Military Engineer Services-MES has published Provision Of Automatic Meter Reading Billing And Installation Of Tamper Proof Meter At Hqtc Bangalore. Submission Date for this Tender is 01-08-2022. Meter Reading Work Tenders in bangalore Karnataka. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Jul-2022 | Date change | Date | 15-07-2022 |
2 | 07-Jul-2022 | Date change1 | Date | 20-07-2022 |
3 | 08-Jul-2022 | Date change2 | Date | 20-07-2022 |
4 | 12-Jul-2022 | Date change5 | Date | 25-07-2022 |
5 | 15-Jul-2022 | BOQ and Tender Corrigendum | BOQ | 25-07-2022 |
6 | 25-Jul-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 01-08-2022 |
Sl. No. | Item Description |
1 | Taking down energy meter fixed in panels of any capacity after carefully disconnecting electrical connections, complete all as specified and directed. Note:- Quoted rate shall deemed to be inclusive of following:- (a) Meter reading record shall be submitted before and after replacement duly signed by the contractor rep and MES rep. (b) Meter should be handed over to MES store. (c) Any rejoining of wires/cables shall be done using suitable PVC wire of existing size/ferule/ Cable connectors after removal of meter. (d) The cost of making good of disturbed surfaces & matching to the existing surface is deem to be included in the quoted rates. |
2 | Supply, install, testing & commissioning of Microprocessor based single phase tamper proof electronic static prepaid cum postpaid with AMR based facility engery meter rating 240 Volts, 50 HZ, of range 10-60 Amps, confirming to IS 13779with LED display and parameters like Voltage, Current, Frequency, Power, Power factor, KWh/KVA, default /in built dual source, inbuilt long range (LORAWAN) Communication suitable only for outdoor LoRa data accumulator and also compatible for EB & DG Measurement , prepaid and post paid online energy monitoring billing system, with 2 Years warranty ,disconnection /reconnection through existing remote software / data export to ERP, complete all as specified and directed Make :Elmeasure , Model :PE5121 or equivalent in L&T/ Secure/HPL |
3 | Supply and fix IP 51 rated Data Conentrator Unitc (DCU) complete for remote automatic meter reading (AMR) solution and cable of communicating with the static energy meter in the corresponding frequency band and with the data server through GPRS and shall have minimum data transfer rate of 9600bps, internal memory for storage data of 50 modules for six months period and shall be based on static energy meter mesh 865-867 MHz Mesh network within 50 mtrs range complete all as specified and as directed. Make L&T, Cyantech, Capital. |
4 | Supplying, Fixing, Commissioning and testing of configuration of server Hosted multi user web based software with following modules: (i) Meter Data Management Module: The meter data management module would be responsible for collecting the data from the data concentrator and make the data available to the billing system. The system would support offline meter data entry.The meter data management system would capture and provide the follwing data: (a) 30min instantaneous data from all the meters for seven parameters- Cumulative Energy,Power, Current, Voltage, Power factor and Frequency. (b) Monthly and quarterly billing survey data for cumulative energy and max demand (ii) Billing Module: The billing module would collect the data from the meter data management module, calculate billing determinant and make energy data/ billing data available to admin and end users. (iii) Occupation and vacation Module: The System would support occupation/ vacation based on the unit categories. The system would support automatic data capture on occupation and vacation events. (iv) Customer portal: The system would include a customer portal for the resident/ occupant to log in and view their own energy / billing data. (v) Energy Accounting Module: The system would include features of energy accounting. the system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. (vi) Communication module: The system should provide conmmunication of energy data and bills via print, email and sms methods (vii) Meter Master Data : The system would support meter data repository. The system should support meter replacment process. (viii) Excel Export : The system would support export of metering and billing data in excel format Make:Elmeasure , Model :Elnet or equivalent |
5 | Repairs/maintenance any type shall be supporting by the contractor without any extra cost to the department for four years after completion of year warranty period. Note : (i) MOU will be made between Contractor /Bidder and department copy of which to be made available for manufacturerwarranty period and thereafter four year AMC. (ii)Hosting, GPRS charges for 4 years (after 1 year Meters warranty period under phase II) Make :Airtel ,Jio ,Vodafone or any |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail