| 1 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, MAIN ITEM - DOUBLE MAIN BUS SCHEME - BUS BARS |
| 2 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, MAIN ITEM - DOUBLE MAIN BUS SCHEME - LINE GIS BAY |
| 3 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, DOUBLE MAIN BUS SCHEME - LINE GIS BAY (TYPE 2) |
| 4 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, DOUBLE MAIN BUS SCHEME - BUS COUPLER GIS BAY |
| 5 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, GIS DOUBLE MAIN BUS SCHEME - BUS SECTIONALISER BAY MODULE |
| 6 | SUPPLY- GIS : 220KV, 50KA FOR 3S, DOUBLE MAIN BUS SCHEME - BUS MEASUREMENT GIS BAY/ VOLTAGE TRANSFORMER BAY |
| 7 | SUPPLY- GIS : 220KV, 50KA FOR 3S,MAIN ITEM - DOUBLE MAIN BUS SCHEME - TRANSFORMER GIS BAY |
| 8 | SUPPLY- GIS : 220KV, 50KA FOR 3S, GIS DOUBLE MAIN BUS SCHEME - SPARE TRANSFORMER GIS BAY MODULE |
| 9 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, GIS DOUBLE MAIN BUS SCHEME - SF6 TO EHV CABLE GIS CONNECTION MODULE ( TYPE 2) |
| 10 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, MAIN ITEM-DOUBLE MAIN BUS SCHEME - GIS SURGE ARRESTER MODULE WITH SURGE COUNTER |
| 11 | SUPPLY- GIS : 220KV, LOCAL CONTROL CUBICLE |
| 12 | SUPPLY- GIS : 220KV, 50KA FOR 3S, 2000A, DOUBLE MAIN BUS SCHEME - SF6 GAS REQUIRED FOR PLACING GIS INTO SUCCESSFUL OPERATION |
| 13 | SUPPLY- GIS : STRUCTURE MATERIALS FOR SUPPORT OF GIS, BUS DUCTS, SF6 TO OIL BUSHING/ CONNECTION AND SF6 TO AIR BUSHING/ CONNECTION INCLUDING FOUNDATION BOLTS, EMBEDDED ITEMS, RAILS AND/ OR OTHER ITEMS STRUCTURAL ITEMS REQUIRED |
| 14 | SUPPLY- GIS : EARTHING MATERIALS INCLUDING HIGH FREQUENCY EARTHING, IF APPLICABLE |
| 15 | SUPPLY- GIS : 220KV, CONSUMABLES FOR GIS |
| 16 | SUPPLY- GIS : 220KV, MAIN ITEM - LINE PT MODULE |
| 17 | SUPPLY- GIS : CONTROLLED SWITCHING DEVICE (CSD) |
| 18 | SUPPLY- GIS MANDATORY MAINTENANCE EQUIPMENT - CONTINUOUS ONLINE PARTIAL DISCHARGE (PD) MONITORING SYSTEM |
| 19 | SUPPLY- GIS MANDATORY MAINTENANCE EQUIPMENT - ONLINE SF6 GAS FILLING / TOPPING-UP SYSTEM |
| 20 | SUPPLY- GIS MANDATORY MAINTENANCE EQUIPMENT - PORTABLE PD (PARTIAL DISCHARGE) ANALYZER/ MEASUREMENT KIT SUITABLE FOR GIS ALONG WITH REQUIRED ACCESSORIES |
| 21 | SUPPLY- GIS MANDATORY MAINTENANCE EQUIPMENT - SF6 GAS LEAKAGE DETECTOR |
| 22 | SUPPLY- GIS MANDATORY MAINTENANCE EQUIPMENT - SF6 GAS FILLING, EVACUATING, FILTERING, DRYING, PUMPING & STORAGE PLANT |
| 23 | SUPPLY- GIS MANDATORY MAINTENANCE EQUIPMENT - SF6 GAS ANALYZER |
| 24 | SUPPLY- GIS MANDATORY MAINTENANCE EQUIPMENT - SF6 Gas Handling Unit / Service Cart |
| 25 | SPARES- GIS : 220KV, MANDATORY SPARES AS PER TECHNICAL SPECIFICATION |
| 26 | SUPPLY- GIS : PORTABLE GAS FILLING EQUIPMENT / SF6 GAS CART |
| 27 | SERVICES- GIS : 220KV, SUPERVISION OF ERECTION OF GIS BAYS INCLUDING LCC |
| 28 | SERVICES- GIS : 220KV, TESTING & COMMISSIONING OF GIS |
| 29 | SERVICES- GIS : 220KV, FINAL SUCCESSFUL HV/ POWER FREQUENCY TESTING OF GIS INCLUDING ARRANGING OF HV TEST KIT ALONG WITH OPERATOR |
| 30 | SERVICES- GIS : INSULATION CO-ORDINATION & VFT STUDIES FOR GIS SYSTEM |
| 31 | SPARES- GIS : SINGLE PHASE BUS BAR WITHOUT ENCLOUSER |
| 32 | SPARES- GIS : GIS METALLIC ENCLOSURE |
| 33 | SPARES- GIS : EXPANSION BELLOWS/ JOINTS |
| 34 | SPARES- GIS : TEE BEND |
| 35 | SPARES- GIS : L-BEND |
| 36 | 220KV GIS- SINGLE PHASE AND SINGLE CORE OF CURRENT TRANSFORMER EXCLUDING ASSOCIATED ENCLOSURE AND PRIMARY CONDUCTOR |
| 37 | SPARES- GIS : TRIP COIL ASSEMBLY WITH RESISTOR FORGIS CIRCUIT BREAKER (AS APPLICABLE) |
| 38 | SPARES- GIS : CLOSING COIL ASSEMBLY WITH RESISTOR FORGIS CIRCUIT BREAKER (AS APPLICABLE) |
| 39 | SPARES- GIS : RELAYS, POWER CONTACTORS, PUSH BUTTONS, TIMERS & MCBS ETC. (AS APPLICABLE) OF EACH TYPE FOR GIS CIRCUIT BREAKER |
| 40 | SPARES- GIS :SINGLE PHASE DISCONNECTOR SWITCH INCLUDING MAINCIRCUIT, ENCLOSURE AND SUPPORT INSULATOR ETC., COMPLETE INALL RESPECT |
| 41 | SPARES- GIS :SINGLE PHASE MAINTENANCE EARTHING SWITCH INCLUDING MAINCIRCUIT, ENCLOSURE AND SUPPORT INSULATOR ETC.,COMPLETE IN ALL RESPECT |
| 42 | SPARES- GIS : SINGLE PHASE FAST EARTHING SWITCH INCLUDING MAIN CIRCUIT,ENCLOSURE AND SUPPORT INSULATOR ETC., COMPLETE INALL RESPECT |
| 43 | SPARES- GIS : DRIVE MECHANISM BOX FOR GIS CIRCUIT BREAKER |
| 44 | SPARES- GIS : DRIVE MECHANISM BOX FOR GIS DISCONNECTOR SWITCH |
| 45 | SPARES- GIS : DRIVE MECHANISM BOX FOR GIS MAINTENANCE EARTH SWITCH |
| 46 | SPARES- GIS : DRIVE MECHANISM BOX FOR GIS FAST EARTHING SWITCH |
| 47 | SPARES- GIS : GIS-SF6 GAS |
| 48 | SPARES- GIS : 220KV, 50KA FOR 3S, 2000A, MAIN ITEM-DOUBLE MAIN BUS SCHEME - SF6 TO EHV CABLE GIS CONNECTION MODULE |
| 49 | SERVICES- GIS : REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - SERVICES FOR SUPERVISION OF ERECTION OF GIS |
| 50 | SERVICES- GIS : REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - SERVICES FOR TESTING & COMMISSIONING OF GIS |
| 51 | SERVICES- GIS : REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - HIRING CHARGES OF HV TEST KIT WITH OPERATOR |
| 52 | SERVICES- GIS : TRAINING FOR GIS AT SITE |
| 53 | SERVICES- GIS : TRAINING FOR GIS AT MANUFACTURER WORKS |