Indian Oil Corporation Limited-IOCL has published Project Management Consultancy Services For Const Of Peb Shed With Intermediate Floors For Speciality Oil Plant Incl Land Devl Elect Driveways Tlf Gantry Pumphouse Vert Storage Tanks Process Units For Spec Oil Prod Etc At Iocl Lbp Budge Budge Wb. Submission Date for this Tender is 18-07-2022. Tanks and Cylinders Tenders in Mumbai Suburban Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 22-Jun-2022 | Corrigendum 1 for VC Links for PreBid Meeting | Other | 11-07-2022 |
2 | 11-Jul-2022 | Corrigendum 2 for Bid Extension | Date | 18-07-2022 |
Sl. No. | Item Description |
1 | The vendor shall depute / appoint qualified Engineers/Project Manager as per requirement given below for individual package-wise works for carrying out:Consultancy Services for Project Management. Checking & certifying detailed engineering. Construction Management & Execution planning. Supervision at project site, works certification. Assistance in Start-up, Commissioning & Performance test runs for all packages of the project. QAP for all packages /works, Checking/ approving vendor"s quality assurance system and preparing & implementing quality assurance system. Checking & Approval of fabrication/ construction drawings/ As Built Drawings etc. Progress monitoring, Conducting safety audits. Carrying out QRA as per OISD. Visit to Vendor"s premises for Inspections /Factory Acceptance Test and taking part in Site Acceptance Tests. Site supervision, recording of deviations, taking any decision from Corporation, quality test of ongoing works and recording thereof, getting work done as per QAP within time schedule, recording of measurements, checking & certification of bills. The Site Engineer of Consultant should have experience in construction field of not less than five years. Details of experience of site engineer to be provided by appointed Consultant before deputing his engineer / engineers for work on their letterhead with documentary proof. One (1) engineer per month (30 days) shall be taken as 1 manmonth. In case the works are completed during the part month, payment shall be made on prorata for the month considering the month shall comprise 30 days. The charges given in below items shall include the PPE, boarding, lodging, air/rail/road transportation, insurance, local conveyance, communication, stationary, computer & printer and all other incidental charges required for completion ofsite supervision activity for project completion as per tender. Detailed scope of work is provided in tender documents and bidder to refer to the same before submitting the bid. |
2 | Site supervision for Civil Works - Total Lump Sum charges for services towards site supervision for all Civil works as given in tender and scope of work. |
3 | Site supervision for Works other than civil works- Total Lump Sum charges for services towards site supervision for Works other than civil works as given in tender and scope of work. |
4 | Project Management Services for complete project - Total Lump Sum charges for services towards Project management for all Civil works, Mechanical & Electrical works as given in tender and scope of work. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail