Power Government Departments Closing in 0 days TDR #32752273

supply installation , testing , commissioning Sitc Supply, Installation, Testing And Commissioning For Creation Of 63 Kva Sub Station Along With Ht Lt Network At Sarulla Upper Manjakote Under B2v3 On Turnkey Basis

Issued by Government Departments · manjakote, Jammu And Kashmir
Tender Value
5.34 Lakhs
Estimated cost
Bid Submission
20 Jul 2022
0 days left
EMD
10680
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
manjakote → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

supply installation , testing , commissioning Sitc Supply, Installation, Testing And Commissioning For Creation Of 63 Kva Sub Station Along With Ht Lt Network At Sarulla Upper Manjakote Under B2v3 On Turnkey Basis

BOQ

Name of Work:SUPPLY, INSTALLATION, TESTING AND COMMISSIONING FOR CREATION OF 63 KVA SUB STATION ALONG WITH HT LT NETWORKAT SARULLA UPPER MANJAKOTE UNDER B2V3 ON TURNKEY BASIS(All the items should be as per latest specifications and drawing adopted/Approved by Department)
Sl. No. Item Description
111 KV (HT) Line(Note: For detailed specifications please refer attached SBD which forms a part of the tender)
2Supply, Loading, Transportation, Insurance, Unloading, Carriage,Delivery at Site including handling, preservation and proper storage at site.
38 Mtr. Long ST Poles (410, SP-15)(As per recommended IS/REC Standard)
430 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
5GI Channel Cross-arm (75 x 40x6mm) withGI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. (As per recommended IS/REC Standard)
611 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
711 kV DISC WITH FITTINGS( 45 KN) (As per recommended IS/REC Standard)
8Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete.
9AL PAINT + RED OXIDE.
10Galvanized Nuts and Bolts of sizes.
11Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.01
12Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
13Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
14Fixing / Erection of GI Channel Cross-arm (75 x 40x6mm) withGI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. NOTE: Please refer Pole drawings for details (As per recommended IS/REC Standard)
15Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
16Fixing of 11 kV Disc Insulator with fitting (polymer) with Pins (45 KN) (As per recommended IS/REC Standard)
17Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)
18Painting of poles with one coat of red oxide & 02 coats of silver oxide (As per recommended IS/REC Standard).
19Fixing of Galvanized Nuts and Bolts of sizes.
2011/0.433 kV Distribution Transformer(Note: For detailed specifications please refer attached SBD which forms a part of the tender)
21Supply, Loading, Transportation, Insurance, Unloading, Carriage,Delivery at Site including handling, preservation and proper storage at site of 11/0.433 kV Distribution Transformer.
2263 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
238 Mtr. LongST Poles (410 SP-15)(As per recommended IS/REC Standard)
24Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
2511 kV Horn,Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
2611 kV,G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
27GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
28Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
29185 mm sq Cable PVC FRLS with Al Thimbles
3011 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
3111 kV Disc Insulators (polymer) Complete with fitting (45 KN) (As per recommended IS/REC Standard)
32Galvanized Nuts and Bolts of sizes.
33Sub station earthingby GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm for 1 No. Neutral Earthing and through GI Strip of 25X3 mm for 2 Nos transformer body Earth, 2 Nos Pole Earth, 1 No. LA Earth and 1 No. GO handle Earth (Note: For LA Earth 1 pipe/rod shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and GI Clamps. (As per recommended IS/REC Standard)
34AL PAINT + RED OXIDE.
35Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
36Erection/Installation, Testing and commisioning of material supplied at Sl. No-3.01
37Installation of 63kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
38Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
39Installation of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
40Installation of 11 kV Horn,Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
41Installation of 11 kV,G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
42Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
43Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
44Fixing / Crimping of 185 mm sq Cable PVC FRLS with Al Thimbles
45Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
46Installation of 11 kV Disc Insulators (polymer) Complete with fitting( 45 KN) (As per recommended IS/REC Standard)
47Fixing of Galvanized Nuts and Bolts of sizes.
48Excavation of Earthing Pits of dia = 650 mm and depth= 3000 mm, Installation and fixing of Sub station earthing as per REC approved arrangement/spacing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm 1 nofor neutral earthing and 25X3 mm for 2 Nos transformer body earth, 2 Nos Pole earth, 1 no. LA Earth and 1 no. GO handle earth). (Note: For LA Earth 1 pipe shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and Clamps. Refilled with earth enhancement materials and earthing chamber made of brick masonary with RCC Slab Cover (Proper Earthing Value must be insured) (As per recommended IS/REC Standard)
49Painting of poles with one coat of red oxide & 02 coats of silver oxide (As per recommended IS/REC Standard).
50Fixing of Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
51LT Line(Note: For detailed specifications please refer attached SBD which forms a part of the tender)
52Supply, Loading, Transportation, insurance, Unloading, Carriage,Delivery at Site including handling, preservation and proper storage at site.
538 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
5430 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
55GI Mukky clamps with LT Shackle insulators (polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles.(As per recommended IS/REC Standard)
56AL PAINT + RED OXIDE.
57Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)
58Galvanized Nuts and Bolts of sizes.
59Erection/Installation, Testing and commisioning of material supplied at Sl. No-5.1
60Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
61Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
62Fixing of GI Mukky clamps with LT Shackle insulators(polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles.(As per recommended IS/REC Standard)
63PAINTING OF POLE WITH 01 COAT OF RED OXIDE & 02 COATS OF AL. PAINT.
64Fixing of GGalvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)As per recommended IS/REC Standard)
65Fixing of Galvanized Nuts and Bolts of sizes.

AI Tender Summary

OUR REF NO 32752273
AUTHORITY Government Departments
TENDER VALUE 5.34 Lakhs
LAST DATE 20-07-2022
Authority
Authority Name Power Development Department
Work Description supply installation , testing , commissioning Sitc Supply, Installation, Testing And Commissioning For Creation Of 63 Kva Sub Station Along With Ht Lt Network At Sarulla Upper Manjakote Under B2v3 On Turnkey Basis
Basic Detail
Tender No EDR/34 of 2022-23 Dated 21/06/2022
Bidding Type Tender
Location
City manjakote
State Jammu And Kashmir
Key Dates
Publish Date 21 Jun 2022
Submission Date 20 Jul 2022
Open Date 22 Jul 2022
Finance
Tender Value 5.34 Lakhs
Tender Fee 500
EMD 10680
Exemption Not Available
Document List
SBD.pdf
Tendernotice_1.pdf
7c3a0127-5c84-4100-9d85-1cbd3b318f87.html
BOQ_418653.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 21, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 20, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 22, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

SBD.pdf

pdf

Tendernotice_1.pdf

html

7c3a0127-5c84-4100-9d85-1cbd3b318f87.html

xls

BOQ_418653.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders