamber And Rcc Cover Shall Be Painted With Redpaint Over A Primer Coat And The Rate Includes In The Unit Rate Of Item. 108 Earthing Complete With Galvanized Steel Earth Plate Electrode 60 Cm X 60 Cm X 6.30Mm Thick Buried Directly In Ground To A Depth Not Less Than 2.25 Mtr Below Normal Ground Level With Top Edge Of Earth Plate At A Depth Not Less Than 1.50 Mtr Below Ground Level, Earth Plate Surrounded By 15 Cm Thick Packed Layer Of Charcoal And Common Salt Alternatively Upto 90 Cm And Connected With And Including Gi Wire Of Size 4 Mm By Means Of Bolts, Nuts, Check Nuts And Washers Of Gi. 15 Mm Bore Gi Pipe Light Grade For Protection Of Gi Wire From Earth Plateto Testing Point For Protection, 20Mm Bore Gi Pipe Medium Grade For Water With Wire Mesh Andfunnel Forwatering Including Necessary Excavation And Earth Work, Pcc Chamber ( 1:3:6 ) Type C-2 With Rcc Cover Completeall As Shown In Electrical Plate No 3 Of Mes Schedule Part I Of Ssr Part I ( 2009 ) Complete All As Specified.Notes:- ( I ) Rcc Pit Cover Shall Be Pre-Cast Of Rcc ( 1:2:4 ) Type B, 80 Mm Thick Reinforcement With 8 Mm Torsteel @ 100 C / C In Lieu Of Ci Cover And The Rate Includes In The Unit Rate Of Item. ( Ii ) Earth Electrode Shall Be Protected Upto Test Point Using Necessary Arrangement With Suitable Size Gi Pipe Up To 7.50 M And The Rate Includes In The Unit Rate Of Item. ( Iii ) Earth Pit Chamber And Rcc Cover Shall Be Painted With Redpaint Over A Primer Coat And The Rateincludes In The Unit Rate Of Item. ( Iv ) The Earth Chamber Shall Be Constructed 5 M Away From The Edgeof The Bldgpit And The Cost Of The Same Is Deemed To Be Included In The Rate Quoted For This Item. 109 Supply And Fix Double Compression Copper Stain Less Steel Gland For Fixing Armoured Cable In Panel Of Size 2 Core 6 Sq Mm To 16 Sq Mm Size 110 Description All As Sl Item No 28 But For Cable Of Size 4 Core 6 To 16 Sq Mm 111 Description All As Sl Item No 28 But For Cable Of Size 4 Core 25 To 35 Sq Mm Above. 112 Description All As Sl Item No 28 But For Cable Of Size 3½ Core 50 Sq Mm To 70 Sq Mm Above. 113 Description All As Sl Item No 28 But For Cable Of Size 3½ Core 95 Sq Mm To 120 Sq Mm Above. 114 Description All As Sl Item No 28 But For Cable Of Size 3½ Core 150 Sq Mm Above. 115 Description All As Sl Item No 28 But For Cable Of Size 3½ Core 240 Sq Mm To 300 Sq Mm Above. 116 Supplying, Fixing Hot Dipped Gi Ladder Type Cable Tray With 60Mm Collar Including Grouting / Anchor Fastener Supports From Wall / Ceiling Etc. Cable Tray Shall Be Given A Rigorous Anti-Corrosive Treatment Before Applying Two Coats Of Red Oxide And One Coat Of Finish Colour Paint In The Following Sizes, 117 450Mm Tray, 2Mm Thick, ( 75X15x2 Side Channel ) ( Rung-35X15x2mm ) 118 600Mm Tray, 2Mm Thick, ( 75X20x2 Side Channel ) ( Rung-35X15x2mm ) 119 900Mm Tray, 2.5Mm Thick, ( 100X20x2.5 Side Channel ) ( Rung-40X15x2.5Mm ) 120 Supply, Installation, Testing And Commissioning Of Led Gate Light 20-22W With Spun Aluminium White Power Coated Top Cover And Seamless Gi Pipe Bottom Housing For Control Gear. Luminaire To Be Provided With Base Plate And Fixing Holes For Directly Mounting On The Concrete Pedestal. Power Factor Of Greater Pf>0.95 Thd < 10% & Ingress Protection Ip65 To Be Provided. Make Bajaj / Philips / Wipro Or Equivalent As Per Approved List Of Make. 121 Junction Box ( 280 X170 X130 Mm ) With Hinges And Locking Arrangement 7 Ms Clamp Made Of 50X6 Mm Flat, Complete In All Respect Including 2 Nos. Gi Pipe 1.5 Dia Having 1 Mtr. Length Each And Chuck Nut For Cable Connection Etc. As Per Direction Of E / I. 122 M & L Wiring With 3X1.5 Sq. Mm. Pvc Insulated Copper Conductor 1100 V Grade Wires In Existing Pole Including Connecting At The Lighting Fixtures Complete. 123 Supplying, Fixing, Testing & Commissioning Ofmain Lt Panel As Described Below. 124 Supplying, Fixing, Testing & Commissioning Ofamf Panel Cum Emergency Panel As Described Below . 125 Supplying, Fixing, Testing & Commissioning Of Capacitor Panel-1, 2&3 As Described Below. 126 Supplying, Fixing, Testing & Commissioning Of Mdb-1 ( For Non-Essential ) As Described Below. 127 Supplying, Fixing, Testing & Commissioning Of Mdb-2 Block-B ( For Non-Essential ) As Described Below. 128 Supplying, Fixing, Testing & Commissioning Ofmdb-3 Block-C ( For Non-Essential ) As Described Below. 129 Supplying, Fixing, Testing & Commissioning Of Mdb-4 Block-D ( For Non-Essential ) As Described Below. 130 Supplying, Fixing, Testing & Commissioning Of Mdb-5 Block-E ( For Non-Essential ) As Described Below. 131 Supplying, Fixing, Testing & Commissioning Mdb-1 Block-A ( For Essential Supply ) As Described Below. 132 Supplying, Fixing, Testing & Commissioning Of Mdb-2 Block-B ( For Essential Supply ) As Described Below. 133 Supplying, Fixing, Testing & Commissioning Of Mdb-3 Block-C ( For Essential Supply ) As Described Below. 134 Supplying, Fixing, Testing & Commissioning Of Mdb-4 Block-D ( For Essential Supply ) As Described Below. 135 Supplying, Fixing, Testing & Commissioning Of Mdb-5 Block-E ( For Essential Supply ) As Described Below. 136 Supplying, Fixing, Testing & Commissioning Of Panel-8 ( For Other Ancilliary Non-Essential Panel ) As Described Below . 137 Supplying, Fixing, Testing & Commissioning Of Feeder Panel-1 Outdoor Type ( For Ancillary Building ) As Described Below. 138 Supplying, Fixing, Testing & Commissioning Of Feeder Panel-2 Outdoor Type ( For Ancillary Building ) As Described Blow. 139 Supplying, Fixing, Testing & Commissioning Of Feeder Panel-3 Outdoor Type ( For Ancillary Building ) As Described Below. 140 Supplying, Fixing, Testing & Commissioning Of Feeder Panel-4 Outdoor Type ( For Ancillary Building ) As Described Below. 141 Supplying, Fixing, Testing & Commissioning Of Mdb-9 Outdoor Type ( For External Lighting ) As Described Below. 142 Supplying, Fixing, Testing & Commissioning Of Feeder Panel-1&4 External Light ( For External Lighting ) As Described Below. 143 Supplying, Fixing, Testing & Commissioning Of Feeder Panel-2&3 External Light ( For External Lighting ) As Apecified & As Directed By Engineer-In-Charge. 144 Construction Of Brick Masonry Valve Pit Of Size 1.2 X 1.2 X 1.2M ( Internal Dimension Of Chamber ) With Brick Work In Cement Mortar 1:4 Including Plastering Internally And Pointing Externally As The Work Proceeds Complete With Ms Sheet Cover 3.15Mm Thick And Angle Iron Frame 40Mmx40mmx6mmwith Handle, Locking Arangement And Painting With Two Coats Of Synthetic Enamelled Paint Over A Coat Of Red Oxide Primer On Steel Surfaces Including Earth Work & Excavation In Any Type Of Soil, Disposal Of Surplus Spoil Not Exceeding 50M Concrete Etc All As Specified And Shown On Drawing. 145 Description All As Per Item No 63 Above But Of Size 900Mm X 900Mm X 1050Mm 146 External Water Supply 147 Supply, Laying , Jointing And Testing Of Di ( Ductile Iron ) Pipe 80 Mm Bore Spigot And Socketed Type Of Class K-9 Conforming To Is 8329 Of 2000 With Inside Surface Of Centrifugally Cement Mortar Lined Laid In Trenches / On Ground Suitable For & Including Rubber Gasket ( Push-On ) Joint And Jointing Material Complete All As Specified And Diorected. 148 Material & Labour For Fabrication Of Header Made Out Of Heavy Duty Ms Pipe 250 Mm Dia Not Less Than 12Mm Thick And Not Less Than 10Mtr Long Duty Painted And Welded On Both Sides With Suitable Holes-07 Nos Of Siges One 150Mm Dia ( Incoming ) And 6 Nos ( Outgoing ) ( 4 Nos 80Mm Dia, 1 Nos 50Mm Dia And One Nos 40Mm Dia ) . The Job Includes Welding 06 No 80Mm, 50Mm And 40Mm Dia Ms Pipe 600 Mm Long Heavy Grade At One End And Other End Duly Welded With Ms Flange Having Thickness Not Less Than 10Mm, Duly Holes Drilled Matching With The Holes Of Sluice & Gae Valve Flange 80Mm, 50Mm And Threaded For 40Mm Dia And Including 6 No Ms Pipe Piece 600 Mm Ling 80Mm, 50Mm And Threaded For 40Mm Dia Heavy Grade Welded With Ms Flange Having Thickness Not Less Than 10Mm Duly Holes Drilled Matching With The Holes Of Sluice & Gate Valve Flange 80Mm, 50Mm And Threaded For 40Mm Dia Complete All As Directed By Engr-In-Charge. 149 M&L For Providing & Fixing In Position 25Mm Dia Lawn Hydrants Consisting Of 25Mm Dia Ball Valve , Gi Nipple And Threaded Hose Reeiver Complete All As Specfied And As Directed By Engr-In-Charge 150 Constructions Of Brick Masonary Valve Pit Of Size 90X90x90 Cm ( Internal Dimension Of Chamber ) With Earth Work In Ant Type Of Soil, Pcc M-10 Type C-2 As In Foundation, Bricks Work In Cm 1:6, 23 Cm Thick, 15 Mm Thick Plaster In Cement Mortar 1:4 Internally And Externally Flush Pointed In Same Mortar As The Work Proceeds. Lfooring Shall Be 40Mm Thick In Pcc M-15 ( Nominal Mix ) Laid Over 75Mm Thick Hard Core. Top Cover Shall Be Made Out Of Ms Sheet 3.15Mm Thick Fixed In Angle Iron Frame Made Out Of Angle Size 40X40x6mm With Two Number Of Hinges On One Side And Locking Arranagement At Other Side With 50Mm Pad Lock Complete Including Painting With 2 Coat Of Synthetics Paint Over One Coat Of Red Oxide Primer Complete All As Specified And As Shown On Drawing All As Specified And As Directed. 151 Constructions Of Brick Masonary Valve Pit Of Size 120X120x120 Cm ( Internal Dimension Of Chamber ) With Earth Work In Ant Type Of Soil, Pcc M-10 Type C-2 As In Foundation, Bricks Work In Cm 1:6, 23 Cm Thick, 15 Mm Thick Plaster In Cement Mortar 1:4 Internally And Externally Flush Pointed In Same Mortar As The Work Proceeds. Lfooring Shall Be 40Mm Thick In Pcc M-15 ( Nominal Mix ) Laid Over 75Mm Thick Hard Core. Top Cover Shall Be Made Out Of Ms Sheet 3.15Mm Thick Fixed In Angle Iron Frame Made Out Of Angle Size 40X40x6mm With Two Number Of Hinges On One Side And Locking Arranagement At Other Side With 50Mm Pad Lock Complete Including Painting With 2 Coat Of Synthetics Paint Over One Coat Of Red Oxide Primer Complete All As Specified And As Shown On Drawing All As Specified And As Directed. 152 Supply, Installation, Testing & Commissioning Of Factory Assembled Compact Self Contained Fix Speed Hydropneumatic System Comprising Of Following :- 153 Supply And Fix Ci Automatic Air Release Valve 50Mm Dia Suitable For Domestic Water With 50Mm Gun Metal Stop Valve Complete All As Specified And As Directed By Engr-In-Charge. 154 Supply And Fix Strainer Y Type Conforming To Is, Of Size 50Mm ( 2 ) Dia Complete All As Specified And As Directed By Engr-In-Charge. 155 Supply And Fixing, Testing & Commissioning Of Resilient Rubber Lined Single Arch Vibration Eliminators Suitable For Raw Water Up To 45 C Temperature, Working Pressure 10.0 Kg / Cm2 And Test Pressure 20 Kg / Cm2 156 Supply Laying Jointing And Testing Of Di ( Ductile Iron ) Pipe Of 150 Mm Dia Spigot And Socketed Type Of Class K-9 Confirming To Is 8329 Of 2000 With Inside Surface Of Centrifugally Cementy Mortar Lined, Laid In Trenches / On Ground Suitable For & Including Rubber Gasket ( Push-On ) Joint And Jointing Material Complete All As Specified And Directed. 157 M&L For Cutting Of Roads For Laying Of Pipe Of Any Size And Type Complete All As Specified And Directed. Repair To Road Cutting By Providing Soling With Broken Boulders Or Quarried Stone And Applying Cold Emulsion Mixed With Aggregate As Per ManufacterS Instructions Including Necessary Compaction By Rolling Etc Match Complete All As Specified And Directed. 158 Lightening Protection 159 M&L Of Earthing Comlete With Galvanised Steel Earth Plate Electrode 60 Cmx60 Cmx6.30Mm Thick Buried Directly In Ground To A Depth Not Less Than 2.25 Mtr Below Normal Ground Level With Top Edge Of Earth Plate At A Depth Not Less Than 1.50 Mtr Below Ground Level, Earth Plate Surrounded By 15 Cm Thick Packed Layer Of Harcoal Ad Common Salt Alternatively Upto 90 Cm And Connected With And Including Gi Strip Of Size 32X6 Mm By Means Of Bolts, Nuts, Check Nuts And Washers Of Gi 40 Mm Bore Gi Pipe Light Grade From Earth Plate Up To Testing Point For Protection Of Strip And 20 Mm Bore Gi Pipe Medium Grade With Wire Mesh And Funnel For Watering Including Necessary Excavation And Earth Work Pcc Chamber ( 1:3:6 ) Type C-2 With Rcc Cover Complete All As Shown In Electrical Plate No 3 Of Mes Schedule Part-I Of Ssr Part-I ( 2009 ) Complete All As Specified And Directed By Engr-In-Charge. Note:- ( I ) Rcc Pit Cover Shall Be Pre-Cast Of Rcc ( 1:2:4 ) Type B, 80 Mm Thick Reinforcement With 8Mm Tor Steel @ 100 C / C In Lieu Of Ci Cover And The Rate Includes In The Unit Rate Of Item. ( Ii ) Earth Electrode Shall Be Protected Upto Test Point Using Necessary Arrangement With Suitable Size Gi Pipe And The Rate Includes In The Unit Rate Of Item ( Iii ) Earth Pit Chamber And Rcc Cover Shall Be Painted With Red Paint Over A Primer Coat And The Rate Includes In The Unit Rate Of Item. 160 Dg Set 161 Supply, Installation, Commissioning And Testing Of Diesel Engine Driven Water Cooled Generating Set Of Capacity 200 Kva, 415 Volts, Bhp As Per Manufacture Recommendation, Ac Supply, 50 Hz, 3 Phase 4 Wire, 0.8 Pf At Ntp, Speed 1500 Rpm At Yol Mounted On Common Base Frame With Flexible Coupling And Meeting The Requirement Of Is-4722 / Bis Specification With Cpcb Approved Acoustic Enclosures Fabricated Out Of Crca Sheets As Per Manufacture Recommendation. Sound Proofing Of Enclosures Is Done With High Quality Foam Conforming To Is-8183 For 75 Dbt 01 Metre Complete Including Pcc Foundation In All Respect As Per Norms Of Oem. 162 Technical Specification Of Dg Set - Electric Generating Set Placing The Engine And A.C. Generator On M.S. Frame Duly Bolted, Coupled, Aligned, Tested And Housed Within The Acoustic Enclosure Complete With The Followings: 163 Diesel Engine: Water Cooled Diesel Engine Of Adequate Capacity Tp Produce Power Otput Of 200Kva At 1500 Rpm Generally In Accordance With Latest Bis / Is Specification, 12 Volts Self Starting Including Maintenance Free Battery Of Suitable Capacity, Charging Dynamo / Alternator, Air Cleaner, Diesel / Oil Filters, Complete In All Respect. The Engine Shall Be Capable Of Taking 10% Over Load For One Hour For Every 12 Hours Running Confirming To The Environment ( Protection Act 1986 ) ( 29 Pf 1986 ) And As Amended Vide Gazette Of India Notifications Part-Ii Sections-Iii Sub Section ( I ) Dated 12 Jul 2004. 164 A.C. Generator –Brush Less Type, Synchronous, A.C. Generators Continuously Rated For 415 Volts, 3 Phase, 4 Wire, 50 Hz, 1 Power Factor ( Lagging ) At 1500 Rpm, 4 Pole, Screen Protected, Drip Proof, Horizontal Foot-Mounted Type, Self-Excited, Selfregulated With Static Excitation System, Class ‘H’ Insulation. The Alternator Is Capable Of Developing Rated Output &Able To Take 10% Overload For One Hour At Every 12 Hrs Of Operation 165 Accessories:Base Frame : The Diesel Engine And The A. C. Generator Will Be Mounted On A Suitable Base Frame Of Sturdy To Minimize Vibration And Ensure Easy Maintenance. 166 Fuel Tank : Daily Service Fuel Tank Of Sheet Metal Of Suitable Capacity Complete With Drain Valve, Air Vents Inlet And Outlet Connection. 167 Batteries : Battery ( Dry And Uncharged ) Of Suitable Amp-Hr Capacity Along With Leads For Connection. 168 Manually Operated Standard Alternator Control Panel Fabricated Out Of Sheet Steel Angle, Iron, Structure, Acid Treated For Anti-Corrosion, Floor Mounting, Cubicle Pattern, Powder Coated Dust And, Vermin Proof, Complete With Internal Wiring And With The Followings: 169 • Powder Coated Control Panel Manufactured With Crca Sheet Provides: 170 • Mccb Of Suitable Rating With Short Circuit Protection 171 • Controller Which Displays Voltage, Current, Kw, Pf, Frequency, Kwh. 172 • Indicating Lamps For “Load On” And “Set Running” 173 • Current Transformers Of Suitable Ratings 174 • Copper Cables Of Suitable Capacity With Incoming And Outgoing Terminations 175 • Control Fuses Duly Wired And Ferruled 176 Technical Specification Of Acoustic Enclosure Salient Features: 177 • Approved By Arai, The Nodal Agency Of Cpcb 178 • Compact, Modular Construction And Sleek Design With Low Noise Level 75 Dba, At A Distance Of 1 Meter From Canopy In Free Field Conditions. 179 • Soundproof, Weather-Proof And Environment Friendly Silent Set. 180 • Ready-To-Use Silent Dg Set, Which Eliminates Need Of Foundation Or Grouting. 181 • Single Bearing Generator With Anti Vibration Mounting Ensures Minimal Vibration. 182 • Steel Outer Construction With 1.6Mm Crca Sheet With Heavy-Duty Fabricated Base Frame And Inbuilt Fuel Tank. 183 • Attenuators Are Placed In The Hot Air Outlet And Cooling Air Inlet. 184 • Residential Type Exhaust Silencer Is Mounted On The Enclosure. 185 • Illumination Arrangement Inside The Canopy. 186 Warranty – ( For Dg Set ) : Warranty Is For 5 Years From Date Of Supply Or The Completion Of 5000 Hrs. Which Earlier, Subject To The Use Ofgenuine Parts And Recommended Lube Oil And Coolant Maintenance By Authorised Person / Dealer Only. 187 Standard Manual Control Panel 188 Illumination Box 189 Supply, Installation, Commissioning And Testing Of Diesel Engine Driven Water Cooled Generating Set Of Capacity 500 Kva, 415 Volts, Bhp As Per Manufacture Recommendation, Ac Supply, 50 Hz, 3 Phase 4 Wire, 0.8 Pf At Ntp, Speed 1500 Rpm At Yol Mounted On Common Base Frame With Flexible Coupling And Meeting The Requirement Of Is-4722 / Bis Specification With Cpcb Approved Acoustic Enclosures Fabricated Out Of Crca Sheets As Per Manufacture Recommendation. Sound Proofing Of Enclosures Is Done With High Quality Foam Conforming To Is-8183 For 75 Dbt 01 Metre Complete Including Pcc Foundation In All Respect As Per Norms Of Oem. 190 Technical Specification Of Dg Set - Electric Generating Set Placing The Engine And A.C. Generator On M.S. Frame Duly Bolted, Coupled, Aligned, Tested And Housed Within The Acoustic Enclosure Complete With The Followings: 191 Technical Specification Of Dg Set - Electric Generating Set Placing The Engine And A.C. Generator On M.S. Frame Duly Bolted, Coupled, Aligned, Tested And Housed Within The Acoustic Enclosure Complete With The Followings: 192 Diesel Engine: Water Cooled Diesel Engine Of Adequate Capacity To Produce Power Output Of 500 Kva At 1500 Rpm Generally In Accordance With Latest Bis / Is Specification, 12 Volts Self Starting Including Maintenance Free Battery Of Suitable Capacity, Charging Dynamo / Alternator, Air Cleaner, Diesel / Oil Filters, Complete In All Respect. The Engine Shall Be Capable Of Taking 10% Over Load For One Hour For Every 12 Hours Running Confirming To The Environment ( Protection Act 1986 ) ( 29 Pf 1986 ) And As Amended Vide Gazette Of India Notifications Part-Ii Sections-Iii Sub Section ( I ) Dated 12 Jul 2004. 193 A.C. Generator – Brush Less Type, Synchronous, A.C. Generators Continuously Rated For 415 Volts, 3 Phase, 4 Wire, 50 Hz, 0.8 Power Factor ( Lagging ) At 1500 Rpm, 4 Pole, Screen Protected, Drip Proof, Horizontal Foot-Mounted Type, Selfexcited, Self-Regulated With Static Excitation System, Class ‘H’ Insulation. The Alternator Is Capable Of Developing Rated Output &Able To Take 10% Overload For One Hour At Every 12 Hrs Of Operation. 194 Accessories:Base Frame : The Diesel Engine And The A. C. Generator Will Be Mounted On A Suitable Base Frame Of Sturdy To Minimize Vibration And Ensure Easy Maintenance. 195 Fuel Tank : Daily Service Fuel Tank Of Sheet Metal Of Suitable Capacity Complete With Drain Valve, Air Vents Inlet And Outlet Connection. 196 Batteries : Battery ( Dry And Uncharged ) Of Suitable Amp-Hr Capacity Along With Leads For Connection. 197 Control Panel:Manually Operated Standard Alternator Control Panel Fabricated Out Of Sheet Steel Angle, Iron, Structure, Acid Treated For Anti-Corrosion, Floor Mounting, Cubicle Pattern, Powder Coated Dust And, Vermin Proof, Complete With Internal Wiring And With The Followings: 198 • Powder Coated Control Panel Manufactured With Crca Sheet Provides: 199 • Mccb Of Suitable Rating With Short Circuit Protection 200 • Controller Which Displays Voltage, Current, Kw, Pf, Frequency, Kwh. 201 • Indicating Lamps For “Load On” And “Set Running” 202 • Current Transformers Of Suitable Ratings 203 • Copper Cables Of Suitable Capacity With Incoming And Outgoing Terminations 204 • Control Fuses Duly Wired And Ferruled 205 Technical Specification Of Acoustic Enclosure 206 • Approved By Arai, The Nodal Agency Of Cpcb 207 • Compact, Modular Construction And Sleek Design With Low Noise Level 75 Dba, At A Distance Of 1 Meter From Canopy In Free Field Conditions. 208 • Soundproof, Weather-Proof And Environment Friendly Silent Set. 209 • Ready-To-Use Silent Dg Set, Which Eliminates Need Of Foundation Or Grouting. 210 • Single Bearing Generator With Anti Vibration Mounting Ensures Minimal Vibration. 211 • Steel Outer Construction With 1.6Mm Crca Sheet With Heavy-Duty Fabricated Base Frame And Inbuilt Fuel Tank. 212 • Attenuators Are Placed In The Hot Air Outlet And Cooling Air Inlet. 213 • Residential Type Exhaust Silencer Is Mounted On The Enclosure. 214 • Illumination Arrangement Inside The Canopy. 215 Terms & Conditions: 216 Warranty – ( For Dg Set ) : Warranty Is For 5 Years From Date Of Supply Or The Completion Of 5000 Hrs. Which Earlier, Subject To The Use Ofgenuine Parts And Recommended Lube Oil And Coolant Maintenance By Authorised Person / Dealer Only. 217 Standard Manual Control Panel 218 Illumination Box 219 M & L For Earthing Complete With Galvanised Steel Earth Plate Electrode 60 Cm X 60 Cm X 6.30Mm Thick Buried Directly In Ground To A Depth Not Less Than 2.25 Mtr Below Normal Ground Level With Top Edge Of Earth Plate At A Depth Not Less Than 1.50 Mtr Below Ground Level, Earth Plate Surrounded By 15 Cm Thick Packed Layer Of Charcoal And Common Salt Alternatively Upto 90 Cm And Connected With And Including Gi Strip Of Size 32X6 Mm By Means Of Bolts, Nuts, Check Nuts And Washers Of Gi. 40 Mm Bore Gi Pipe Light Grade From Earth Plate Up To Testing Point For Protection Of Strip And 20 Mm Bore Gi Pipe Mediumgradewith Wire Mesh Andfunnel Forwatering Including Necessary Excavation And Earth Work Pcc Chamber ( 1:3:6 ) Type C-2 With Rcc Cover Completeall As Shown In Electrical Plate No 3 Of Mes Schedule Part I Of Ssr Part I ( 2009 ) Complete All As Specified.Notes:- ( I ) Rcc Pit Cover Shall Be Pre-Cast Of Rcc ( 1:2:4 ) Type B, 80 Mm Thick Reinforcement With 8 Mm Torsteel @ 100 C / C In Lieu Of Ci Cover And The Rate Includes In The Unit Rate Of Item ( Ii ) Earth Electrode Shall Be Protected Upto Test Point Using Necessary Arrangement With Suitablesize Gi Pipeand The Rate Includes In The Unit Rate Of Item ( Iii ) Earth Pit Chamber And Rcc Cover Shall Be Painted With Redpaint Over A Primer Coat And The Rate Includes In The Unit Rate Of Item. 220 Material And Labour Plain Cement Concrete 1:3:6 Type C1 Using 20Mm Graded Stone Aggregate For Plateform Size ( 4.50 Mtr X 2.0 Mtr X 0.75 Mtr ) Incl Necessary Formwork All As Specified With Surface Finishing Using Extra Cement For The Installation Ofdg Set 200 Kva Including Earth Work Andof Size 4000X1600x1900 Mm Complete. With Chain Link Fencing And Gate Complete All As Specified And Directed By Engr-In-Charge. 221 Material And Labour Plain Cement Concrete 1:3:6 Type C1 Using 20Mm Graded Stone Aggregate For Plateform Size ( 6.0 Mtr X 2.50 Mtr X 0.75 Mtr ) Incl Necessary Formwork All As Specified With Surface Finishing Using Extra Cement For The Installation Ofdg Set 500 Kvaearth Work And Of Size 5600X2000x2300 Mm Complete. With Chain Link Fencing And Gate Complete All As Specified And Directed By Engr-In-Charge. 222 Summer Cooling Appliances 223 Supply, Installation, Connecting, Testing And Commisxsioning Of Voltage Stabilizer For Automatic Operation Single Phase Naturally Air Cooled Indoor Type & Designe For Input Variation Between 170V To 250V With Output Voltage Stabilizd 230V With Accuracy Of +2.5% And Of Capacity 1.0 Kva Specified And Directed Make: V Guard, Blue Star, Voltas, Lg, Godrej, Whirlpool. 224 Supply And Fix Refrigerator, Electric Driven ( Single Phase ) Capacity 260 Ltr Bee, 5 Star Rated Smart Inverter Complete As Per Specified And Directed By Engr-In-Charge. 225 Supply And Fix Refrigerator, Electric Driven ( Single Phase ) Capacity 190 Ltr Bee, 5 Star Rated Smart Inverter Complete As Per Specified And Directed By Engr-In-Charge. 226 Hot Water Supply 227 S&F Electric Storage Water Heater Geysers, Capacity 25 Ltr Including Proper Fixing With Suitable Nuts And Bolts And Supply With Proper Pvc Connection For Incoming And Outgoing Water Connection Through Geyser Complete All As Specified And Directed. Cat Part No Ghwapxtwb025 White Blue 25 Ltr 2 Kw 8516, 5 Star Bee Rating Make: Havells Or Equivalent In Bajaj / Cg. 228 Air Condition Plant ( Hvac ) ( A ) Internal 229 Supply, Installing, Testing And Commissioning Of Double Skin Construction Air Handling Units As Per Specification. All Ahu’S Shall Be Draw Thru, Complete With Filter Section, Minimum 8 / 6 Row Deep ( 8 Row Deep For Tfa, 6 Row Deep For All Others, Unless Specified Otherwise In Boq Below ) Chilled Water Coil Of Copper Tube & Aluminum Fins, Squirrel Cage Induction Motor Suitable For Use With Variable Frequency Drive, Primary & Secondary Condensate Drain Pans Duly Insulated, Forward / Backward Curved, Centrifugal Fan ( S ) , Belt Drive, Vibration Isolators. Fan Motor Shall Be Suitable For 415+ 10% Volts & Confirm To Eff1, 50Hz, 3 Phase Ac Supply And Shall Have High Efficiency Motors. Ahu Shall Be Selected For A Maximum Face Velocity Of 500 Fpm Across Cooling Coil And Across Filters. Minimum Thickness Of Ahu Casing Shall Be 25Mm As Per Specification For Ceiling Suspended And 43Mm For Ahu. The Csu’S Noise Level Shall Be Nc 40 For All The Areas.Air Handling Capacities 230 Descriptiondehum Cfmtr Static Mmkw Type 231 Basement Block Ctfa Ahu4462.4 300.37Cs Ahu 232 Lower Ground Floor Block B Tfa Ahu 208011.2 30 1.1Cs Ahu 233 Ground Floorblock Atfa Ahu420 2.3 300.37 Cs Ahu 234 Block Btfa Ahu390 2.1 300.37 Cs Ahu 235 Block C Tfa Ahu150 0.8 300.37 Cs Ahu 236 Tfa Ahu210 1.2 300.37 Cs Ahu 237 Block Dtfa Ahu344 1.8 300.37 Cs Ahu 238 Tfa Ahu440 2.4 300.37 Cs Ahu 239 Block E Emergency Beds28003.6 321.1 Cs Ahu 240 Tfa Ahu 8744.7 300.5 Cs Ahu 241 First Floorblock A Delivery Suite Tfa Ahu 14077.1 300.5Cs Ahu Tfa Ahu 16329.2 300.5Cs Ahublock Bfamily Ward I4 Bed Gynae 13001.6 300.5Cs Ahu 5 Bed Gynae 14001.7 300.5Cs Ahu 4 Bed ( M ) 14501.8 300.5Cs Ahutfa Ahu 1000 5.3 300.5Cs Ahu Tfa Ahu 1050 5.6 300.5Cs Ahublock C Paed. Opd Tfa Ahu2601.4 300.37Cs Ahu Block D Family Ward Ii 6 Beds ( M & S ) 1320 1.7 300.5Cs Ahu 6 Beds ( P ) 2000 2.6 301.1Cs Ahu 4 Beds ( P ) 1280 1.6 300.5Cs Ahutfa Ahu11806.4 300.37 Cs Ahutfa Ahu780 4.2300.37 Cs Ahublock E6 Beds-Medical15252.0300.5 Cs Ahu Ward I Tfa Ahu 13707.4 300.5Cs Ahu 242 Second Floorblock Amedical Ward Iitfa Ahu1901.0 300.37Cs Ahu Block C 243 Operation Theatre*Pre Ot ( 6 Rowscooling Coil & 2 Rows 9001.0 300.50Cs Ahuheating Coil ) *Post Ot ( 6 Rowscooling Coil & 2 Rows 9001.5 300.50Cs Ahu Heating Coil ) *Sterile Zone ( 6 Rows Cooling Coil 16552.7 300.50Cs Ahu & 2 Rows Heating Coil ) *Clean Zone ( 6 Rowscooling Coil & 2 Rows 13504.6 300.10Cs Ahuheating Coil ) Tfa Ahu ( 8 Rowscooling Coil & 37504.0 280.37Cs Ahurows Heating Coil ) Block Dacute Med 4 Beds15001.9 300.5Cs Ahu ( 6 Rows Cooling Coil & 2 Rows Heating Coil ) Icu * 4 Beds ( 6Rowscooling Coil & 2 Rows 22002.7 321.1Cs Ahuheating Coil ) Tfa Ahu ( 6Rows Cooling Coil & 2 227712.2 351.5Cs Ahurows Heating Coil ) 244 Tfa Ahu ( 6Rowscooling Coil & 2 7954.2 300.5Cs Ahu Rows Heating Coil ) Block E Hospital Admintfa Ahu3201.7 300.5Cs Ahu Third Floorblock B 6 Beds-Surgical Ward I 16502.1 300.5Cs Ahu 6 Beda-Surgical Ward I 16102.1 300.5Cs Ahu7 Beds-Surgical Ward I 16302.1 300.5Cs Ahu Tfa Ahu695 3.7 300.5Cs Ahutfa Ahu765 4.1 300.5Cs Ahu Block Dtfa Ahu260 1.4300.5Cs Ahu 245 Operation Theater Air Handling Units Supply, Installation, Testing And Commissioning Of Sectionalized Construction Double Skin Blow Thru Type Air Handling Units ( Ahu Kit ) For Operation Theatres. Ahu Shall Comprise Of Following Sections: Modular Double Skin Horizontal Treated Fresh Units Made Of 46+2Mm Thick Puf Insulated Panels Thermal Break Extruded Aluminum Profiles With 0.8Mm Thick Pre-Coated Gi Outer Sheet & 0.8Mm Thick Plain Al Inner Sheet 246 ( A ) Supply Air Stream 247 ( I ) Filter Sections Consisting Of Flange Type Pre Filter ( Merv-8 ) . Face Velocity Across Filter Should Not Be More Than 500Fpm. 248 ( Ii ) Coil Size Shall Be Selected For Air Velocity Of 500 Ft / Minute With Minimum 8 Row Deep Chilled Water Cooling Coil & 3 Row Deep Hot Water Heating Coil Made Of Not Less Than 0.41Mm Thick Tube & 12.7Mm Dia Tube. Coil Should Be Tested At 21Kg / Sq.Cm. 249 ( Iii ) Humidifier Section With Pan Type Humidifier ( Humidifier Shall Be Located Externally In The Attic Space, Next To Ahu ) 250 ( Iv ) Heat Recovery Section With Heat Recovery Wheel Of Min Efficiency 75%. 251 ( V ) Fan Section With Plug Type Sisw Backward Curved High Efficiency Ec Fans With Efficiency Complaining To Ie3. Ec Motor Should Be Bldc Motor. With Inbuilt Speed Control. Ec Motor Should Be Bms Compatible. 252 ( Vi ) Discharge Plenum Section With Merv-13 Filter. 253 ( Vii ) Volume Control Dampers Of Extruded Aluminum Construction In Supply, Return And Exhaust Air Streams ( Sized For 100% Volume Of Air ) . Maximum Leakage Rate From Dampers Shall Be In Accordance With Amca Standard 500 As Indicated In Table 6.2.3.3.4 Of Ashrae Standard 90-1-2001. 254 ( B ) Exhaust Air Stream: 255 ( I ) Filter Sections Consisting Of Flange Type Pre Filter ( Merv-8 ) . Face Velocity Across Filter Should Not Be More Than 500Fpm. 256 ( Ii ) Heat Recovery Section With Heat Recovery Wheel. Of Min Efficiency 75%. 257 ( Iii ) Fan Section With Plug Type Sisw Backward Curved High Efficiency Ec Fans With Efficiency Complaining To Ie3. Ec Motor Should Be Bldc Motor. With Inbuilt Speed Control. Ec Motor Should Be Bms Compatible 258 ( Iv ) Volume Control Dampers Of Extruded Aluminum Construction In Supply, Return And Exhaust Air Streams ( Sized For 100% Volume Of Air ) . Maximum Leakage Rate From Dampers Shall Be In Accordance With Amca Standard 500 As Indicated In Table 6.2.3.3.4 Of Ashrae Standard 90-1-2001. 259 ( V ) Dehumidifier Section Comprising Of Molecular Sieve Desiccant Wheel & Steam Regeneration Arrangement. Quoted Price Shall Also Include Cost Of Control Wiring In 25Mm Dia Ms Conduit. 260 Following Motorized Dampers ( Including Actuators ) Shall Be Provided As Part Of Ahj’S: 261 ( I ) Motorised Damper For 100% Fresh Air ( Equivalent To 85% Of Supply Air Fan Capacity ) 262 ( Ii ) Motorised Modulating Damper For Exhaust Air ( Equivalent To Exhaust Air Quantity Mentioned For Each Ahu ) . 263 ( Iii ) Motorised On / Off Damper For 100% Exhaust Air For Smoke Evacuation ( Equivalent To Return Air Fan Capacity ) . 264 Motorised On / Off Damper For 100% Exhaust Air For Smoke Evacuation ( Equivalent To Return Air Fan Capacity ) . For The Following:- Positive Window Minor Ot Having Cfm-Supply Air-3070, Return Air-2763, Fresh Air-3070, Exhaust Air-2763, Tr-10.4, Kw-19.3, With Sp-125. 265 Motorised On / Off Damper For 100% Exhaust Air For Smoke Evacuation ( Equivalent To Return Air Fan Capacity ) . Positive Window Minor Ot Supply Air Return Airfresh Airexhaust Air Positive Window Otsupply Air Return Airfresh Airexhaust Air Ahu Asd Described Above 266 Note: 267 ( I ) All Ahu’S Shall Be Supplied With Hydrophilic Coating On Fins. 268 ( Ii ) Frame-Work For Coils Of All Ahu’S Shall Ss-304 Constructions. 269 ( Iii ) Motors For All Blowers Shall Be Belt-Less Type ( Direct Driven ) & High Efficiency Eff-1 270 ( Iv ) Efficiency Of Ahu Blowers Shall Be >65% 271 ( V ) The Steam Control Values ( On / Off And Modulating Type ) Shall Be Compatible With Bms And Able To Accept 4-20 272 Fan Coil Units 273 Supply, Installing, Testing And Commissioning Of Vertical, Horizontal Powder Coated Fan Coil Units, Blow Thru Type, Each Complete With 3 Rows Deep Chilled Water Coil & One Or More Centrifugal Fans, Aluminium / Synthetic Cleanable Filters, Primary & Secondary Condensate Drain Pans Duly Insulated, Casing Coil, Piping Connections Through Copper Pipes, Condensate Drain Connection, Wiring, Control Wiring In Conduit Upto The Thermostat Boxes. All Fan Coil Units Shall Be Suitable For 220+ 6% Volts, 50 Cycles Single Phase Power Supply. Fan Coil Unit Shall Be Of Following Arrangements And Refrigeration Capacity. All Fan Coil Units Shall Be With 3 To 5Mm Wg External Static Pressure. The Nosie Level Be Nc 37 For All Rooms. 274 3.0 Tr Nominal Capacity 275 3.0 Tr Nominal Capacity ( 3 Rows Cooling Coil & 2 Rows Heating Coil ) 276 2.5 Tr Nominal Capacity 277 2.5 Tr Nominal Capacity ( 3 Rows Cooling Coil & 2 Rows Heating Coil ) 278 2.0 Tr Nominal Capacity 279 2.0 Tr Nominal Capacity ( 3 Rows Cooling Coil & 2 Rows Heating Coil ) 280 1.5 Tr Nominal Capacity 281 1.5 Tr Nominal Capacity ( 3 Rows Cooling Coil & 2 Rows Heating Coil ) 282 1.0 Tr Nominal Capacity 283 1.0 Tr Nominal Capacity ( 3 Rows Cooling Coil & 2 Rows Heating Coil ) 284 Control Panel For Air Handling Units 285 Supply, Installation, Testing And Commissioning Of The Following Cubicle Type, Dead Front, Sheet Steel, Wall Mounted Control Panels. Wiring And Earthing Terminating Into Mccb In Each Panel Shall Be Provided By The Electrical Contractor.All Internal Wiring And Aluminium Earthing Of Air Handling Unit Motors From The Panel Shall Be Included.All Terrace Control Shall Be Suitable For Outdoor Application Ip 55 / 65The Panel Shall Include The Following Components And Accessories.A. Suitable Rating Incoming Mccb / Mcbb. Suitable Rating Ac-3 Duty Contractor ( S ) , Overload Relay With Builtin Single Phasing Preventor. Star Delta Timer ( For S / D Starters ) .C. 96 Sq.Mm. Digital Voltmeter, Ammeter, Selector Switches, Cts & Control Mcbs.D. Phase Indicating Lights & Control Mcbs.E. Push Buttons For Manual Start / Stop Of Motor.F. On Status Indicating Light For Starter With Control Mcb.G. Minimum 2 Pole Auto / Manual Selector Switchh. Time Delay Relay For Delayed Restart Of Motor.I. 220 / 24V Control Transformer For 2 Way Motorized Valve.J. Interlocking Terminals & Wiring For Fire Damper, Motorized Dampers Etc. As Per Controlk. All Panels With More Than One Outgoing Starter Feeder Shall Be Provided With Separate Mccb / Mcb For Incoming & Outgoingthe Number Of Ahu Control Panels Shall Be As Follows. 286 25 Amps Mpcb, Upto 7.5 Hp Dol Starter. 287 1 No. 32 Amps Incoming Mccb, 2 Nos. 25 Amps Mccbs And 2 Nos. 5 Hp Dol Starters, 1No. 25 Amps Mcb 288 40 Amps Mpcb, 15-20 Hp Star Delta Starters 289 63 Amp Mcpb 25 To 30 Hp Star Delta.Note:- The Selection Contractor And Relay Shall Be Done As Per Type-2 Coordination Chart 290 Axial Flow Fans:Supply, Installation, Testing And Commissioning Of Tube / Vane Axial Fans ( Fans Shall Be Aca Certified ) , Complete With Tefc Motor, Drive And Vibration Isolators, Motor Shall Be Suitable For 415 + 10% Volts, 50 Cycles, 3 Phase Ac Supply And Shall Be High Efficiency Class Eff1 For All The Fans. The Fan Shall Be Low Rpm And Selected For Low Noise Level. Fan Capacities Based On 30-35 Mm Wc Static Pressure, Shall Be As Follows :Note : Fan Installed In Open Area Shall Be Provided With Weather Cowl. Cowl Shall Be Molded To Cover And Overlap The Entire Fan Casing And Base Support To Protect It From Adverse Condition. 291 Pressurization Fans:Lobby Pressurizarion-Cfm-4500, Type / Insulation Class-Vane / Class F, Motor Hp-3 292 Lobby Pressurizarion-Cfm-4600, Type / Insulation Class-Vane / Class F, Motor Hp-3 293 Liftwell Pressurization-Cfm-12000, Type / Insulation Class-Vane / Class F, Motor Hp-10 294 Liftwell Pressurization -Cfm-11300, Type / Insulation Class-Vane / Class F, Motor Hp-10 295 Cooling / Heating Thermostat 296 Supply, Installation, Testing And Commissioning Of Thermostat ( Ahu ) Cooling / Heating. The Thermostat Shall Be Electronic Room Temperature Controller With Digital Display & Fan Speed Control, Capable Of Providing Individual Space Temperature Control For Cooling / Heating Application. The Controller Shall Produce Output To Cooling / Heating Coils In Response To Load Change In Rooms. The Controller Shall Be Designed To Modulate Two Control Services Such As 2 Way Motorized Valves For Chilled / Hot Water Duty. 297 Supply, Installation, Testing And Commissioning Of Snap Acting Thermostat ( Fcu ) Cooling / Heating. The Thermostat Shall Be Electronic Room Temperature Controller With Digital Display & Fan Speed Control, Capable Of Providing Individual Space Temperature Control For Cooling / Heating Application. The Controller Shall Produce Output To Cooling / Heating Coils In Response To Load Change In Rooms. ( Including Wiring From Thermostat To Actuator ) . 298 Control Panels For Fans:Design, Manufacture, Supply, Installation, Testing And Commissioning Of The Following Cubicle Type, Dead Front, Sheet Steel, Wall Mounted Control Panels, Including Anchoring Into The Wall, Wiring Terminating Into Mccb And Copper Earthing, In Each Panel Shall Be Provided By The Electrical Contractor.All Wiring And Copper Earthing Of Motors From The Panel Shall Be Included. All Outgoing Shall Be Provided With Stop / Manual / Auto / Selector Switch To Facilitate Operation Through Bas. All Starters Shall Be Provided With Potential Free Contact For Connections To Building Automation System. 299 The Panel Shall Include The Following Components & Accessories. ( A ) Suitable Rating Incoming Mccb / Mcb ( B ) Suitable Rating Ac-3 Duty Contactor ( S ) , Overload Relay With Builtin Single Phasing Preventor, Star Delta Timer ( For S / D Starters ) . ( C ) 96 Sq. Mm. Digital Voltmeter, Ammeter, Selector Switches, Cts & Control Mcbs. ( D ) Phase Indicating Lights & Control Mcbs. ( E ) Push Buttons For Manual Start / Stop Of Motor. ( F ) On Status Indicating Light For Starter With Control Mcb. ( G ) Minimum 2 Pole Auto / Manual Selector Switch & 1 No + 1 Nc Potential Free Aux. Contacts For Use By Building Automation System. ( H ) Time Delay Relay For Delayed Restart Of Motor ( I ) Interlocking Terminals & Wiring For Fire Damper, Motorized Dampers Etc. As Per Control Scheme.The Number Of Control Panels Shall Be As Follows 300 25 Amps Mpcb, Upto 7.5Hpdolstarter. 301 32 Amps Mpcb, 10 / 12.5 Hp Star Delta Starters 302 Supplying, Installing, Testing And Commissioningofultrasonic Humidifier ( For Operation Theatre Air Handling Units Identified Below ) , Complete With Stainless Steel Tank With Float Valve, Water Makeup, Overflow And Drain Connections.The Transducer Shall Be Interlocked With Float Switch, Supplied With Humidifier, And Humidistat.Necessary Potential Free Contacts Shall Be Provided For Bms Operation. 303 Ahu No-Positive Window Minor Ot, Ahu Capacity-2550, Humidifer Capacity-10 Lph 304 Ahu No-Positive Window Ot, Ahu Capacity-3700, Humidifer Capacity-10 Lph 305 Ahu No-Icu Room, Ahu Capacity-2500, Humidifer Capacity-10 Lph 306 Piping-Chilled Water, Hot Water:Providing And Fixing In Position The Following Ms Heavy Class ( C ) Pipes Cut To Required Lengths And Installed With All Welded Joints, Providing And Fixing In Position The Necessary Fittings Like Elbows, Tees And Reducers, Mating Flanges & Sockets For Bas: 307 200 Mm Dia 308 150 Mm Dia 309 125 Mm Dia 310 100 Mm Dia 311 80 Mm Dia 312 65 Mm Dia 313 50 Mm Dia 314 40 Mm Dia 315 32 Mm Dia 316 25 Mm Dia 317 20 Mm Dia 318 Supply, Installation, Testing & Commissioning Of Manual Butterfly Valves With Matching Flangeswith Feasibility Of Changing The Inner Lining If Wornouthandles With Lockage.Pressure Rating - Pn-16 319 150 Mm Dia 320 125 Mm Dia 321 100 Mm Dia 322 80 Mm Dia 323 65 Mm Dia 324 50 Mm Dia 325 40 Mm Dia 326 32 Mm Dia 327 25 Mm Dia 328 20 Mm Dia 329 Supply And Fixing The Following Ball Valves Without Strainer All As Specified & As Directed By Engineer-In-Charge 330 25 Mm Dia 331 20 Mm Dia 332 Supply, Installation, Testing & Commissioning Of Ball Valve With Strainerall As Specified & As Directed By Engineer-In-Charge 333 32 Mm Dia 334 25 Mm Dia 335 20 Mm Dia 336 Supply, Installation, Testing & Commissioning Of Globe Valveall As Specified & As Directed By Engineer-In-Charge 337 25 Mm Dia 338 20 Mm Dia 339 Providing And Fixingthe Following ‘Y’ Strainers In Position Rating Pn-16 340 50 Mm Dia 341 40 Mm Dia 342 32 Mm Dia 343 25 Mm Dia 344 20 Mm Dia 345 Supply, Installation, Testing And Commissioning Of Two Way Modulating Valves ( Ahu ) Provided With Spring Return Function & Fitted With Modulating Actuatorsin Chilled Water Return Lines At Each Air Handling Unit. The Actuator Shall Have Required Shut Off Capability Of Minimum 4 Bar Rating. The Valves & Actuators For Ahu’S Shall Be Compatible With Building Automation System. The Actuator Shall Be Provided With Interface Cards To Receive 0-10V Or 4-20 Ma Signal From Building Automation System.The Valve Shall Be Suitable For Following Pipe Sizes And Provided With Matching Flanges And Accessories. 346 65 Mm Dia 347 50 Mm Dia 348 40 Mm Dia 349 32 Mm Dia 350 25 Mm Dia 351 20 Mm Dia 352 Supply, Installation, Testing And Commissioning Of Pressure Independent Balancing Cum 2 Way Control Valve Provided With Spring Return Function In Chilled Water Lines At Each Fan Coil Unit. The Actuator Of The Motorized Valve Shall Have Required Shut Off Capability Of Minimum 4 Bar Rating With 230 V / 24 V Transformer Duly Encased And Wired.The Valves Shall Be Suitable For Following Pipe Sizes 353 25 Mm Dia 354 20 Mm Dia 355 Supplying, Installation, Testing And Commissioningof 19 Mm Auto Air Vents 356 Supplying And Fixing In Position Ss 304 The Industrial Dial Type Pressure Gauges With Gun Metal Valves. 357 Providing And Fixing Inposition Ss 304Themercury-In- Glass Industrial Dial Type Thermometers. 358 Providing And Fixing In Position The Drain- Cock With Ball Valve 25 Mm Dia 359 Providing And Fixing In Position The Following Pvc Pipes For Drain Cut To Required Lengths And Installed With All Screwed Joints, And Providing And Fixing In Position The Necessary Elbows, Tees And Reducers As Per Specifications. 360 40 Mm Dia Pipes 361 32 Mm Dia Pipes 362 25 Mm Dia Pipes 363 20 Mm Dia Pipes 364 Supplying And Fixing In Position Automatic Balancing Valves In Position Conforming To Technical Specifications Pressure Rating-Pn-16: 365 150 Mm Dia 366 125 Mm Dia 367 100 Mm Dia 368 80 Mm Dia 369 65 Mm Dia 370 50 Mm Dia 371 40 Mm Dia 372 32 Mm Dia 373 25 Mm Dia 374 20 Mm Dia 375 Supply, Installation, Testing And Commissioning Of Motorised Butterfly Valve ( Modulating ) Of Following Sizes With Counter Flanges And Accessories Pressure Rating - Pn-16 376 50 Mm Dia 377 40 Mm Dia 378 32 Mm Dia 379 25 Mm Dia 380 20 Mm Dia 381 Air Distribution 382 Supply, Fabrication, Installation And Testing Of Sheet Metal Ducts ( Factory Fabricated Ducts ) In Accordance With The Approved Shop Drawings And As Required By The Specifications. 383 Maximum Duct Size-1-750 Mm Gauge-26, Joint Type- C & S Connector 384 Maximum Duct Size-751-1000 Mm Gauge-24, Joint Type- Tdf Flange. 385 Maximum Duct Size-1001-1200 Mm Gauge-22, Joint Type- Tdf Flange, Bracing Spacing-Jtr Or Zee Bar 386 Maximum Duct Size-1201-2100 Mm Gauge-20, Joint Type- Tdf Flange, Bracing Spacing- Jtr Or Zee Bar 387 Maximum Duct Size-2101-2400 Mm Gauge-18, Joint Type- Tdf Flange, Bracing Spacing- Jtr Or Zee Bar 388 Maximum Duct Size-2401-Above Mm Gauge-16, Joint Type- Tdf Flange, Bracing Spacing- Jtr Or Zee Bar 389 Supply, Fabrication, Installation And Testing The Flexible Connections Constructed Of Fire Resistance Flexible Double Canvas Sleeve As Per The Approved Shop Drawings. 390 Supply, Installation And Testing Of Galvanised Steel Construction Louver Dampers Within Ducts To Be Provided With Suitable Ducts Lever And Quadrants For Manual Control Of Volume Of Air Flow And For Proper Balancing Of The Air Distribution System.As Per The Approved Shop Drawings And Specifications. 391 Supply, Installation, Testing And Commissioning Of Motorised Combined Smoke & Fire Damper Complete With Control Panel, Inter Connecting Wiring At Locations Shown In Approved Shop Drawings And Specifications. 392 Smoke & Fire Dampers. 393 Control Panel & Wiring , Actuators 394 Supply, Installation, Testing And Balancing Of Powder Coated Extruded Aluminium Supply Air Grilles With Volume Control Dampers In Accordance With The Approved Shop Drawings And Specifications. With Horizontal Fixed Bars 395 Supply, Installation, Testing And Balancing Of Air Grilles Without Volume Control Dampers For Return / Exhaust Air In Accordance With The Approved Shop Drawings And Specifications. With Horizontal Fixed Bars Powder Coated Extruded Aluminium. 396 Supply, Installation, Testing And Balancing Of Square Shape Ceiling Diffusers With Removable Core & Anti Smudge Ring & Volume Control Dampers As Per Approved Drawings And Specifications. Powder Coated Extruded Aluminium Construction. 397 Supply, Installation, Testing And Balancing Ofpowder Coated Square Shape Return Air Diffusers With Removable Core, Antismudge Ring & Without Volume Control Damper As Per Approved Shop Drawings & Specifications. Powder Coated Extruded Aluminium Construction. 398 Supply, Fabrication, Installation And Testing Of The Insulated Flexible Duct , Complete With Connecting Rings, Duct Supports Etc As Per Standards And Specification Of Following Sizes:- 399 250 Mm Dia 400 200 Mm Dia 401 100 Mm Dia 402 150 Mm Dia 403 Supplying & Fixing Of Opposed Blade Volume Control Dampers In Supply Air Duct Collars As Per Approved Shop Drawings And Specifications. 404 Supply, Installation, Testing And Balancing Of Inlet Air Louvers With Bird Screen And Volume Damper For Fresh Air, As Per Approved Shop Drawings & Specifications. Powder Coated / Anodised Extruded Aluminium Construction. 405 Supply, Installation, Testing And Balancing Of Louvers With Bird Screen For Exhaust Air As Per Approved Shop Drawings & Specifications. Powder Coated / Anodised Extruded Aluminium Construction. 406 Supply And Handing Over To Client ( As Spare ) Of 600 Mm X 600 Mm X 150 Mm ( Deep ) Hepa Filters ( Efficiency 99.97% Down To 0.3 Microns ) 407 Supply, Installation, Testing And Commissioning Of Back Draft Dampers In Pressurization Fans 408 Supply, Fabrication, Installation And Testing Kitchen Exhaust Ducting Of Sheet 16 G Mild Steel. Suitable Access Doors Shall Be Provided At Every 3M. 409 Thermal Insulation 410 Supply, Installation And Testing Of Acoustic Lining With Neoprene Faced Fibreglass In Supply And Return Air Ducts As Per The Specifications.All Ducts Shown Cross Hatched On The Approved Shop Drawings Shall Be Provided With Acoustic Lining As Per The Specifications: 411 25 Mm Thick 412 50 Mm Thick 413 Supplying, Installing And Testing Of 19 Mm Thick Insulation With Protective Coating On Chilled Water And Condensate Drain Piping And Fitting Like Valves, Flanges Union, Etc.As Per The Approved Shop Drawings And Specifications, The R Value Should Be Minimum R-0.35: 414 25 Mm Dia Pipes 415 20 Mm Dia Pipes 416 40 Mm Dia Condensate Drain Pipes. 417 32 Mm Dia Condensate Drain Pipes 418 25 Mm Dia Condensate Drain Pipes 419 20 Mm Dia Condensate Drain Pipes 420 Supply, Installation And Testing Of 25 Mm Thick Insulation With Protective Coating On Chilled Waterpipes And Fittings Like Valves, Flanges And Unions, Etc. As Per Approved Drawings And Specifications, The R Value Should Be Minimum R-0.35 For The Following:- 421 100 Mm Dia Pipes 422 80 Mm Dia Pipes 423 65 Mm Dia Pipes 424 50 Mm Dia Pipes 425 40 Mm Dia Pipes 426 32 Mm Dia Pipes 427 Supply, Installation And Testing Of 32 Mm Thick Insulation With Protective Coating On Chilled Water Pipes And Fittings Like Valves, Flanges And Unions, Etc. As Per The Approved Shop Drawings & Specifications, The R Value Should Be Minimum R-0.35: 428 200 Mm Dia Pipes 429 150 Mm Dia Pipes 430 125 Mm Dia Pipes 431 Water Cooled Chilled Water Units 432 Supply, Installation, Testing, Connection And Participation In Commissioning Of Screw Water Chilling Units Each Complete With 150 Tr Actual Capacity ( 300 Tr Plant Capacity ) At Specified Conditions, Screw Compressor, Motor, Starter Panel Machine Mounted, Water Cooled Condenser, Insulated Chiller, Flow Switch At Chiller And Condenser, Vibration Isolators, Integral Refrigerant Piping And Wiring, Accessories As Required And Called For, Automatic And Safety Controls Mounted In Central Micro-Processor Based Console Panel And All Mounted On A Steel Frame Complete As Per Specifications. Motor Shall Be Suitable For 415±10% 50 Cycles. 3 Phase Ac Supply. Refrigerant Used Shall Be Ozone Friendly R-134A / R-123 As Detailed In Specifications. The Chilling Unit Shall Be Compatable With Bms System.Chillerchilled Water In 54 Deg Fchilled Water Out44 Deg Ffouling Factor0.0005Condensercondenser Water In87 Deg Fcondenser Water Out 97 Deg Ffouling Factor 0.001Minimum Cop 5.4Iplv 6.17Should Confirm To Ari 550 / 590-1998Refrigerantr-134A / R-123 433 Supplying, Installing, Testing And Commissioning Of Pn16 Rated Axial Split Coupled Vertical Inline Pump Complete With Ci Casing, Bronze Impeller ( As Per Specifications ) , Ss 416 Shaft, Mechanical Seal ( Should Be Easily Replaceable Without Disturbing The Pump Shaft And Motor Shaft ) . The Pump Motor Shall Be Suitable For 415 ± 10% Volts, 50 Cycles, 3 Phase Power Supply. The Motor Selected Shall Be Energy Efficient Having Efficiency ( Class I ) At Full Load Ranging Between 91.5% To 94% In Accordance With Motor Rating As Per Specification. Minimum Pump Efficiency Shall Be 75%.The Motor Of Pumps Shall Be Suitable For Operation On Variable Frequency Drive And Confirm To Eff1 / Ie2. Variable Application Pump To Be Provided With Ip55 Motor Mounted Integrated Vfd For Sensorless / Wireless Control And Vfd Should Be Capable To Vary Till 60Hz To Meet The Desired Duty Parameters.2 Nos Of Wireless Sensors Must Be Considered For Each Zone And If Any Wiring Required To Pump Controller Shall Be Included In Cost. Motor Mounted Integrated Vfd Should Be Pre-Wired To Motor From The Oem Factory For Unit Responsibility.All Pumps Shall Be Properly Aligned At ManufacturerS Facility. The Pumps Are Compatable With Bms System. Separate Controller With Ip54 Protection To Be Provided For Controlling Chilled Water Pump And Motorised By Pass Valve To Maintain The Minimum Flow Through Chiller In Case Of Load Variation Is Below The Minimum Flow Of Chillers.The Quoted Price Shall Include Cost Of Thermal Insulation And Cladding For Chilled Water Pumps.Pumps Shall Be Selected As Per Following Parameters; 434 Primary Chilled Water Pumps ( Including One As Standby ) For Chilling Units Flow Rate = 360 Usgpm, Pump Head= 15M Of Water Column, Pump Motor Hp = 7.5 Hp. 435 Condenser Water Pumps ( Including One As Standby ) Flow Rate= 450 Usgpm, Pump Head =18M Of Water Column, Pump Motor Hp =12.5 Hp 436 Secondary Chilled Water Pumps Suitable For Operation With Vfd ( Including One As Standby ) For Zone A, Hospital Blocks Flow Rate= 488 Usgpm, Pump Head = 30M Of Water Column, Pump Motor Hp = 20 Hp 437 Secondary Chilled Water Pumps Suitable For Operation With Vfd ( Including One As Standby ) For Zone B Including Ot Block And Icu Block Flow Rate = 235 Usgpm, Pump Head = 25M Of Water Column, Pump Motor Hp =10 Hp 438 Primary Hot Water Pumps ( Including One As Standby ) For Hot Water Generator Flow Rate = 50 Usgpm, Pump Head = 15M Of Water Column, Pump Motor Hp = 2.0 Hp 439 Secondary Hot Water Pumps Suitable For Operation With Vfd ( Including One As Standby ) For Zone B Including Ot Block And Icu Block Flow Rate = 66 Usgpm, Pump Head = 25M Of Water Column, Pump Motor Hp = 3 Hp 440 Cooling Towersupply, Installation, Testing And Commissioning Of Induced Draft Cooling Towers For Air Conditioning System. Each Tower Shall Be Complete With Frp Basin, Mounted On Structural Steel Rail Supports With Spring Vibration Isolators. Casing, Distribution System, Twin Cell, Filling, Louvers, Osho Approved Access Ladders & Platforms, Electronic Water Level Control, Fan And Motor. Motor Shall Be Suitable For Operation On Vfd And Rated For 415±10% Volts, 50 Cycles, 3 Phase Power Supply, Isolator Panel At Cooling Tower And Earthing, Shall Also Be Included. The Noise Level Shall Not Exceed 60 Dba At A Distance Of 15 Meter From The Cooling Tower And It Must Be Ensured That No Noise & Vibrations Under Any Circumstances Gets Transmitted Surroundings. Tower For Air Conditioning System Shall Be Selected On The Basis Of Water Temperature 87-97° F, Ambient Wet Bulb 80° F And Nominal Capacity Shall Be As Follows. Cooling Tower For ( 300 Tr Plant Capacity ) Plant Having Flow Rate Of 450 Usgpm Each @ 87-97° F Water Temperature ( 200 Tr Each ) 441 Hot Water Generatorsupply, Installation, Testing And Commissioning Ofelectric Hot Water Generator Of Following Matching Electrical Immersion Heater Banks.All Automatic And Safety Controls Such As Manual Reset, High Temperature Cut Off, Step Electrical Panel Mounted On Generator Frame Complete With Internal Wiring, Contractors, Interconnecting Cables Between Panel And Heater.Thermometers And Pressure Gauges At Inlet And Outlet Of Electric Hot Water Generator.Hot Water Generator As Described Above Of Capacity 100 Kw ( Including One As Standby ) Inlet Water Temperature 100 °Foutlet Water Temperature120 °Fflow Rate= 50 Gpmno. Of Steps = 8Smallest Heater Bank Shall Be 25 Kwchilled / Hot Water Expansion Tank 442 Supplying, Installing, Testing And Commissioning Of Ms Construction Open Typeexpansion Tankwith Valves Along With Necessary Accessories 443 Expansion Tank Of Size 1.0 Mx1.0 Mx 1.0 M For Chilled Water System 444 Expansion Tank Of Size 0.5 Mx 0.5 Mx 0.5 M For Hot Water System 445 Main Hvac Panel-Plant Roomdesign, Manufacturing, Supply, Installation, Testing & Commissioning Of The Following Panels Suitable For Operation On 415V, 3 Phase, 4 Wire, 50 Hz. Supply System.The Panel Shall Be Indoor, Free Standing, Floor / Wall Mounted, Sheet Metal Enclosed, Cubicle Type, Dust & Vermin Proof, Fully Compartmentalized ( Form-4B ) Made Out Of 2Mm With 14 Swgcrca Sheet Steel Complete With Aluminium Bus Bars, Powder Coating, Necessary Wiring, Cable Glands Etc.The Scope Of Work Also Include Necessary Power & Control Cabling, Complete Interlocking Between All Equipments As Per Sequence Of Operation, Earthing Of Equipments, Cable Trays, End Terminations Etc. The Panel Shall Be Suitable For Top And Bottom Entry Both. Cabling & Earthing On To The Incomer Shall Be Provided By The Electrical Contractor.All Motor Feeder Incomers Shall Be Suitable For Motor Duty Application.All Starter Feeders Shall Be Equipped With Minimum 2 Pole Auto / Manual Selector Switch & 1 No + 1 Nc Potential Free Aux. Contacts For Use By Building Automation System & Comprising Of The Following:Incomer -1 & 2 ( From Different Sections Of Main Lt Distribution Panel ) 800 Amps ( 50Ka ) 4P Edo Typeair Circuit Breaker With Built In Overload, Short Circuit, Earth Fault, Under Voltage And Over Voltage Microprocessor Based Release With Minimum 10 Trip History Data With Led / Lcd Display Unit And Measurment As Per Specification And With Following Accessoriesnote: The Two Incomers Of Panel Shall Be Electrically Interlocked In Such A Way That Only One Multifuction Meter Of Accuracy Class-I, With 3 Nos. 800 / 5 Amps, Cl-1, 10Va Cts To Measure Real Time 446 Main Hvac Panel-Plant Roomdesign, Manufacturing, Supply, Installation, Testing & Commissioning Of The Following Panels Suitable For Operation On 415V, 3 Phase, 4 Wire, 50 Hz. Supply System.The Panel Shall Be Indoor, Free Standing, Floor / Wall Mounted, Sheet Metal Enclosed, Cubicle Type, Dust & Vermin Proof, Fully Compartmentalized ( Form-4B ) Made Out Of 2Mm With 14 Swgcrca Sheet Steel Complete With Aluminium Bus Bars, Powder Coating, Necessary Wiring, Cable Glands Etc.The Scope Of Work Also Include Necessary Power & Control Cabling, Complete Interlocking Between All Equipments As Per Sequence Of Operation, Earthing Of Equipments, Cable Trays, End Terminations Etc. The Panel Shall Be Suitable For Top And Bottom Entry Both. Cabling & Earthing On To The Incomer Shall Be Provided By The Electrical Contractor.All Motor Feeder Incomers Shall Be Suitable For Motor Duty Application.All Starter Feeders Shall Be Equipped With Minimum 2 Pole Auto / Manual Selector Switch & 1 No + 1 Nc Potential Free Aux. Contacts For Use By Building Automation System & Comprising Of The Following:Incomer -1 & 2 ( From Different Sections Of Main Lt Distribution Panel ) 800 Amps ( 50Ka ) 4P Edo Typeair Circuit Breaker With Built In Overload, Short Circuit, Earth Fault, Under Voltage And Over Voltage Microprocessor Based Release With Minimum 10 Trip History Data With Led / Lcd Display Unit And Measurment As Per Specification And With Following Accessoriesnote: The Two Incomers Of Panel Shall Be Electrically Interlocked In Such A Way That Only One Multifuction Meter Of Accuracy Class-I, With 3 Nos. 800 / 5 Amps, Cl-1, 10Va Cts To Measure Real Time 447 Real Timetotal Active Energy ( Kwh / Mwh ) Maximum Demand ( Kva / Mva ) ( Kw / Mw ) Maximum Demand Reset Count.Instantaneous Power Factorlogging Of Active Energy Eight Time Of A Daycurrentvoltagefrequency / Harmonicsbreaker On / Off / Trip Indicating Lights With Control Mcb’S.Bus Bar1000 Amps Tpn ( 50 Ka ) , 91E Grade Aluminium Bus Bars With Insulated Colour Coded Heat.Outgoingthree ( 3 ) Nos. 315 Amps Tpn, Mccb, 50Ka, To 100Kw Starter Of 150Tr Chiller. Each Of Three ( 3 ) Nos. 315 Amps Tpn, Mccb, 50Ka, To 100Kw Hot Water Generator ( Hwg ) Pump. Three ( 3 ) Nos. 32 Amps, TpnmpcbSto 7.5 Hp As An Outgoing Feeders To 1 No. Primary Two ( 2 ) Nos. 63 Amps, TpnmpcbSto 20 Hp Vfd Complete As Required As An Outgoing Two ( 2 ) Nos. 32 Amps, TpnmpcbSto 10 Hp Vfd Complete As Required As An Outgoing Three ( 3 ) Nos. 40 Amps TpnmpcbS , 12.5 Hp, As An Outgoing Feeders To 1 No. Condensor Two ( 2 ) Nos. 20 / 25 Amps TpnmpcbS, For 3.0 Hp Vfd Complete As Required As An Outgoing Three ( 3 ) Nos. 16 / 20 Amps TpnmpcbS, For 2.0 Hp, As An Outgoing Feeders To 1 No. Primary Two ( 2 ) Nos. 32 Amps Tpn MpcbS, 10 Hp, As An Outgoing Feeders To 1 No. Cooling Tower 448 Sparesspare Space For One ( 1 ) No. 630 Amps Tpn, Mccb, 50Ka, There Shall Be Space To Accommodate The Vfd In Compartment.Two ( 2 ) Nos. 63 Amps Tpn MccbS For Space To Accommodate 15 Hp Star Delta Starters.Three ( 3 ) Nos. 32 Amps Tpn MpcbS For Space To Accommodate Dol Starters.Motor Control Centre As Described Above ( Kindly Refer Sld Before Manufacturing The Panels ) Notes:1 ) All Incoming & Outgoing Shall Be Bms Compatability.1 ) MccbS Shall Be Motor Duty And Suitable For 50 Ka ( Ics ) Fault Current.2 ) Both Incomers Shall Be Electrically Interlocked.3 ) Necessary Cable Alleys, Space For Spare Switches, Internal Wiring, Control Wiring / Cabling And Copper Earthing Of All Equipment Shall Also Be Included. All Mcb’S / Mccb’S Shall Be Motor Duty Rating.4 ) All Mccb’S Shall Be With Neutral Link.5 ) The Final Selection Of Relay, Contactor And Timer Shall Be Done As Per Type-2 Coordination Chart.6 ) There Shall Be Sufficient Space To Accommodate The Vfd In Line With Breaker Wherever It Is Required Within The Panel. 449 Piping - Chilledwater & Condenserwatersupply And Fixing In Position The Following Ms Heavy Class ( C ) Pipes Cut To Required Lengths And Installed With All Welded Joints, Providing And Fixing In Position The Necessary Fittings Like Elbows, Tees And Reducers, Mating Flanges & Sockets For Following:- 450 200 Mm Dia 451 150 Mm Dia 452 125 Mm Dia 453 100 Mm Dia 454 80 Mm Dia 455 65 Mm Dia 456 40 Mm Dia 457 25 Mm Dia 458 Supply, Installation, Testing And Commissioning Of Motorised Butterfly Valve ( Modulating ) Of Following Sizes With Counter Flanges And Accessories Pressure Rating - Pn-16 459 150 Mm Dia 460 125 Mm Dia 461 100 Mm Dia 462 Supply, Installation, Testing & Commissioning Of Manual Butterfly Valves With Matching Flanges. The Valves Should Have Feasibility Of Changing The Inner Lining If Wornout And The Handles Should Have Lockable Facility. Pressure Rating - Pn-16 463 200 Mm Dia 464 150 Mm Dia 465 125 Mm Dia 466 100 Mm Dia 467 80 Mm Dia 468 65 Mm Dia 469 40 Mm Dia 470 25 Mm Dia 471 Supplying And Fixingthe Following Dual Plate Check Valves With Pressure Rating - Pn-16 Matching Flanges In Position Conforming To Technical Specifications For Following Due: 472 150 Mm Dia 473 125 Mm Dia 474 100 Mm Dia 475 Supply And Fixingthe Following ‘Y’ Strainers In Position Pressure Rating - Pn-16 Conforming To Technical Specifications: 476 150 Mm Dia 477 125 Mm Dia 478 100 Mm Dia 479 Supply And Fixing In Position The Following Automatic Back Wash Type Pot Strainers : 480 200 Mm Dia Pipes-Chilled Water 481 200 Mm Dia Pipes-Condenser Water 482 Supply, Installation, Testing And Commissioning Of Flexible Connections Of Suitable Pressure Rating To Be Installed At Pumps, Chillers, Suction, Discharge And At Pipes Crossing Building Expansion Joints. 483 150 Mm Dia Pipes 484 125 Mm Dia Pipes 485 100 Mm Dia Pipes 486 Supplying, Installation, Testing And Commissioningof 19 Mm Auto Air Vents 487 Supplying And Fixing In Position Ss 304 The Industrial Dial Type Pressure Gauges With Gun Metal Valves. 488 Supplying And Fixing In Position Ss 304 The Mercury-In- Glass Industrial Dial Type Thermometers. 489 Supplying And Fixing In Position The Drain- Cock With Ball Valve 25 Mm Dia 490 Supplying And Fixing In Position Automatic Balancing Valves Pressure Rating - Pn-16 In Position Conforming To Technical Specifications For The Following: 491 150 Mm Dia 492 125 Mm Dia 493 Piping - Hotwater : Providing And Fixing In Position The Following Ms Heavy Class ( C ) Pipes Cut To Required Lengths And Installed With All Welded Joints, Providing And Fixing In Position The Necessary Fittings Like Elbows, Tees And Reducers, Mating Flanges & Sockets For Bas: 494 80 Mm Dia 495 65 Mm Dia 496 50 Mm Dia 497 Supply, Installation, Testing And Commissioning Of Motorised Butterfly Valve With Pressure Rating – Pn-16 ( Modulating ) Of Following Sizes With Counter Flanges And Accessories 498 65 Mm Dia 499 25 Mm Dia 500 Supply, Installation, Testing & Commissioning Of Manual Butterfly Valves With Pressure Rating - Pn-16 Matching Flanges. The Valves Should Have Feasibility Of Changing The Inner Lining If Wornout And The Handles Should Have Lockable Facility. 501 65 Mm Dia 502 25 Mm Dia 503 Supply And Fixingthe Following Dual Plate Check Valves With Pressure Rating - Pn-16 Matching Flanges In Position Conforming To Technical Specifications : 504 65 Mm Dia 505 Supply And Fixingthe Following ‘Y’ Strainers Pressure Rating - Pn-16In Position Conforming To Technical Specifications: 506 65 Mm Dia 507 Supply And Fixing In Position The Following Automatic Back Wash Type Pot Strainers Of Size 65 Mm Dia 508 Supply, Installation, Testing And Commissioning Of Flexible Connections Of Suitable Pressure Rating To Be Installed At Pumps, Hot Water Generator, Suction, Discharge And At Pipes Crossing Building Expansion Joints. 509 65 Mm Dia Pipes 510 Supplying, Installation, Testing And Commissioningof 19 Mm Auto Air Vents 511 Providing And Fixing In Position Ss 304 The Industrial Dial Type Pressure Gauges With Gun Metal Valves. 512 Providing And Fixing In Position Ss 304 The Mercury-In- Glass Industrial Dial Type Thermometers. 513 Providing And Fixing In Position The Drain- Cock With Ball Valve 20 Mm Dia 514 Providing And Fixing In Position Automatic Balancing Valves Pressure Rating - Pn-16 In Position Conforming To Technical Specifications 65 Mm Dia 515 Thermal Insulation 516 Supply, Installation And Testing Of 25 Mm Thick Insulation With Protective Coating On Chilled Water, Hot Water Pipes And Fittings Like Valves, Flanges And Unions, Etc. As Per For Following Pipes Approved Shop Drawings And Specifications, The R Value Should Be Minimum R-0.35: 517 100 Mm Dia Pipes 518 80 Mm Dia Pipes 519 65 Mm Dia Pipes 520 Supply, Installation And Testing Of 32 Mm Thick Insulation With Protective Coating On Chilled Water, Hot Water Pipes And Fittings Like Valves, Flanges And Unions, Etc. As Per The Approved Shop Drawings & Specifications, The R Value Should Be Minimum R-0.35: 521 200 Mm Dia Pipes 522 150 Mm Dia Pipes 523 125 Mm Dia Pipes 524 Supply, Installation And Testing Of Insulation In Trench / Buriedchilled & Hot Water Pipes And Fittings Etc. As Per The Approved Shop Drawings & Specifications, The R Value Should Be Minimum R-0.35: 525 150 Mm Dia Pipes 526 100 Mm Dia Pipes 527 65 Mm Dia Pipes 528 Air Conditioning Plant 529 Supply, Install, Commissioning And Testing Of Commercial Air Curtain Unit For Preventionofdust And Conditioned Air Losses, Single Phase, 220 V, 50 Hz, Made Out Of Ms / Crca Sheet Of Minimum Thickness 18 Gauge Finished With Two Coats Of Red Oxide Primer And Final Coat Of Synthetic Enamel Paint ( Oven Baked ) With Ms - Crc 18 Gauge Square Perforated Suction Grills, Aluminium Alloy Fans And Single Phase Electric Motor, Nozzles Etc, Complete With Fittings And Accessories So As To Produce 1 - 1.5 M / Sec Air Velocity At Floor Level For Door Opening As Specified. 530 In Ot Of Size -2400X2500mm Door Size 531 In Icu Of Size -2400X2500mm Door Size 532 In Nicu Of Size- 2400X2500mm Door Size 533 Axial Flow Fans 534 Supply, Installation, Testing And Commissioning Of Tube / Vane Axial Fans ( Fans Shall Be Amca Certified ) , Complete With Tefc Motor, Drive And Vibration Isolators. Motor Shall Be Suitable For 415 ± 10% Volts, 50 Cycles, 3 Phase Ac Supply And Shall Be High Efficiency Class Eff1 For All The Fans.The Fan Shall Be Low Rpm And Selected For Low Noise Level. Fan Capacities Based On 35 Mm Wc Static Pressure ( 25Mm For Toilet Exhaust Fans And Llb Fans ) , Shall Be As Follows :Note: Fan Installed In Open Area Shall Be Provided With Weather Cowl. Cowl Shall Be Molded To Cover And Overlap The Entire Fan Casing And Base Support To Protect It From Adverse Condition. 535 Toilet Exhaust Fans 536 Toilet Exhaust Fan ( Cfm 420 ) 537 Toilet Exhaust Fan ( Cfm 770 ) 538 Toilet Exhaust Fan ( Cfm 1350 ) 539 Toilet Exhaust Fan ( Cfm 3915 ) 540 Toilet Exhaust Fan ( Cfm 1210 ) 541 Toilet Exhaust Fan ( Cfm 1210 ) 542 Toilet Exhaust Fan ( Cfm 2200 ) 543 Toilet Exhaust Fan ( Cfm 650 ) 544 Toilet Exhaust Fan ( Cfm 1407 ) 545 Toilet Exhaust Fan ( Cfm 560 ) 546 Toilet Exhaust Fan ( Cfm 2700 ) 547 Toilet Exhaust Fan ( Cfm 1700 ) 548 Toilet Exhaust Fan ( Cfm 2950 ) 549 Toilet Exhaust Fan ( Cfm 1300 ) 550 Toilet Exhaust Fan ( Cfm 1070 ) 551 Toilet Exhaust Fan ( Cfm 800 ) 552 Toilet Exhaust Fan ( Cfm 935 ) 553 Toilet Exhaust Fan ( Cfm 990 ) 554 Toilet Exhaust Fan ( Cfm 1025 ) 555 Laundary Exhaust Fan ( Cfm 7700 ) 556 Laundary Exhaust Fan ( Cfm 7700 ) 557 Plantroom Fans 558 Hvac Plant Room Exhaust ( Cfm 13000 ) 559 Hvac Plant Room Supply ( Cfm 13000 ) 560 Plumbing Plant Room Exhaust ( Cfm 3400 ) 561 Plumbing Plant Room Supply ( Cfm 3400 ) 562 Ltroom Exhaust ( Cfm 10000 ) 563 Lt Room Supply ( Cfm 10000 ) 564 Stp Exhaust Fan ( Cfm 10300 ) 565 Stp Supply Fan ( Cfm 10300 ) 566 Etp Exhaust Fan ( Cfm 6300 ) 567 Etp Supply Fan ( Cfm 6300 ) 568 Supplying, Installing, Testing And Commissioning Of Inline Fans Suitable For Installing In Any Position In Vertical Or Horizontal Ducts. The Casing Shall Be Double Skin, Internally Acoustically Lined And Constructed Of Galvanised Steel. The Fan Shall Be Didw With Forward Curve Impeller Fitted With Maintenance Free External Rotor Motor. The Motor Shall Be Suitable For 220±10% Volt Single Phase 50 Cycles Ac Supply. 569 Cssd-Autoclave-Basement ( Cfm 465 ) 570 Autopsy-Basement ( Cfm360 ) 571 Specimen Store-Pathology ( Cfm 250 ) 572 Specimen Cubicals-Pathology ( Cfm 220 ) 573 Stool, Urine &Exam-Pathology ( Cfm 240 ) 574 Sluice- Delivery Rooms-Ff ( Cfm 170 ) 575 Hp Sterilizer Room ( Cfm 400 ) 576 Haemat Lab ( Cfm 300 ) 577 Histology Lab ( Cfm 300 ) 578 Chemical Lab-1 ( Cfm 300 ) 579 Other Serological Lab ( Cfm 400 ) 580 Blood Screening Lab ( Cfm 650 ) 581 Delivery Room ( Cfm 360 ) 582 Autoclave ( Cfm 230 ) 583 Pantry-Block C- G Fl ( Cfm 200 ) 584 Second Floor 585 Du / Sl- Block B ( Cfm 215 ) 586 Dirty Utility- Block B ( Cfm 240 ) 587 Dirty Utility- Block D ( Cfm 400 ) 588 Third Floor 589 Dirty Utility-Block B ( Cfm 265 ) 590 Soiled Linen &Du Block D ( Cfm 310 ) 591 Toilet Exhaust Fans 592 Second Floor -Block A ( Cfm 1100 ) 593 Toilet Exhaust -Sf-Block C ( Cfm 160 ) 594 Toilet Exhaust -Ff-Block E ( Cfm 250 ) 595 Supplying, Installing, Testing And Commissioning Of Direct Driven Propeller Fans For Exhaust Air As Shown In Drawings. Each Fan Shall Be Complete With Permanent Split Capacitor Or Shaded Pole Motor, Mounting Plate, Accessories Like Wire Guard, Bird Screen And Fixed Louvers For Weather Protection As Required. Fan Selection Arrangement And Electrical Characteristics Shall Be As Follows : 596 225 Mm Dia 900 Rpm Fan Suitable For 220±6% Volts 50 Cycles, 1 Phase Ac Supply. 597 300 Mm Dia 900 Rpm Fan Suitable For 220±6% Volts 50 Cycles, 1 Phase Ac Supply. 598 Supply, Installation, Testing And Commissioning Of Electrostatic Type Kitchen Exhaust Air Cleaner ( Dry Scrubber ) Complete With The Following Accessories, Components Etc. Making It A Completely Functional Dry Scrubber Suitable For Kitchen Hood Exhaust. 599 1. Casing - Shall Be Made Of 0.63 Mm Galvanized Pre-Plasticized / Powder Coated Sheet On Outside And 0.63 Mm Gi Sheet Inside With Puf Foam Of 36 Kg / M3 Density Insulation In Between Sheets To Make 25 Mm Thick Panels.2. Pre Filter Section With Wire Mesh Ss Filters For Coarse Particle Removal3. Electrostatic Precipitator Section - Electrostatic Section Shall Be Made Of 16 Gauge Galvanised Sheet, High Bake Epoxy Powder Coated, Ss Spiked Ionizers To Create High Voltage Dc Field, Aluminium Collector Plates Which Should Be Alternatively Charged Positive And Negative With Large Collecting Area With Deep Cell, To Work As Magnet For Charged Smoke And Oil Particles. Average Efficiency Of 90-95% In Single Pass As Per Ashrae / Dop Test Method. Electrostatic Precipitator Should Be Able To Charge Particles From 0.01 Micron To 10 Microns Through Solid State Power Supply. Collector Cell Should Be Of Permanent Type And Incorporate Slide Out Facility For Easy Removal For Cleaning. Power Supplies Shall Be 100% Solid State.4. Fan Section With Didw Backward Curved Fan Having Following Capacity @ Specified Sp And Should Be Complete With Suitable Tefc Induction Motor And Belt Drive Arrangements. Capacity: 12300 Cfm @ 75Mmwg Spmotor: 7.5Kw. 600 Supplying, Installing, Testing And Commissioning Of Cellulose Fill Air Washer ( Including Fans ) , Giving 95% Adiabatic Saturation Efficiency At 500 Fpm Air Velocity Across Pads, Factory Assembled And Complete With 16 Gauge Gi Casing, Ss Water Sump , Cellulose Fill, Water Distribution Header, Gi Piping, Audco Make Butterfly Valves, For Quick Fill; Isolation Of Tank And Pumps, Y Strainers For Pumps And Necessary Fittings. 601 The Quoted Price Shall Also Include Provision Of Gss Partitions Duly Reinforced At Intake Side Of Air Washer And Gss Louvers With Bird-Screen Fabric Filters And Drift Eliminators.The Price Shall Also Include Horizontal Monoblock Pumps Of Beaconweir / Kbl Make Of Suitable Rating, Factory Mounted On Mild Steel Channel Base With Electric Motor For Circulation Of Water Alongwith Starter Panel. Pumps Shall Be Aligned And Suitable For 415±10% Volts, 50 Cycles 3 Phase Power Supply. One No. 3 Phase Isolator Switch In Weather Proof Enclosure Shall Be Provided Near Motor.Each Complete With Squirrel Cage Induction Motor ( Mounted Internally ) , Airfoil Centrifugal Fan Belt Drive And Vibrations Isolators.Motors Shall Be Suitable For 415 +- 10% Volts, 50 Cycles , 3 Phase Ac Supply An Static Pressure Shall Be As Indicated . Fan-Motor Assembly ( As Whole ) Shall Be Statically & Dynamically Balanced To Grade G6.3 As Per Iso-1940 / Amca 204-3. It Shall Be Suitable For Outdoor Duty And Complete With Duct Flexible Connections And Volume Control Damper . Cfm-11050 602 Control Panels For Fans.;Design, Manufacture, Supply, Installation, Testing And Commissioning Of The Following Cubicle Type, Dead Front, Sheet Steel, Wall Mounted Control Panels, Including Anchoring Into The Wall, Wiring Terminating Into Mccb And Copper Earthing, In Each Panel Shall Be Provided By The Electrical Contractor. 603 25 Amps Mpcb, Upto 7.5Hpdolstarter. 604 32 Amps Mpcb, 10 / 12.5 Hp Star Delta Starters 605 Supplying, Installing, Testing & Commissioning Of The Central Control Stations Consisting Of The Following 606 Supply, Installation, Testing And Commissioning Of Intel Core I3-4150 Processor ( Dual Core, 3Mb, 3.50Ghz W / Hd4400 Graphics ) ( 338-Beed ) , 8Gb Dual Channel Ddr3l 1600Mhz ( 4Gbx2 ) ( 370-Aape ) , Intel Integrated Graphics, 128Gb Solid Drive ( 400-Adlx ) , Windows 7 Professional, English, 64Bit, Us English ( Qwerty ) Dell Kb212-B Quietkey Usb Keyboard Black ( 580-Aaqx ) , Up To 90% Efficient Psu Base 49.5Cm ( 19.5 Inch ) Non-Touch With Camera, Integrated ( 321-Bbgu ) , 8X Slimline Dvd+ / -Rw Drive ( 429-Aamy ) , Dell Usb Optical Mouse Ms111 ( 570-Aacr ) , Energy Star Version 6.0 ( 387-Bbez ) , System Power Cord ( Philipine / Th / Us ) ( 450-Aaoj ) , Safety / Environment And Regulatory Guide ( English / French / Dutch ) ( 340-Agik ) , 1-Watt Bios ( 340-Abmz ) , Heat Sink For Integrated Graphics ( 412-Aade ) With 20 Inch Monitor 607 A4 Size Laser Printer 608 Supplying, Testing And Commissioning Of The Graphical Softwareproviding The Facility To Create / Provide The Following, Static And Animate The Graphics, Navigation Between Pages, Display Of Logs, Changing The Time Zones.The Bms Platform Shall Natively Support Standard Communication Protocols Such As Modbus / Bacnet™. The Software Should Be Web Based Software Required To Remotely Monitor The System For 5 Concurrent Users.This Software Should Have All Kinds Of Dedicated Application Required To Operate A Chiller Plant Manager, All The Licenses Required To Make Chiller Plant Manager Fully Function Shall A Part Of This Software.It Should Have Inbuit Feature Of Email For Sending Critical Alarms Without Additing Any External Software / Hardware. It Should Have Inbuilt Feature Of Energy Monitoring. 609 Supplying, Testing And Commissioning Of The Necessary Hardwares / Softwares For Integrating It With 3Rd Party Devices On Bacnet / Modbus. Integrator Module Shall Be Of Controller Manufacturer Only. ( A ) Chiller-3 Nos, ( B ) Variable Speed Pump Vfd-11 Nos 610 Supply, Installation, Testing & Commissioning The Following Equipment:Network Controller - Providing, Installing, Testing And Commissioning Of Network Supervisory Controller Unit For Connecting All Controllers To It And Transferring Data To Pc Platform. ( A ) The Unit Shall Comply Following Codes And Standards: Ul And Ce. ( B ) The Unit Shall Support Open Standard Protocol Bacnet And Modbus ( C ) Shall Be Able To Store Reports And Event Logs. ( D ) Web Enabled.The Controller Shall Becapable Of Connecting The Future Expansion Ddcs / Integrators. The Controller Shall Be Able To Support Both Modbus & Bacnet Controllers. It Should Have At Least 3 Configurable Ports For Connecting Bacnet / Mstp Devices & All These Ports Should Be Capable To Work As Modbus Port. Each Port Should Be Able To Take At Least 60 Ddcs In A Single Loop. It Should Be Capable Of Storing Data At Least For 30 Hours Without Any Battery In Case Of Power Failure & Should Have Micro Sd Card For Backup Recovery. It Should Have Capability To Connect Expansion Modules For Enhanced Flexibility. It Should Be Web Enabled And Should Be Able To Work With Any Kind Of Search Engine, It Should Have Wi-Fi Capability To Connect With Remote Devices. It Should Freely Support Android And Mac Mobile Applications For Remotely Managing The System Through Gprs For Wi-Fi Connectivity Without Any Additional Cost. It Should Have A Feature To Be Used As A Gateway / Router For 3Rd Party Applications On Bacnet. It Should Be Web Enabled Andshould Not Require Any Software For Controlling / Monitoring Of Hard Wired Points. His Controller Should Work As A Chiller Plant Manager Module On Whichcpm Programmes & Logics Can Be Written. Controller Must Be Imported, No China Made Controllers Are Accepted. 611 Programmable And Application Specific Controller - Providing, Installing, Testing And Commissioning Of Filed Mounted Bacnet Ip Controllers Of The Following Configurations And As Per Below Specifications: ( A ) The Programmable Controllers Processors Shall Be 32-Bit, 50 Mh, Bacnet Compatible.The Ddc Controllers Should Be On Bacnet, Ul Listed & Btl Tested. The Ddc Controller Shall Be As Per The I / O Summary. The Controller Shall Have Built In Memory, Minimum 4 Gb, To Save, Alarms, Trends, Schedules & Graphics For The Connected Points. Controller Shall Have Onboard Lan Port. Providing, Installing, Testing And Commissioning Of Vandal Proof, Lockable And Secure Ms Cabinets For The Controllers Along With All Accessories Shall Be Part Of This Item. Controller Must Be Imported, No China Made Controllers Are Accepted. Maximum4 Ahu To Be Connected Per Ddc Panel. Minimum 15% Spare Io Points Needs To Be Kept. 612 Supply, Installation, Testing & Commissioning Ofthe Following Sensors : 613 Differential Pressure Switch Across The Air Handling Units For Indicating The Fan & Filter Status 614 Current Relay 615 Duct Type Temperaturesensorsfor Measuring Return Air Temperature At The Air Handling Units 616 Immersion Temperature Sensor 617 Outside Temp + Rh Sensor 618 Single Level Switch For Ct 619 Ultrasonic Clampon Flow Meter 620 Wall Mounted Display Type & Rh Temperature Sensor 621 Water Pressure Differential Pressure Transmitter 622 Supply, Installation, Testing & Commissioning Of The Following Cables As Per The Specifications: 623 Unshielded Signal Armoured Cables, 2 C X 1.0 Sq.Mm. Stranded Tinned Cu Conductor, Pvc Sheathed Type. Signal Cable From Controllers To Sensors Shall Be Used. 624 Shielded Communication Armoured Cables, 2 C X 1.0 Sq.Mm.Stranded Tinned Cu Conductor, Pvc Sheathed. Communication Cable From Controllers To Controllers & To Third Party Devices Shall Be Used. 625 Unshielded Signal Armoured Cables, 3 C X 1.5 Sq.Mm. Stranded Tinned Cu Conductor, Pvc Sheathed Type. Signal Cable From Controllers To Valve Shall Be Used. 626 Cat6e Cable With Pvc Conduit 627 Medical Gas Pipelines System 628 Supply, Instllation Testing And Commissiong Of Copper Piping As Per Technical Specification Bs: 13348 Kite Mark Mex Flow / Metal Gem / Cubex: Installation Of Piping Should Be Carried Out As Per International Standards With Utmost Cleanliness.Only Pipes, Fittings And Valves Which Have Been Degreased As Per International Standards Should Be Used . Pipe Fixing Clamps For Upto 28Mm Diameter.Pipes Should Be Non Ferrous Suitable For The Diameter Of The Pipe.For The Pipes Of The Sized Above 28Mm Rigid Metallic Hanging Or Cemented Supports To Be Used. The Main Lines To The Building To Be Taken Overhead Through Metallic Poles Or Through Underground Ducts With Inspection Removable Slabs, All Pipe Joints Should Be Made Using Inert Gas Fluxless Brazing Method.All Joints Should Be Of Copper To Copper And Should Be Brazed By Silver Brazing Filler Material Without Flux While Being Brazed Joints Shall Be Continuously Purged With Oil Free Dry Nitrogen To Prevent The Formation Of Copper Oxide On The Inside Surface Of The Joint.All Pipes Should Be Installed Without Springing Or Forcing.All Pipes Should Be Protected Against Mechanical Injury In A Manner Satisfactory To Authorities Having Jurisdiction. Test: After Erection, All The New Pipes Cleaned Or Purged With The Help Of Dry Nitrogen Gas.Complete System Should Be Tested With Dry Nitrogen At 2 Times Of Working Pressure For 24 Hours. Painting: All Existing And Proposed Exposed Pipes / Should Be Painted With Two Coats Of Synthetic Enamel Paint & Color Codification As Per International Standards.All Concealed Pipes To Have Gas Identification Bands / Labels At Appropriate Distance.Similarly All Pipes Which Need Embedding In The Wall Should Be Tested / Painted / Labeled And Properly Insulated. Certification: Tobe Certified That Pipes Are Suitable For The Particular Service And Complete Cross Connection ( Anti-Confusion ) Test Should Be Carried Out. Distribution Piping System: 629 Material ( Pipe ) : Solid Drawn, Seamless, Deoxidized, Non Arsenical, Half Hard, Tempered And Degreased Materials Conforming To Bs: En 13348Kite Mark Medical Grade Pipeall Copper Pipes Should Be Inspected And Certified By Kiteregister Of Services For Medical Use Before Dispatch And The Pipe Should Be Delivered Plugged Or Capped At Both Ends. Fittings Shouldbe Made Of Copper Conforming To Bs 864 And Suitable For A Steam Of Testing Pressure Of 8 Bar And Especially Made For Brazed Socket Type Connections. 630 76Mmodx1.5Mm Thick 631 54Mmodx1.2Mm Thick 632 42Mm Odx1.2Mm Thick 633 28Mmodx 1.0Mm Thick 634 22Mmodx 1.0Mm Thick 635 15Mm Odx 1.0Mm Thick 636 12Mm Odx 1.0Mm Thick 637 Supply, Installation, Testing And Commissioning Of Gas Outlet Points For Oxygen, Nitrous Oxide, Air, & Vacuumsystem As Per Technical Specification Nfpa-99 Ul / Etl Listed ( Imported ) Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa:The Outlets Shall Be Modular Singles, And Shall Incorporate Nameplate Color-Coding In Accordance With Nfpa 99. The Single Modular Outlets Shall Be Of A Design That Provides For Ganging Of Rough-In Plates In The Field To Form Multiples.The Gas Services Shall Be Sequentially Arranged And Located As Shown On The Plans With A Minimum Centerline Spacing Of 5 Inches ( 12.5 Cm ) Between Outlets.The Outlets Shall Be Capable Of Supporting Dispensing Equipment Without The Use Of Slide Brackets. The Medical Gas Outlets Shall Be Designed So That, Once Installed, Routine Service Of Both The Primary And Secondary Check Valves Can Be Accomplished Without Removing The Nameplate Or Gas Specific Portions.The Primary Check Valve Shall Be Unitized And Of The Cartridge Type.So That The Primary Check Valve Can Be Removed For Service Without Shutting Off The Gas Supply To The Outlet, The Secondary Check Valve Shall Operate Automatically To Stop The Free Flow Of The Pressure Gas.There Shall Be No Secondary Check For Vacuum Or Gas Evacuation Service.Medical Gas Outlets That Require The Removal Of The Nameplate Or Gas Specific Components For Routine Service Shall Not Be Acceptable. 638 The Outlets Shall Incorporate The Following Features: • Ul Listed To Ul 1331 And Csa Z9170-1.• Conforms To Nfpa 99 And Cga Standards • Accepts Diss Gas Specific Nut & Nipple Adapters• Ease Of Maintenance Without Removing The Faceplate Using A Cartridge Insertion Tool. • Compensates For Variation In Wall Thicknesses From ½” To 1 ¼” • Modular Design• All Outlets Are 100% Tested For Flow And Leaks • Nameplate Color Coding Per Nfpa 99 • 5” Centers • 360° Swivel Inlet Tube • Metal Back And Nameplate• Strength Of Connections Provides Support For Dispensing Equipment Without The Useof Additional Brackets • Made In The U.S.A. The Outlet Nameplate Shall Be Permanently Color Coded With A Durable Scratch-Resistant And Protective Label. The Outlet Trim Plate Shall Be Durable Plastic Or Powder Coated Aluminum, Attached With The Nameplate To The Rough-In Assembly, And Provide Automatic Plaster Adjustment From 1 / 2 To 1-1 / 4 Of An Inch ( 1.3 To 3 Cm ) .The Outlet’S Rough-In Supply Tube Shall Be A 7 Inch ( 18 Cm ) Length Of 1 / 2” O.D. Copper Type K For All Gas Services And Labeled With The Name Of The Gas Service.Medical Gas Outlets Shall Be Cleaned For Oxygen Service In Accordance With The Current Compressed Gas Association ( Cga ) Pamphlet G-4.1, Capped And Placed In A Protective Container For Shipment.The Outlets Shall Be Installed In Strict Accordance With Manufacturer’S Instructions, And Tested Before Use In Conformance With Local And Federal Codes. 639 For Oxygen 640 For Nitrous Oxide 641 For Compressed Air ( 4 Bar ) 642 For Compressed Air ( 7 Bar ) 643 For Vacuum 644 For Agss / Wagd 645 Supply, Installation, Testing And Commissioning Of Matching Probe / Adopter With One End Suitable For Hose & Other End Suitable For Terminal Units Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline- Uk / Modular-Usa As Per Technical Specifications Nfpa-99 Ul / Etl Listed ( Imported ) : Matching Probe / Adoptersfor, Gas Outlets ( Imported ) Pneumatik Berlin- Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa As Per Nfpa99 Latest Edition Ul Listed / Etl Listed One End Of Matchingprobes Shall Be Suitable For Medical Gas Outlet Point & Other End Shall Be Suitable For Hose. Suitable For Oxygen, Nitrous Oxide, Compressed Air 4 Bar, Compressed Air 7 Bar, Diss Connection, Vaccum. 646 For Oxygen 647 For Nitrous Oxide 648 For Compressed Air ( 4 Bar ) _ 649 Fro Compressed Air ( 7 Bar ) 650 For Vacuum 651 For Agss / Wagd 652 Supply, Installation, Testing And Commissioning Of Integrated / Combined Alarm -Valve Box As Per Nfpa 99 ( Imported ) As Per Tender Specifications. : Touch Type Integrated / Combination Area Alarm And Valve Box As Per Nfpa 99 ( Imported ) Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Precision-Uk As Per Nfpa99 Latest Edition Model No Of Single Valve Box The Combination Area Alarm And Zone Valve Box Panel Shall Be Lcd Touch Screen Microprocessor Controlled And Designed Tocomply With Nfpa 99.The Panel Shall Be 100% Digital And Shall Not Require Re-Calibration. The Alarm Panel Shall Be Enclosed In A Steel Box And Shall Be Designed To Accept An Electrical Input Range Of 120-240 Volts Ac – 50-60 Hertz.The Source Voltage Shall Be Stepped Down With A Self-Contained Transformer.The Panel Shall Contain Audible And Visual Alarm Indicators.The Audible Alarm May Be Silenced By Pressing The Alarm Silence Button, But The Visual Alarm Indicator Can Only Be Cancelled By Fault Correction.The Alarm Shall Detect And Filter Out Transient ( Less Than 0.6 Seconds ) Signals Created By R.F.I.The Alarm Shall Be Capable Of Displaying Alarm History For All Possible Alarmconditions. Each Combination Area Alarm And Zone Valve Box Shall Contain Up To Seven Gas Services.Gas Modules And Valves Can Be Arranged In Accordance With Project Requirements. In Addition, Each Alarm Module Shall Incorporate The Following Features: Each Gas Module Can Be Easily Identified To Indicate The Area Being Monitored Usingthe Database Of Nfpa 99 Gas Services And Color Coding Provided.Does Not Require Re-Calibration Gas Specific Sensor With Diss Nut & Nipple.An Error Message Will Be Displayed If Incorrect Sensor Or No Sensor Is Attached. User Programmable Pressure Limits ( Programmed From Factory At 60 / 40 Psig And 12 In Hg ) Shall Be Capable Of Displaying Gas Readouts In Psi ( In Hg ) , Bar Or Kpa. Gas Audible Alarm Repeat Feature Factory Set At 10 Minutes, Adjustable From 1 Minute To 240 Minutes, Or Off Gas Specific Diss Demand Valves Included On Each Valve For Connecting The Gas Specific Transducers Each Valve Boxes Shall Be Include A Gas Specific Demand Valve Connection Which May Be Used For Connection Of The Gas Specific Transducer Or Back Feeding.Back Feed Port Shall Allow Back Feeding Of Gas Without Interruption Of Gas Service, So That Back Feeding A Piped Gas System Through A Station Outlet Will Not Be Necessary. Back Feeding A Piped Gas System Through A Station Outlet Shall Not Be Acceptable.The Valves Shall Be Bronze, Ball-Type, With Teflon ( Tfe ) Seats And Seals. All Valves Shall Be Dual Gauge Ported, Rated At A Working Pressure Of 600 Psi ( 29 In / Hg Vacuum ) , And Shall Be Operated By A Lever-Type Handle, Requiring Only A Quarter Turn From A Fully Open Position To A Fully Closed Position.Valves Shall Incorporate An Adjustable Packing And A Blow- Out Proof Stem.Only Full Port Valves Having Flow Rates Comparable To Equivalent Size Of Pipe Shall Be Used.Valves Shall Be Piped From Left To Right. Valves Shall Be Provided With Type K Copper Tubing Extensions To Facilitate Installation.Valves Shall Be 3 Piece In-Line Repairable Type.Each Valve Assembly Shall Be Supplied Cleaned For Oxygen Service In Accordance Withcurrent Cga Standards.The Valve Tube Ends Shall Be Capped And Sealed In A Protective Container To Prevent Contamination Prior To Installation. Gauges Shall Be 1 ½” Diameter For Monitoring Pressure And Vacuum, And Shall State:“Use No Oil”.Dual Scale Gauges Are Not Acceptable For U.S.A. Installations.A Fully Color Coded Label Package Shall Be Supplied With Each Valve Box Assembly For Application By The Installer.The Valve Box Shall Be 16 Gauge Sheet Steel Construction Powder Coated To Prevent Rust.A Single Box Shall House From One To Seven Valves.Box Shall Be Supplied With A ¾” Plaster Flange. Valve Box Assembly Shall Be Supplied With A Formed Steel Decorative Frame Powdercoated Which Encloses An Easily Removable Flexible Window.The Window Shall Be A “Smoked” Translucent Flexible Plastic With A Pull-Out Ring Pre-Mounted To The Center Of The Window.The Window Shall Not Be Replaceable While Any Valve Is In A Closed Position.Window Shall Be Silk Screened With The Following Statement “Caution: Medical Gas Shutoff Valves.Close Only In Emergency.”Master Alarms ( Imported ) As Per Nfpa -99 Std Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa The Master Alarm Panel Shall Be Shall Be Lcd Touch Screen Microprocessor Controlled And Designed To Comply With Nfpa 99 . The Panel Shall Be 100% Digital And Shall Not Require Re-Calibration.The Panel Shall Be Able To Interface With Building Management Systems With The Use Of Either An Ethernet Modbus Interface Or A Bacnet Interface.The Alarm Panel Shall Be Enclosed In A Steel Box And Shall Be Designed To Accept An Electrical Input Range Of 120-240 Volts Ac – 50-60 Hertz.The Source Voltage Shall Be Stepped Down With A Self-Contained Transformer.The Panel Shall Contain Audible And Visual Alarm Indicators. The Audible Alarm May Be Silenced By Pressing The Alarm Silence Button, But The Visual Alarm Indicator Can Only Be Cancelled By Fault Correction.The Alarm Shall Detect And Filter Out Transient Signals ( Less Than 0.6 Seconds ) .The Alarm Shall Be Capable Of Displaying Alarm History For All Possible Alarm Conditions. Each Source Signal Module Shall Monitor 8 Signals.The Alarm Shall Be Capable Of Monitoring And Displaying Up To 128 Medical Gas Source Signals In Increments Of 8 Source Signals.The Alarm Is Modular And May Be Initially Installed As A Smaller Unit ( I.E. 16 Signals ) And Later Expanded ( I.E. To 32, 48, Or 64 Signals ) . In Addition, Each 8 Signal Master Alarm Module Shall Incorporate The Following Features: Individual User Programmable Remote Signal Alarm Points To Accept No Or Nc Signals, Or May Be Disabled.Factory Preset To Accept Normally Closed Signals Lcd Indicators ( Green ) Confirms Normal Status, ( Red ) Indicates Abnormal Condition Each Signal Easily Identified To Suit Any Requirement Using The Preloaded Comprehensive Database Of Nfpa 99 Required Master Provided With The Alarm A Set Of Dry Contacts With Relay To Trigger An Optional ‘Global’ Remote Alarm In The Event Of An Alarm Condition 2.85” Lcd Touch Screen Displays Up To 8 Normal And Alarm Conditions For Pressure Switch Sensor Inputs •2.85” Lcd Touch Screen Displays Up To 8 Normal And Alarm Conditions And Provides A Digital Pressure Display For Up To 4 Transducer Sensor Inputs 2.85” Lcd Touch Screen Displaysnormal And High / Low Alarm Conditions For One 4 – 20 Ma Sensor Input The Lcd Touch Screen Allows All Alarm Programming And Set Up To Be Done Without The Use Of Tools A Green Normalor Red Alarm Condition For Each Gas Service Confirms The Condition For Each Individual Gas Service 653 Emergency Preparedness Instructions - Med Touch Alarm Panels Allow Usersto Set Up Customized Instructions For Each Alarm Signal Which Appear On The Screen When The Signal Is Inalarm • Up To 128 Remote Master Signals In A Single Panel Up To 4 Master Boards ( 32 Signals ) In A Two Slot, 8 ( 64 Signals ) In A Three And 16 ( 128 Signals ) In A Five Slot Panel• Wireless ( Minimal Low Voltage Wiring ) Models Available • Last Event History ( Per Gas Board / Signal Point ) • Made In The U.S.A. • Nfpa And Iso Pre-Loaded Gas ‘Labels’ • English, And English / French Pre-Loaded Languages• Editable Text And Alarm ‘Labels’ • Self-Contained Unit - Designed For Ease Of Installation And Service • Self-Diagnostic Error Message Display For Ease Of Maintenance• Audio And Visual Alarm Indicators 654 • Bright Easy To Read Lcd Displays – Clearly Visible In Both Day And Night Lighting Conditions • Constant Display And Monitoring Of Each Sensor Input • User Programmable High / Low Set Points On Transducer And 4 – 20 Ma Sensor Input Boards • Dry Contacts Provided On The Cpu Module For General Fault Condition Covering Entire Panel • Hinged Frame For Easy Accessibility • Color Coded Displays 655 Master Alarm Panel 656 Areas Alarms Panel: 657 2 Gas Service 658 3 Gas Service 659 5 Gas Services 660 Supply, Installation Testing And Commissioning Of Fully Automatic Oxygen Control System ( Improted For Oxygen As Technical Specifications. Nfpa-99 ( Imported ) : Fully Automatic Digital Oxygen Gas Control Systemimported Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa As Per Nfpa99 Latest Edition Gas Manifold Will Befully Automatic, Self – Shifting To Reserve Bank Onexhaustion Of The Service Bank Without Interruption Of Gas Delivery To The System. A Critical Connections Will Begas Specific, Non-Interchangeable And Will Be Designed To Eliminate Gas Supply Error. The Manifold Control System Willsupply A Flow Of 1500-2000 L / Minat 50-60 Psi.The Dual Line Regulator / Single Vent Medical Gas Manifold Control Unit Will Include Right And Left Header Bars And Pigtails For The Appropriate Medical Gas. The Installed System Will Automatically Switch Overto The Reserve Bank When The Primary Bank Is Depleted. When The Depleted Cylinders Are Replaced With Full Cylinders The System Will Automatically Reset Itself In Preparation For The Next Bank Change. The Primary Side Bank In Use And The Remaining Side Bank On Reserve. This Designation Will Automatically Change From Left To Right And Right To Left As Each Bank Is Depleted And, In Turn, Refitted With Full Gas Cylinders. The Led Indicator Will Show A Depleted Bank By Turning Red. A Buzzer Will Also Sound To Indicate An Empty Bank. When The System Is Reset By Replacing The Depleted Cylinders, The Indicator Will Turn Green And Also Silence The Buzzer. If The Manifold Is Connected To The Health Care Facility’S Central Alarm System That Will Also Indicate That The Bank Was Depleted And, In Turn, Was Reset.The Only Manual Activity Medical Gas Manifold Requires Is The Changing Of The Depleted Cylinders.When A Bank Is Depleted, Manifold Will Automatically Switch To The Fresh Bank, Delivering An Uninterrupted Gas Supply To The Health Care Facility. 661 Changeover Is Performed By Solenoid Valves Contained In The Control Cabinet. In The Event Of An Electrical Power Failure, Both Solenoid Valves Will Automatically Open To Provide An Uninterrupted Gas Flow.Under Normal Operating Conditions, The Gas Will Leave The High Pressure Cylinders Throughthe Pigtails Into The Header Bars.The Pigtails Will Have On-Way Valves ( Check Valves ) To Allow The Replacement Of Depleted Cylinders With Out Gas Pressure Back-Flow Into The Remaining Depleted Cylinders On That Bank. In The Event A Safety Relief Device On An Individual Cylinder Will Activate Or A Pigtail Will Leak Excessively, The Local Check Vale Will Also Prevent Loss Of Gas From The Rest Of The Cylinders On That Bank.The Gas Will Flows Through The Manually Operated Shutoff Valve Into The Primary Regulator. This Regulator Will Reduce The High Cylinder Pressure To An Intermediate Pressure. 662 Supply, Installation, Testing And Commissioning Of Fully Oxygen Manifold ( 16+16 ) As Per Technical Specifications. The Cylinders Shall Not Be Included In The Quoted Price. ( Imported ) : Oxygen Manifold 16+16Imported Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa As Per Nfpa99 Latest Edition The Modular Manifold System Should Comprise Ofextendable BankS Of 16+16Cylinders.High Pressure Copper Pipes Of Size 1 / 2 Id X 15 Swg & High Pressure Brass Fitting Made Of High Tensile Brass Shall Be Used. Flexible Copper Tail Pipeswith Bul Noserh Threads Should Be Used To Connect The Gas Cylinders To The Header Assemblies With Non Return Valves.High Pressure Flexible Tail Pipes Should Be Made Of Copper Pipe Of Id 1 / 4 X 15 Swg The Manifold Should Be Testedhydraulically At 225 Kg / Cm2 Pressure. It Should Be Degreased For Oxygen Service And Should Be Supplied Duly Wrapped In A Polythene Bag. 663 Supply, Installation, Testing And Commissioning Of10cylinder Emergency Oxygen Supply System As Per Technicalspecifications. The Cylinders Shall Not Be Included In The Quoted Price. ( Imported ) : Emergency Oxygen System - Imported Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa As Per Nfpa99 Latest Edition The Modular Manifold System Should Comprise Ofextendable BankS Of 10 Cylinders. High Pressure Copper Pipes Of Size 1 / 2 Id X 15 Swg & High Pressure Brass Fitting Made Of High Tensile Brass Should Be Used. Flexible Copper Tail Pipeswith Bul Noserh Threads Should Be Used To Connect The Gas Cylinders To The Header Assemblies With Non Return Valves, Isolation Valve & Manual Regulator.High Pressure Flexible Tail Pipes Shall Be Made Of Copper Pipe Of Id 1 / 4 X 15Swg. The Manifold Should Be Tested Hydraulically At 225 Kg / Cm2 Pressure. It Should Be Degreased For Oxygen Service And Should Be Supplied Duly Wrapped In A Polythene Bag. 664 Supply Installation, Testing And Commissioning Of Oxygen Flow Meter ( Imported ) With Humidifier Bottle 0-15Litres, Ce Marked Andas Per Technicalspecifications ( Imported ) : Oxygen Flowmeter & Humdifier Bottle ( Imported ) Tri-Tech Medical -Usa / Flowmeter-Italy / Medepha-Italy / Powerex-Usaly Europeance Marked Brass Body Chrome Plated Flowmeter With Colour Coding To Match With The Gas Being Used. The Housing Will Be Made Of Polypropylene To Ensure High Durability. The Flow Range Will Be 0-15 Lpm. The Flowmeter Will Be Fitted With Matching Adaptor ( Probe ) For Oxygen Gas Outlet Point. Humidifier Bottle Will Be Compatible With Oxygen Flowmeter & It Will Be Reusable Type. The Bottle Will Be Shatterproof & Made Of Polypropylene. Metal Components Of Humidifier Bottle Will Be Made Of Brass With Anti-Corrosion Nickel Plating. 665 Supply Installation Testing And Commission Of Fully Automatic Gascontrol Panel For Nitrous Oxide ( Imported ) As Per Technical Specifications Nfpa-99 ( Imported ) :Fully Automatic Digital Nitrous Oxide Gas Control System Imported Allied - Usa Imported / Pnumatik Berlin - Germany / Modular -Usaas Per Nfpa99 Latest Editiongas Manifold Will Befully Automatic, Including Self – Shifting To Reserve Bank Onexhaustion Of The Service Bank Without Interruption Of Gas Delivery To The System. All Critical Connectionswill Be Gas Specific, Non-Interchangeable And Will Be Designed To Eliminate Gas Supply Error. The Heaters Will Be Provided For Both L & R Banks . The Manifold Control System Willsupply A Flow Of 500-700 L / Min At 50-60Psi.The Dual Line Regulator / Single Vent Medical Gas Manifold Control Unit Will Include Right And Left Header Bars And Pigtails Forthe Appropriate Medical Gas. The Installed System Will Automatically Switch Overto The Reserve Bank When The Primary Bank Is Depleted. When The Depleted Cylinders Are Replaced With Full Cylinders The System Will Automatically Reset Itself In Preparation For The Next Bank Change. The Primary Side Bank In Use And The Remaining Side Bank On Reserve. This Designation Will Automatically Change From Left To Right And Right To Left As Each Bank Is Depleted And, In Turn, Refitted With Full Gas Cylinders The Led Indicator Wil Show A Depleted Bank By Turning Red. A Buzzer Will Also Sound To Indicate An Empty Bank Or Bank. When The System Is Reset By Replacing The Depleted Cylinders, The Indicator Will Turn Green And Also Silence The Buzzer. If The Manifold Is Connected To The Health Care Facility’S Central Alarm System That Will Also Indicate That The Bank Was Depleted And, In Turn, Was Reset.The Only Manual Activity Medical Gas Manifold Requires Is The Changing Of The Depleted Cylinders.When A Bank Is Depleted, Manifold Will Automaticallyswitch To The Fresh Bank, Delivering An Uninterrupted Gas Supply To The Health Care Facility. Changeover Is Performed By Solenoid Valves Contained In The Control Cabinet. In The Event Of An Electrical Power Failure, Oth Solenoid Valves Will Automatically Open To Provide And An Uninterrupted Gas Flow.Under Normal Operating Conditions, The Gas Will Leave The High Pressure Cylinders Through The Pigtails Into The Header Bars.The Pigtails Will Have On-Way Valves ( Check Valves ) To Allow The Replacement Of Depleted Cylinders With Out Gas Pressure Back-Flow Into The Remaining Depleted Cylinders On That Bank. In The Event A Safety Relief Device On An Individual Cylinder Will Activate Or A Pigtail Will Leak Excessively, The Local Check Val Will Also Prevent Loss Of Gas From The Rest Of The Cylinders On That Bank.The Gas Will Flows Through The Header Bar To The Control Unit. A Manually- Operated Shut-Off Valve Installed Downstream Of Each Header Bar. 666 These Valves Located Outside The Control Cabinet, One On The Right And One On The Left Side. The Valves Normally Left Fully Open Toallow Unrestricted Flow Of Gas From The Two Cylinder Bank. In Case Of An Emergency, They Could Be Closed To Isolate On Or Both Banks The Gas Will Flows Through The Manually Operated Shutoff Valve Into The Primary Regulator. This Regulator Will Reduce The High Cylinder Pressure To An Intermediate Pressure. The Intermediate Pressure Gas Flows Through The Solenoid Valve To The Line Regulator For Its Final ( Line ) Pressure Reduction For Use In The Health Care Facility. Two Line Pressure Regulators Will Installed In Parallel, And Each Will Be Capable Of Maintaining A Constant Dynamic Delivery Pressure At The Maximum Designed Flow Rate Of The System. The Solenoid Valve Will Be The Key To The Automatic Mechanism The Manifold. This Component Ensures That The Flow Of Gas Is Not Interrupted And The Pressure Does Not Fluctuate During Normal Operation. When The Operating Bank Pressure Falls To A Predetermined Level, Which Is Controlled By The Preset Pressure Switches ( High And Low ) , The Switches Will Activate The Solenoids To Switch To The Fresh ( Reserve ) Cylinder Bank . The Manifold Control Cabinet Will Have Three Means Of Giving Continuous Information On The System Status: First Pressure Gauges To Indicate The Bank Pressure And The Delivery Pressure: Second Six Indicator Leds , Two Green That Indicate Which Cylinders Is In Use, Two Yellow For Reserve Ready And Two Red That Indicate A Bank Is Now Depleted : Third, A Loud Audible Buzzer Gives An Alarm When Either Or Both Banks Are Depleted. The Six Indicators Will Controlled By Sensing The Bank Pressure . Replacing The Depleted Cylinders On The Empty Bank Resets The System, Changing The Indicator Form Red To Yellow. 667 At The Same Time The Yellow Led Should Change To Green To Go Form Reserve Ready To In Service. Leds Willshow Red Prior To Initial Pressurization Or Whenever Both Cylinder Banks Are Below The Preset Value The Control Panel Shouldbe Capable To Be Connected With The His System. 668 Supply Installation Testing And Commissioning Of Nitrous Oxide Manifold ( 1+1 ) As Per Technicalspecifications. The Cylinder Shall Not Be Included On The Quotedprice. ( Imported ) : Nitrous Oxide Manifold 1+1Imported Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa As Per Nfpa99 Latest Edition The Modular Manifold System Should Comprise Ofextendable BankS Of 4+4 Cylinders.High Pressure Copper Pipes Of Size 1 / 2 Id X 15 Swg & High Pressure Brass Fitting Made Of High Tensile Brass Shall Be Used. Flexible Copper Tail Pipeswith Bul Noserh Threads Should Be Used To Connect The Gas Cylinders To The Header Assemblies With Non Return Valves.High Pressure Flexible Tail Pipes Should Be Made Of Copper Pipe Of Id 1 / 4 X 15 Swg The Manifold Should Be Testedhydraulically At 225 Kg / Cm2 Pressure. It Should Be Degreased For Oxygen Service And Should Be Supplied Duly Wrapped In A Polythene Bag. 669 Supply Installation, Testing And Commissioning Of1 Cylinder Emergency Nitrous Oxide Supply System As Per Technical Specifications. The Cylinder Shall Not Be Included In The Quoted Price. ( Imported ) : N2o Emergency Cylinder System -Imported Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Modular-Usa As Pernfpa99 Latest Edition The Modular Manifold System Should Comprise Ofextendable BankS Of 1 Cylinders. High Pressure Copper Pipes Of Size 1 / 2 Id X 15 Swg & High Pressure Brass Fitting Made Of High Tensile Brass Should Be Used. Flexible Copper Tail Pipeswith Bul Noserh Threads Should Be Used To Connect The Gas Cylinders To The Header Assemblies With Non Return Valves, Isolation Valve & Manual Regulator.High Pressure Flexible Tail Pipes Shall Be Made Of Copper Pipe Of Id 1 / 4 X 15Swg. The Manifold Should Be Testedhydraulically At 225 Kg / Cm2 Pressure. It Should Be Degreased For Oxygen Service And Should Be Supplied Duly Wrapped In A Polythene Bag. 670 Supply, Installation, Testing And Commissioning Of Oil Free Scroll Compressors Air Systemas Per Technical Specifications.Nfpa-99 ( Imported ) : Scroll Compressed Air System ( Imported ) Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Gregerson-Germany As Per Nfpa99 Latest Edition The System Shall Be Consisting Of Oil Free Duplex Compressed Air System To Provide Total System Capacity ( Running+Stand By ) 75 Scfm / 2100 Lpmto Be Delivered To The Hospitalalong With Allied Equipment, Suitable Tank And Control Panel The Skid Mount Oil Less Scroll Medical System Is Designed To Provide Medical Breathing Air . The Plant Multiplex Oil-Less Scroll Air Compressors With Oneasme Tank, Two Medical Desiccant Air Dryer System, Safety & Pressure Gauges, Two Set Of Four Stage Filteration System For Breathing Air, One Dew Point Monitor, One Carbon Dioxide Monitor And One Medical Control Panel. The Complete Package Will Be Pre-Wired, Pre-Piped With Single Point Connections For Electrical, Intake Air, Discharge Air And Condensate Drain.Direct Drive Compressors Will Not Be Used. Composite Ptfe Tip Seals Rated At 10, 000 Hours Operation Will Be Used. Compressor Bearings Will Be External To The Air Compression Chamber. Compressors Will Have An Integral Radial Flow Fan For Cooling And Will Not Require Any Additional Electric Cooling Fans. Each Compressor Will Be Driven By A Motor Of1750 Rpm, Odp, Nema Construction Motor. The System Will Include An Asme Air Receiver Rated 200 Psi Mawp. The Tank Will Be Equipped With A Pressure Gauge, Safety Relief Valve, Block & By-Pass Valves And Condensate Sight Gauge And Automatic Electronic Tank Drain With Manual Override. Vertical Receiver Will Be Internally Lined With An Fda Approved Material For Corrosion Resistance. 671 The System Will Include A Ul Listed Control Panel In A Nema-12 Enclosure Will Be Supplied With H-O-A Switch, Magnetic Starter With 3 Leg Over Load Protection, High Temperature Shutdown With Audible And Visual Alarm, Hour Meter, And Compressor Run Light.All Alarms Will Have Dry Contacts Ona Labeled Terminal Strip For Remote Alarms. Provide Manual Reset For Thermal Malfunction Shutdown. All Control And Alarm Functions Will Remain Energized While Any Compressor In The System Remains Electrically On-Line. The Lag Compressor Will Be Able To Start Automatically If The Lead Compressor Fails To Operate.Dual Desiccant Air Dryers, Dual Filter And Regulator Bank With Sample Ports, Dew Point And Co Monitors With Alarms, And All Bypass Piping. Piping To Be Brass, Stainless, Or Type K Copper, And Cleaned For Medical Air Use. All Components Will Be Mounted Piped And Wired To The Air Receiver. Each Twin-Tower Desiccant Dryer Will Be Sized For The Peak Calculated System Demand To Provide A Pressure Dew Point Of Zero Degree F. Dryer Controls Will Include A Repressurization Cycle To Prevent Shocking Of The Desiccant Bed Prior To Switchingtowers.An Integral Purge Savingcontrol System Will Be Provided And Will Suspend The Purge Air Loss During Periods Of Low Demand. When The Dryer Is In Purge Control Mode, The Tower Switching Valves Will Not Operate, And Only One Desiccant Tower Will Be On-Line. The System-Integrated Hygrometer Will Be Equipped With An Lcd Dewpoint Display And High Dewpoint Alarm With Dry Contacts For Remote Monitoring. The Dew Point Sensor ( Probe ) Will Be Of A Rugged Hyper-Thin-Film Aluminum Oxide Type, And Installed So That The Monitored Airflow Is Downstream Of The Pressure Regulator Assembly. The Monitor Will Include A Self Calibration Mode To Enable Calibration Of The Dewpoint Sensor Without The Need To Return The Sensor To The Factory For Calibration. 672 The Carbon Monoxide ( Co ) Monitor Is Provided In A Nema 4 Enclosure With Lcd Display Of Co Concentrations. The Monitor Will Continuously Display The Co Content Of The Discharge Air And Will Provide Audible And Visual High Co Alarms. High Alarm Is Set At 10 Ppm As Per Nfpa 99. Dry Contacts Are Provided For Remote Monitoring Of The High Co Alarm. Total4 Stages Of Filters Will Be Provided Along With The Compressed Air System As Follows: Air Filtration System Stage 1: Compressed Air 1 Micron Line Filter ( Coalescing & Filters For General Protection ) The Medical Air 1 Micron Line Filter Is Designed For Removal Of Liquids And Solid Particles From The Medical Air Stream. 673 Supply, Installation, Testing And Commissioning Of Oil Free Scroll Compressors Air Systemas Per Technical Specifications.Nfpa-99 ( Imported ) : Scroll Compressed Air System ( Imported ) Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Gregerson-Germany As Per Nfpa99 Latest Edition The System Shall Be Consisting Of Oil Free Duplex Compressed Air System To Provide Total System Capacity ( Running+Stand By ) 75 Scfm / 2100 Lpmto Be Delivered To The Hospitalalong With Allied Equipment, Suitable Tank And Control Panel The Skid Mount Oil Less Scroll Medical System Is Designed To Provide Medical Breathing Air . The Plant Multiplex Oil-Less Scroll Air Compressors With Oneasme Tank, Two Medical Desiccant Air Dryer System, Safety & Pressure Gauges, Two Set Of Four Stage Filteration System For Breathing Air, One Dew Point Monitor, One Carbon Dioxide Monitor And One Medical Control Panel. The Complete Package Will Be Pre-Wired, Pre-Piped With Single Point Connections For Electrical, Intake Air, Discharge Air And Condensate Drain.Direct Drive Compressors Will Not Be Used. Composite Ptfe Tip Seals Rated At 10, 000 Hours Operation Will Be Used. Compressor Bearings Will Be External To The Air Compression Chamber. Compressors Will Have An Integral Radial Flow Fan For Cooling And Will Not Require Any Additional Electric Cooling Fans. Each Compressor Will Be Driven By A Motor Of1750 Rpm, Odp, Nema Construction Motor. The System Will Include An Asme Air Receiver Rated 200 Psi Mawp. The Tank Will Be Equipped With A Pressure Gauge, Safety Relief Valve, Block & By-Pass Valves And Condensate Sight Gauge And Automatic Electronic Tank Drain With Manual Override. Vertical Receiver Will Be Internally Lined With An Fda Approved Material For Corrosion Resistance. 674 Suply Installation Testing And Commissiong Ofward Suction Unit ( Imported ) With Above 1000 Ml Sucton Collection Jar As Per Specifications And Ce Marked : Vaccum System Importedpneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Gregerson-Germany Imported Oil Sealed Rotary Vane Medical Vacuum System Vacuum System Shall Be Triplex System Total Capacity ( Running + Stand By ) 144 Cfm / 4000 Lpm At 19” Hg To Be Delivered To The Hospital With Necessary Requirement Of Relevant International Standard The Oil Lubricated Rotary Vane Duplex Medical Vacuum System Will Provided Superior Performance With Minimal Maintenance. The Packaged System Will Contain All Necessary Controls And Components To Meet Or Exceed Nfpa99c-2005 Recommended Guidelines. Systems Will Beavailable In Simplex And All Multiplex Arrangements. The Factory Packaged Vacuum System Consists Of Rotary Vane Vacuum Pumps, Pre-Wired Control Panel, Receiver, And Interconnecting Wiring And Piping, Requiring Only Two Plumbing Connection. The Medical Vacuum Systems Will Beavailable As Base Mounted With Vertical Receiver.The Vacuum Pumps Will Be Continuous Duty, Rotary Vane, Oilsealed, Air Cooled, Direct Driven Units Capable Of Continuous Operation Over A Working Range Of 18” To 29” Hg. Each Pump Will Have Single Shaft Seals And Will Be Equipped With An Automatic Gas Ballast Valve To Prevent Condensation Of Water Vapor, Extending The Life Of The Oil And The System. The Pump Will Include An Integral, Multi- Stage Oil-Removal System Featuringa Built In Exhaust Demister That Will Remove And Reclaim 99.9% Of The Exhausted Oil.Additionally Each Pump Will Include Exhaust Back Pressure Gauge To Indicate The Need For Filter Maintenance And An Oil Sight Glass For Monitoring Oil Level. Lubrication Will Be Provided By The Integral, Fully Recirculating Oil Supply. The Pump Inlet Will Beprotected By Means Of A Wire Mesh Screen. An Internal Anti-Suckback Valve Will Be Included To Prevent Oil From Entering The Vacuum Piping Network. Pump Vanes, Because Of Their Construction, Will Provide Superior Heat Transfer And Long Life. The Pumps Will Be Dynamically Balanced And Virtually Vibration Free. 675 Supply Installation Testing And Commissining Of Medical Vacuum Plantas Per Technical Specificatins Nfpa-99 ( Imported ) : Vaccum System Importedpneumatik Berlin- Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Gregerson-Germany Imported Oil Sealed Rotary Vane Medical Vacuum System Vacuum System Shall Be Triplex System Total Capacity ( Running + Stand By ) 144 Cfm / 4000 Lpm At 19” Hg To Be Delivered To The Hospital With Necessary Requirement Of Relevant International Standard The Oil Lubricated Rotary Vane Duplex Medical Vacuum System Will Provided Superior Performance With Minimal Maintenance. The Packaged System Will Contain All Necessary Controls And Components To Meet Or Exceed Nfpa99c-2005 Recommended Guidelines. Systems Will Beavailable In Simplex And All Multiplex Arrangements. The Factory Packaged Vacuum System Consists Of Rotary Vane Vacuum Pumps, Pre-Wired Control Panel, Receiver, And Interconnecting Wiring And Piping, Requiring Only Two Plumbing Connection. The Medical Vacuum Systems Will Beavailable As Base Mounted With Vertical Receiver.The Vacuum Pumps Will Be Continuous Duty, Rotary Vane, Oilsealed, Air Cooled, Direct Driven Units Capable Of Continuous Operation Over A Working Range Of 18” To 29” Hg. Each Pump Will Have Single Shaft Seals And Will Beequipped With An Automatic Gas Ballast Valve To Prevent Condensation Of Water Vapor, Extending The Life Of The Oil And The System. The Pump Will Include An Integral, Multi-Stage Oil-Removal System Featuringa Built In Exhaust Demister That Will Remove And Reclaim 99.9% Of The Exhausted Oil.Additionally Each Pump Will Include Exhaust Back Pressure Gauge To Indicate The Need For Filter Maintenance And An Oil Sight Glass For Monitoring Oil Level. Lubrication Will Be Provided By The Integral, Fully Recirculating Oil Supply. The Pumpinlet Will Beprotected By Means Of A Wire Mesh Screen.An Internal Anti-Suckback Valve Will Be Included To Prevent Oil From Entering The Vacuum Piping Network. Pump Vanes, Because Of Their Construction, Will Provide Superior Heat Transfer And Long Life. The Pumps Will Be Dynamically Balanced And Virtually Vibration Free. Each Pump Will Be Driven By A Direct Flanged Three-Phase, Standard Tefc Motor Via A Pin And Bush Coupling. The Pump Will Operate At 83 Dba, . Pumps Require Standard Automotive Garde Sae-30 Nondetegent Oil For Lubrication. The Ul Listed Electrical Control Panel Will Be Mounted In A Nema 12 Control Cabinet. 676 The Standard Control Panel Includes The Following Components: Integral Circuit Breaker Disconnected With Door Interlock, Across-The-Line Motor Starters With Three-Phase Overload Protection A Programmable Logic Controller To Cycle Lead Pump With Each Use Hand Off Automatic Selector Switch For Each Pump. Lag Pump In Use Indicator Light With Horn And Connection For Remote Annunciation. Hour Meters To Monitor Factory Recommended Service Intervals. Pump Running Lights To Indicate Pump In Operation.Each System Willincludes An Asme Coded Receiver Rated For Full Vacuum Service. The System Receiver Will Includes A 4-1 / 2” Vacuum Gauge, Manual Drain, And Three- Valve Bypasss. Additionally, Each System Will Include Properly Sized Inlet And Exhaust Flex Connectors And Vibration Isolation Pads For Field Installation. The Vertical Receiver Will Be Internally Lined With An Fda Approved Material For Corrosion Resistance.The Pump Has The Facility That In Case One Pump Stop The Standby Pump Will Automatically Start. If Any Pump Fails The System Will Automatically Revert To The Stand By Pump. All The Status Monitoring Of The Pump Can Be Connected To The Master Alarm.The System Will Also Includes Factory Installed 5 Micron Pump Inlet Filters As Per Nfpa- Guidelines To Promote Longer Life. The System Is Supplied With Silencer And Bacterial Filters. 677 Each Pump Will Be Driven By A Direct Flanged Three-Phase, Standard Tefc Motor Via A Pin And Bush Coupling. The Pump Will Operate At 83 Dba, . Pumps Require Standard Automotive Garde Sae-30 Nondetegent Oil For Lubrication. The Ul Listed Electrical Control Panel Will Be Mounted In A Nema 12 Control Cabinet. The Standard Control Panel Includes The Following Components: Integral Circuit Breaker Disconnected With Door Interlock, Across-The-Line Motor Starters With Three-Phase Overload Protection A Programmable Logic Controller To Cycle Lead Pump With Each Use Hand Off Automatic Selector Switch For Each Pump. Lag Pump In Use Indicator Light With Horn And Connection For Remote Annunciation. Hour Meters To Monitor Factory Recommended Service Intervals. Pump Running Lights To Indicate Pump In Operation.Each System Willincludes An Asme Coded Receiver Rated For Full Vacuum Service. The System Receiver Will Includes A 4-1 / 2” Vacuum Gauge, Manual Drain, And Three- Valve Bypasss. Additionally, Each System Will Include Properly Sized Inlet And Exhaust Flex Connectors Andvibration Isolation Pads For Field Installation. The Vertical Receiver Will Be Internally Lined With An Fda Approved Material For Corrosion Resistance.The Pump Has The Facility That In Case One Pump Stop The Standby Pump Will Automatically Start. If Any Pump Fails The System Will Automatically Revert To The Stand By Pump. All The Status Monitoring Of The Pump Can Be Connected To The Master Alarm.The System Will Also Includes Factory Installed 5 Micron Pump Inlet Filters As Per Nfpa-Guidelines To Promote Longer Life. The System Is Supplied With Silencer And Bacterial Filters. 678 Supply Installation, Testing And Commissioning Of Theatre Suctin Unit ( Imported ) With 2 Nos. 2000 Ml Jars As Per Technical Specifications Ce Marked : Ward Vaccum Unit ( Imported ) Tri-Tech Medical -Usa / Flowmeter-Italy / Medepha-Italy / Powerex-Usa European Ce Marked W.V.Unit Should Have Soft Touch Knob For Easy Access To ( A ) On / Off Mode ( B ) Regulation Mode ( C ) Full Flow Of Vacuum Pressure Directly Form Vacuum Line. Mode. The Analogue Gauge Should Have 2’’ Dia Color Coded; Glow – In – The – Dark Face For Easy Readability Under Any Condition. High Vacuum Setting 0-760 Hg. Suction Jar Should Be Made Of Polycarbonate Autoclave Up To 121ºc. The Jar Capacity Is 1000 Ml.The Float & Cap Assembly Includes A Patient Port Inlet That Is Horizontal To Help Prevent Kinking Of Suction Tubing . All Collection Bottle Assemblies Allow Visual Inspection Of Fluid Level, Color & Consistency & Can Be Steam Autoclaved Or Gas Sterilized. Polycarbonate Bottles Offer The Additional Advantage Of Eliminating Breakage. Filter Is Designed To Help Protect The Vacuum System From Contamination Due To Aerosols Or Collection Bottle Overflow. This High Efficiency Bacteria Filter Features A Hydrophobic, Micro- Porous Membrane Which Filters Air With Maximum Efficiency While Helping Block The Flow Of Aqueous Fluids And Aerosol Contaminants. Filter Efficiency Is Superb: 99.97% D.O.P. Retention ( .3 Micron Particle Size ) . Filters Are Available With 1 / 8 Npt Male Pipe Thread On One End To Connect To Almost Any Vacuum Regulator And A ¼ Hose Barb For Connection Of Vacuum Tubing. 679 Supply Installation Testing And Commissioning Of High Pressure Hose Antistatic Duly Colour Coded For Oxygen , Nitrous Oxide Compressed Air And Vacuum As Per Technical Specification . ( 100 Mtrs. Of Each Colour ) ( Imported ) : It Should Be As Per Internationalstandard, Antistatic And Colour Coded Rubber Tube – White For Oxygen, Blue For Nitrous Oxide, Black For Compressed Air And Yellow For Vacuum. And Low Pressure Tubes For Vacuum Application. 680 Supply Installation Testing And Commissioning Of Horizontal Bed Head Panel - ( Imported ) : Bed Head Panels --Horizentalpneumatik Berlin-Germany / Tri-Tech Medical - Usa / Modular -Usa / Medepha-Italyce Marked / Ul Listed It Should Provide A Safe Efficient Means Of Delivering Services To Patients Staff In Both General And Special Care Applications, It Is Modular Design Made Of Horizontal Aluminium Extrusions, And Ability To House Medical Gas Termainal Units ( As Per Specifications Of Tender ) And Electrical Socket , Smooth Curved Surfaces, No Visible Screws And Choice Of Coloured Décor Stripe, Ease Of Installation Via Separate Rail-Bracket Or Wall Mounting Plates, Easy Removal Of Covers For Maintenance And Pipeline Connection, With Integral Twin Medical Rail As Part Of The Modular Extrusion Design. It Has Segregation Of Services I.E. Extra Low Voltage, Normal Voltage And Medical Gases , Should Be Maintained Througthout . Its Aluminium Extrusions Have A Polyester Coating Finish On All External Surfaces. It Have Provision For Nurse Call, Data Or Monitoring Sockets, Should Be Made At The Point Fo Manufacture .It Should Be Supplied Duly Prepiped , Prewired And Fully Tested Or In Carcass Form. Each Horizontal Bed Head Panel Shall Be Having A Provision Of ( As Per Outlet Distribution List ) - Four Multipin 5-15 Amps , Switch Socket Outlet Combine - It Should Be 1500 Mm Long.Provision For Nurse Call 681 Supply, Installation, Testing And Commissioning Of Single Armceilling Pendent For The O.T. ( Imported ) As Per Technical Specfication :Singlearmpendant For Operation Theatre – ( Imported ) Ce Marked, Make – Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Modular -Usa / Medepha-Italy Multimovement Pendentshould Benew Design Motorized Singlearm ( 900Mm ) With Up & Down Movement Of 515 Mm And Load Carrying Capacity Of 100-150 Kg. The Arm Should Rotated Upto 330º- 340ºwith Adjustable Stopper. An Extremely Quite Electric Motor Should Reducenoisetoaminimum, Dampenedstoppersandverylowhandforcesforhorizontal Movements Shouldcontributeto Anergonomically Optimisedworkplace. The Pneumatic Brake System Should Adapted To Various Safety Requirements And Construction Facilities. Modern And Very Quite, High Performance Motors Shouldwell Special Spindles Should Be Used To Realise Precise & Steady Movement. As A Safety Feature The Motor Should Equipped With An Over Load Protection. The Large Interior Cross Section For Supplylines Offersshouldcompletely New Applications With 120Mm Diameter. The Stoppersshouldbeinfinitely Variable From 0-330º-340ºService Headshouldbe Provided With The Modular Designto Achieve Maximum Supply With Minimum Required Space.Service Head Should Designed To Host, Base, Gas Module, Electric Module And Shelves . Upto 8 Gas Outlets & 10 Electrical Switches.Racks & Shelves Should Be Provided To Mount The Equipments Like Monitor Etc. The Total Length Of The Manager Should Be800mm.Pendent Should Be Have 1 Arms With Shelves As Per Following Details:A. Horizontal Arm System - 1B. Weight Carrying Capacity - 100-150 Kgc. 5 / 15 Amp. Electrical Sockets Without Switches - 8 To 10 Nos. D.Shelfs With Side Rails -2 Nos.E.Provision To Fix Gas Outlets ( I.E. ) As Per Distribution Chartf. Gas Interface Set For Interface Plate-1G.Ceiling Mounting System For Interin Ceiling Upto 1000- 1H. Interface Plate With Electrical Fittings -1I. Ceiling Cover For Interin Ceiling -1 682 Supply, Installation, Testing And Commissioning Of Double Armceilling Pendent For The O.T. ( Imported ) As Per Technical Specfication : Swievel Double Arm Surgeon Pendent ( Imported ) Make – Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Modular -Usa / Medepha-Italy Ce Marked Multimovement Pendentis A New Design Motorized ( 1000+800 ) Arm With Up & Down Movement Of 515 Mm And Load Carrying Capacity Of 80 Kg. The Arm Can Be Rotated Upto 330º- 340ºwith Adjustable Stopper. An Extremely Quite Electric Motor Reduces Noise To A Minimum, Dampened Stoppers And Very Low Hand Forces For Horizontal Movements Contribute To An Ergonomically Optimised Workplace. The Newly Developed Pneumatic Brake System Can Be Adapted To Various Safety Requirements And Construction Facilities. Modern And Very Quite, High Performance Motors As Well Special Spindles Are Used To Realise Precise &Steadymovement.Asasafetyfeaturethemotorisequippedwithanoverloadprotection.Thelargeinteriorcrosssectionforsupplylinesofferscompletelynew Applications With 120 Mm Diameter. The Stoppers Are Infinitely Variable From 0-330º-340º Service Head Is Provided With The Modular Designin Shape To Achieve Maximum Supply With Minimum Required Space.Service Head Is Designed To Hosts, Base, Gas Module, Electric Module And Shelves . Upto 8 Gas Outlets & 10 Electrical Switches.Racks & Shelves Are Provided To Mount The Equipments Like Monitor Etc. The Total Length Of The Manager Is 1000Mm. Surgeon Pendent Will Have 2 Arms With Shelves As Per Following Details:A. Horizontal Arm System - 2B. Weight Carrying Capacity - 80Kgc. 5 / 15 Amp. Electrical Sockets Without Switches - 8Nos. D.Shelfs With Side Rails -2 Nos.E.Provision To Fix Gas Outlets ( I.E. ) Oxygen- 2, Vaccum- 2, Air 4 Bar-1, Air 7 Bar-1 & Wagd-1 No.F. Gas Interface Set For Interface Plate-1G.Ceiling Mounting System For Interin Ceiling Upto 1000- 1H. Interface Plate With Electrical Fittings -1I. Ceiling Cover For Interin Ceiling -1 683 Supply, Installation, Testing And Commissioning Of Compressors Wagd / Agss Sysytem Per Technical Specifications.Nfpa-99 ( Imported ) : Waste Anasthetic Gas Disposal System ( Wagd ) As Per Nfpa 99 Std For Ot ( 1 Working + 1 Standby ) Imported Pneumatik Berlin-Germany / Tri-Tech Medical -Usa / Phoenix-Pipeline-Uk / Gregerson- Germany As Per Nfpa99 Latest Editionthe Oil Less Rotary Vane Medical Vaccumsystem Total Capacity17 Cfm / 500 Lpm ( Running + Stand By ) Tankmounted On Horizantal Reservior Provides Superior Performance With Minimal Maintenance. The Packaged System Contains All Necessary Controls And Components To Exceed Nfpa 99C-2005 Std Latest Edition Recommended Guidelines. The Wagd Pumps Are Continuous Duty Dry-Running Units With Carbon Graphite Self-Lubricating Rotaryvanes. The Pumps Are Air Cooled And Direct Driven, Capable Of Continuous Operating Over A Working Range Of 0 To 25.5 Hg. The Pumps Are Completely Self-Contained Units, Requirngno External Coolers, Pumps, Separators Or Reservoirs. Lubrication Is Provided By The Self-Lubricating Self-Adjusting Carbon Graphite Vanes. The Carbon Graphite Vanes Have A Life Of 8, 000 To 15, 000 Hours, Depending On The Size Of The Pump. The Pump Inlet Is Protected By Means Of An Integral, 5 Micron Inlet Filter. Therotary Design Is Dynamically Balanced And Virtually Vibration Free. The Pumps Are Constructed Of Heavy-Duty Aluminum Alloy, Providing Superior Heat Transfer And Long Life. The Pumps Are Equipped With Large Cooling Fins And A Sound-Attenuating Enclosure To Assure Cool, Quiet Operation. Remote Switches Are Not Required For Wagd System As Per Nfpa-99 Guidelines. The Wagd Arrangement Has A Reservoir Hence It Provides The Wagd Service Round The Clock. We Are Providing Duplex Model Of Wagd. If Pump In Use Fails Second Pump Will Start Automatically Without Fluctuating In Line Pressure. This Model Operate At 83 Dba. The Pumps Require No Oil Or Other Service Liquid For Operation. Each Pump Is Driven By A Direct-Flanged Three-Phase Standard Tefc Motor Via A Pin And Bush Coupling. The Ul Listed Electrical Controls Are Mounted In A Nema 12 Control Cabinet. The Standard Controls Include: Combination Circuit Breaker Disconnects, Non Reversing, Across-The Line Motor Starter With Three-Phase Overload Protection A Programmabel Controller To Cycle Lead Pump With Each Use. Hand-Off Automatic Selector Switches Lag Pump In Use Indicator Light With Horn And Connection For Remote Annuncation Hour Meters To Monitor Factory Recommended Service Intervals Running Lights Indicating Pump In Operation. 684 The System Is Supplied With Properly Sized Inlet, Discharge Flex Connectors And Vibration Isolation Pads For Field In Stallation. As Options, The System Can Be Supplied With A Discharge Silencer And / Or Bacterial Filters For Field Installation. The System Includes An Asme Coded Receiver Rated For Full Vaccum Service. The Receiver Includes A 4-1 / 2 Vaccum Gauge, Manual Drain, And Three-Valve By Pass. 685 Supply, Installation, Testing And Commissioning Of S / I / T / Cofmedical Linevalve, Asperce Certified / Ul Listed Aspertechnicalspecifications : Medical Linevalve, Asperbsen1057standradsas Pertechnical Specifications Isolating Valve Rb / Rn / Sim / Audco All Ball Valves As Per Bs 1057Are Rated At 400 Psig, As Well As Full Vacuum ( 29.9 Hg ) . Valves Go From Full On To Full Offby Turning The Vinyl-Gripped Valve Handle 900 Locking-Type Handles May Be Ordered Separately Whenrequired. Copper Tubing Is Factory Installed To Help Prevent Valve Seat Damage During Soldering. Main And Riser Valves Are Not Required To Be Installed In A Box Unless Specially Noted Or Required. 686 15Mm Od 687 22Mm Od 688 28Mm Od 689 42Mmod 690 54Mmod 691 Mechanical Laundary Plant 692 Supply , Installation , Testing & Commisioning Of 25Kg Capacity, Side Loadingmachine ( Slucing Machine ) , Steam Heated :- 693 Supply , Installation , Testing & Commisioning Of 50Kg Capacity, Side Loading Washing Machine, Steam Heated 694 Supply, Installation, Testing And Commissioningof 50 Kg Heavy Duty Hydro Extractor 695 Supply, Installation, Testing And Commissioningof 50Kg Capacity, Heavy Duty Drying Tumbler 696 Supply, Installation, Testing And Commissioning Of Single Roll Flat Work Ironer ( Calendering Machine ) , Single Roll, Electrically Heated, 375Mm X 1830Mm 697 Supply, Installation, Testing And Commissioning Of Flat Bed Press, 1500X750 698 Supply, Installation And Commissioning Of Table Mounted Electric Hand Iron:Technical Specification For Electric Hand Iron With Table• Heavy Duty Electric Hand Iron: 1Kw• The Electric Hand Iron Shall Be Manufactured Out Of Gun Metal And Cast Iron.• Wooden Top Table On Structural Steel Frame Work.• The Manufacturer Should Have Iso 9001: 2015 Quality Management System• The Supplier Should Agree For Demonstration Of The Quoted Model, If Needed By The End User 699 Supply, Installation, Testing And Commissioning Of Wet Linen Trolley : -Technical Specification For Wet Linen Trolley Purpose: To Transport / Carry The Wet Linen Description: Complete Stainless Steel Constructionfor Long Rust Free Life. Trolley Sides Have Pressed Ribs For Extra Strength. Corners Would Be Rounded For Easy Movement And Fitted With Rubberbumpers To Avoid Any Damage. These Trolleys Would Be Mounted With 4 Nos. Swiveling Type Rubber Wheels On Ball Bearings.; These Trolleys Have Aperforated S.S. Mesh At The Bottom Are Fitted With A Drain Valve. The Front Two Castors Are Fixed Type And The Rear Two Are Of Swivelling Type.;Wheels: 4” Dia Thread Free Castors Overall Size: 800Mm Length X 600Mm Width X 710Mm Height The Manufacturer Should Have Iso 9001: 2015Quality Management System The Supplier Should Agree For Demonstration Of The Quoted Model, If Needed By The End User 700 Supply, Installation, Testing And Commissioning Of Dry Linen Trolley: Technical Specification For Dry Linen Trolley Purpose : To Carry The Dry Linen Description : Complete Stainless Steel Construction For Longrust Free Life. Trolley Sides Have Pressed Ribs For Extra Strength. Corners Would Be Rounded For Easy Movement And Fitted With Rubber Bumpers Toavoid Any Damage. These Trolleys Would Be Mounted With 4 Nos. Swiveling Type Rubber Wheels On Ball Bearings., The Trolley Is Designed For Lightweight, Rugged And Easy Manoeuver. Four Castors Are Provided In The Frame.; Wheels: 4” Dia Thread Free Castors Overall Size: 1000Mm Length X600mm Width X 810Mm Height The Manufacturer Should Have Iso 9001: 2015 Quality Management System The Supplier Should Agree For Demonstration Of The Quoted Model, If Needed By The End User 701 Supply, Installation, Testing And Commissioning Of Finish Linen Rack :Technical Specification For Finish Linen Storage Rack• Floor Mounted, Storage Rack With Five Nos. Shelves Are Used To Store The Linen• Frame Is Fabricated Of 40Mm Square Stainless Steel Pipes.• The Legs Are Provided With Adjustable Nylon. Bullet Feet.• The Shelves Are Fabricated Of 16 Swg Stainless Steel Sheets Ground Polished To Smooth Surface. Edges Are Welded Together & Polished At Corners.• Overall Size: 1830Mm Length X 535Mm Width X 1830Mm Height• The Manufacturer Should Have Iso 9001: 2015 Quality Management System• The Supplier Should Agree For Demonstration Of The Quoted Model, If Needed By The End User 702 Supply, Installation, Testing And Commissioning Of Air Compressor, 3 Hpwith 160 Litres Tank, Motor Capacity Shall Be 3 H.P.Comlete All As Per Directed By Engr-In-Charge. 703 Supply, Installation, Testing And Commissioning Of Steam Boiler 600 Kg Non Ibr The Boiler Should Be Of Coil Design Pressure Switch Should Have One No-Nc Point Which Indicates Level Of Water In Feed Water Tank Limit Switch Of The Boiler Should Have No-Nc Point Which Indicates Blow Down Valve Open And Close Condition Tic Of The Boiler Should Have No-Nc Point Which Indicates The Temperature Boiler Should Start Giving Steam In Less Than 10 Minutes Time Frame Boiler Should Have Reverse Flame Design For High Turbulence Boiler Should Be Double Jacket Design Boiler Should Have Stainless Steel Inner Shell The Manufacturer Should Have Iso 9001:2015 Quality Management System The Supplier Should Agree For Demonstration Of The Quoted Model, If Need By The And User 704 Supply, Installation, Testing And Commissioning Of Vacuum Table: Vaccum Ironing Table Heavy Duty Electric Iron - 1Kw The Ironing Table Should Have Foam, Cloth, Antina, Spring Set, Linen Rack Table Size Should Be Minimum 30*48*50 Table Motor Should Be Of Minimum 1Hp With Heavy Blower On The Top Of Motor For Heavy Suction The Manufacturer Should Have Iso9001:2015 Quality Management Systemthe Supplier Should Agree For Demonstration Of The Quoted Model, If Need By The And User 705 Supply, Installation, Testing And Commissioning Of Mto Dry Cleaning 15 Kg : Mto Dry Cleaning Machine ( 15Kg ) The Machine Should Have An Inner Drum Of 15Kg Capacity Inner Drum Of The Machine Should Be Of Aisi 304 Grade The Machine Should Have A Minimum Of .37Kw Capacity The Extracting Motor Should Be Of Minimum 1.5Kw Capacity Minimum Inner Drum Size Of The Machine Should Be 700Mm*470Mm Minimum Inner Drum Volume Should Be 180Ltrs Machine Should Have Minimum 3 Filters For The Maximum Recovery Of The Fuel The Manufacturer Should Have Iso 9001:2015 Quality Management System The Supplier Should Agree For Demonstration Of The Quoted Model, If Need By The And Usermake:-Grandimpianti / Cleancare / Steris / Gettinge 706 Supply, Installation, Testing And Commissioning Of Marble Table: Marble Table Heavy Duty Electric Iron- 1Kw Table Should Be Made Of Ss 304 In The Bottom And Marble Surface Tablesize Should Be Minimum 30*48*50The Manufacturer Should Have Iso 9001:2015 Quality Management System The Supplier Should Agree For Demonstration Of The Quoted Model, If Need By The And User 707 Special Lifts 708 Design Manufacture, Supply, Installation, Testing And Commisioning Of Minimum Of 20 Passenger ( 1360 Kg ) Machine Room Less Gearless Machine, 0.50 M / Sec Speed And Handing Over The Same To The Owner In Satisfactory Working Condition With A.C. Variable Voltage And Variable Freqency ( V3f ) Control Microprocessor Based, Selective-Collective Duplex Control, Directional Control Of Cars, Scratch Free Stainless Steel ( Ss ) Hairline Finish Enclosure, Car Ventilation, Automatic Central Clear Opening Car Doors Minimum Of ( 1000Wx2400h ) Suitable For Hospital Strecher, Car Illumination & Fan, Full Height Infrared Safety Curtain, Centre Opening, Landing Doors And Flooring With Smooth Anti Skid Surface, Strong Enough To Take The Rated Load Without Any Deformation Or Damage, Including All Approvals By Local Bodies, State / Central Statutory Bodies, One Month Trial Operation, Testing At Designed Load, Safety Checks, Sudden Breaks Check, Speed Check Or Any Other Test Check As Required By Engineer-In-Charge / Owner. The Cost Shall Include 24 Months Free Comprehensive Maintenance For Defect Liability Period After Completion Of Work And Handing Over Of The Lift In Satisfactory Working Condition. The Offer Shall Also Include Automatic Rescue Device For Automatic Anchoring Of The Lift At Nearest Floor In Case Of Power Failure, And Intercom Facility As Per Specifications. Available Clear Lift Well As Per Architectural Layouts ( 2300 W X 3050 D ) To Serve Upto Floors ( G+5 Floors ) Lift 5, 6 ( 2 Special Lifts ) . 709 Labour Room 710 Supply & Installation Of Walls Of Sms Material European Ce Marked ( Imported ) As Per Specification. 711 Supply & Installation Of Ceiling Of ( Imported ) European Ce Marked As Per Specification. 712 Supply & Fixing Double Peripheral Lights-Indigenous- ( Cladding Type Ot ) As Per Technical Specifications 713 Supply & Fixing Seamless Gerflor Make Flooring With Perfectly Curved Flsh-Covings Resistance To Mechanical Stress And Dynamic Load And Having Esd / Emi ( Conductive ) Protection 714 Supply & Fixing Storage Unit Size 1666 X 865 X 350 Having Two Shelves & Stainless Stell Having 5Mm Thick Glass Door & Mounted Flush With The Theatre Wall. 715 Cascased Pressure Stablizer Having Multi 304 Grade Stainless Steel Blades To Control Room Pressure 716 Supply & Fixing Automatic Sliding Door- As Per Technical Specification Size 1500 X 2100 ( Imported ) 717 Supply & Fixing For Each Bed With Curtain At Entrance 718 Supply & Fixing Icu Ceiling Pendent All As Specified & As Directed By Engineer-In-Charge 719 Supply & Fixing Touch Surgeon Control Panel With Screen Not Less 22 - ( Imported ) As Per Technical Specification 720 Supply & Fixing Writing Board With Magneting Size :- 1000 X 700 X 60 Deep Made Out G.P Sheet To Be Flushed With The Wall System Complete Set As Per Enclosed Tender 721 Supply & Fixing X-Ray Viewing Screen - ( Cladding Type Ot ) As Per Technical Specification 722 Insentive Case Unit ( Icu ) 723 Supply & Installation Of Walls Of Sms Materail European Ce Marked ( Imported ) As Per Specification 724 Supply & Installation Of Ceiling ( Imported ) European Ce Marked As Per Specification 725 Supply & Fixing Double Peripheral Lights-Indigenous- ( Cladding Type Ot ) As Per Technical Specifications 726 Supply & Fixing Seamless Gerflor Make Flooring With Perfectly Curved Flsh-Covings Resistance To Mechanical Stress And Dynamic Load And Having Esd / Emi ( Conductive ) Protection Charateristics 2Mm Thick, Washable-Complete. 727 Supply & Fixing Storage Unit Size 1666 X 865 X 350 Having Two Shelves & Stainless Stell Having 5Mm Thick Glass Door & Mounted Flush With The Theatre Wall. 728 Supply & Fixing Cascased Pressure Stablizer Having Multi 304 Grade Stainless Steel Blades To Control Room Pressure 729 Supply & Fixing Automatic Sliding Door- As Per Technical Specification Size 1500 X 2100 ( Imported ) 730 Supply & Fixing Partion For Each Bed With Curtain At Entrance 731 Supply & Fixing Icu Ceiling Pendent Duly Ce Marked With Notified Body 4 Digit No. 732 Supply & Fixing Touch Surgeon Control Panel With Screen Not Less 22 - ( Imported ) As Per Technical Specification 733 Supply & Fixing Writing Board With Magneting Size :- 1000 X 700 X 60 Deep Made Out G.P Sheet To Be Flushed With The Wall System Complete Set As Per Enclosed Tender Technical Specifications 734 Supply & Fixing X-Ray Viewing Screen - ( Cladding Type Ot ) As Per Technical Specification 735 Modular Operation Theatre 736 Supply & Installation Of Walls Of Sms Material ( Imported ) As Per Specifications 737 Supply & Installation Of Ceiling Of ( Imported ) As Per Specification 738 Supply & Fixing Planair Ceiling ( Plenum Box - Air Diffuser ) - ( Imported ) As Per Technical Specifications 739 Supply & Fixing Double Peripheral Lights-Indigenous- ( Cladding Type Ot ) As Per Technical Specifications 740 Supply & Fixing Touch Surgeon Control Panel With Screen Not Less 22 - ( Imported ) As Per Technical Specification 741 Supply & Fixing X-Ray Viewing Screen - ( Cladding Type Ot ) As Per Technical Specification 742 Supply & Fixing Static Dissipative Flooring ( Tile Form ) - ( Cladding Type Ot ) As Per Technical Specifications 743 Supply & Fixing Scrub Station - ( Cladding Type Ot ) As Per Technical Specifications 744 Supply & Fixing Automatic Sliding Door- As Per Technical Specification Size 1500 X 2100 ( Imported ) 745 Supply & Fixing Automatic Sliding Door- As Per Technical Specification Size 1000 X 2100 ( Imported ) 746 Supply & Fixing Writing Board With Magneting Size :- 1000 X 700 X 60 Deep Made Out G.P Sheet To Be Flushed With The Wall System Complete Set As Per Enclosed Tender Technical Specifications 747 Supply & Fixing Storage Unit Size 1666 X 865 X 350 Having Two Shelves & Stainless Stell Having 5Mm Thick Glass Door & Mounted Flush With The Theatre Wall. 748 Supply & Fixing View Window 1000 Mm X Mm With Motorised Binds As Per Enclosed Tender Technical Specification 749 Supply & Fixing Digital Display Touch Screen Size Not Less Than 30 ( Work Station ) With Steel Painted Outer Case As Per Enclosed Tender Technical Specification ( Importyed ) 750 Supply & Fixing Electrical Wiring Inside Ot 751 Supply & Fixing Ot Light Double Combination Ot Ceiling Light With Led Technology - Imported European Ce & Us Fda Marked As Per Technical Specification Enclosed 752 Ot Light Hd Camera 753 Supply & Fixing Ot Light Monitor 754 Supply & Fixing Ot Table : Imported European Ce & Us Fda Marked As Per Technical Specification Enclosed

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-Jul-2022 Date Corrigendum No 1 Date 12-08-2022
2 03-Aug-2022 corrigendum2 Date 19-08-2022
3 10-Aug-2022 Corrigendum 3 Date 29-08-2022
4 22-Aug-2022 corrigendum 4 Date 06-09-2022
5 27-Aug-2022 Amendment in dates Date 14-09-2022
6 06-Sep-2022 corrigendum 5 Date 22-09-2022
7 13-Sep-2022 amendment 6 Date 03-10-2022
8 26-Sep-2022 corrigendum 7 Date 15-10-2022
9 06-Oct-2022 corrigendum8 Date 22-10-2022
10 22-Oct-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 29-10-2022

Key Value

Document Fees
INR 3000 /-
EMD
INR 1500000.0 /-
Tender Value
INR 125 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail