}

Annual Rate Contract For Repair / Maintenance Of Horizontal Centrifugal Pumps, Submersible Pumps And Induction / Submersible Motors Of Different Capacities With Allied Works Installed At Various Pumping Stations Under Jal Shakti Phe Mechanical Division R, rajouri-Jammu And Kashmir

Public Health Engineering Department-PHED has published Annual Rate Contract For Repair / Maintenance Of Horizontal Centrifugal Pumps, Submersible Pumps And Induction / Submersible Motors Of Different Capacities With Allied Works Installed At Various Pumping Stations Under Jal Shakti Phe Mechanical Division R. Submission Date for this Tender is 07-07-2022. Lathe Machine Tenders in rajouri Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

32724546
Corrigendum : Annual Rate Contract For Repair / Maintenance Of Horizontal Centrifugal Pumps, Submersible Pumps And Induction / Submersible Motors Of Different Capacities With Allied Works Installed At Various Pumping Stations Under Jal Shakti Phe Mechanical Division R
Open Tender
Indian
Jammu And Kashmir
rajouri
07-07-2022

Tender Details

Annual Rate Contract For Repair / Maintenance Of Horizontal Centrifugal Pumps, Submersible Pumps And Induction / Submersible Motors Of Different Capacities With Allied Works Installed At Various Pumping Stations Under Jal Shakti Phe Mechanical Division Rajouri.- 1 Horizontal Centrifugal PumpRKB Make 2 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 3 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 4 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 5 Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) 6 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) 7 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) 8 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) 9 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) 10 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) 11 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) 12 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump) 13 Providing and fitting of Brass Impeller as per sample 14 Providing and fitting of C.I Impeller as per sample 15 Repairing of brass Impeller 16 Repairing of C.I Impeller 17 Fabrication & fitting of neck ring. 18 Fabrication & fitting of diffuser bush 19 Fabrication of Stainless steel gland bush 20 Fabrication of chuck nut 21 Providing & Fitting of pump bowl 22 Repair to bearing housing by sleeve fitting & boring for bearing size 23 Providing of bearing housing along with side cover plate 24 Providing and fitting of Delivery Body 25 Providing and fitting of Suction Body 26 Replacement of ball thrust bearing-7307 27 Replacement of ball thrust bearing-7308 28 Replacement of ball thrust bearing-7309 29 Providing and fitting of diffuser 30 Replacement of Rollerbearing-N-307 31 Replacement of Rollerbearing-N-308 32 Replacement of Rollerbearing-N-309 33 Providing & Fitting of Oil seal 34 Providing & Fitting Coupling bolts nuts & rubber bushes. 35 Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. 36 Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. 37 Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. 38 Horizontal Centrifugal PumpMather & PlattMake 39 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 40 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 41 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 42 Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) 43 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) 44 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) 45 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) 46 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) 47 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) 48 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) 49 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump) 50 Providing and fitting of Brass Impellers as per sample 51 Providing and fitting of C.I Impellers as per sample 52 Repairing of brass Impellers 53 Repairing of C.I Impellers 54 Fabrication & fitting of neck ring. 55 Fabrication & fitting of spacer bushes. 56 Fabrication of Stainless steel gland bushes 57 Providing & Fitting of pump bowl 58 Repair to bearing housing by sleeve fitting & boring for bearing size 59 Providing/Fitting of bearing housing along with side cover plates 60 Providing and fitting of Delivery Body 61 Providing and fitting of Suction Body 62 Replacement of ball thrust bearing-6306 63 Replacement of Rollerbearing-NU-306 64 Providing & Fitting of Oil seal 65 Fabrication & fitting of balancing plate 66 Providing & Fitting Coupling bolts nuts & rubber bushes. 67 Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. 68 Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. 69 Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. 70 Horizontal Centrifugal PumpKSB Make 71 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 72 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 73 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 74 Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) 75 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) 76 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) 77 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) 78 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) 79 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) 80 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) 81 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump) 82 Providing and fitting of Brass Impellers as per sample 83 Providing and fitting of C.I Impellers as per sample 84 Repairing of brass Impellers 85 Repairing of C.I Impellers 86 Fabrication & fitting of neck ring. 87 Fabrication & fitting of body bushes. 88 Fabrication of Stainless steel gland bushes 89 Fabrication of chuck nut 90 Providing & Fitting of pump bowl 91 Repair to bearing housing by sleeve fitting & boring for bearing size 92 Providing/Fittingof bearing housing along with side cover plates 93 Providing and fitting of Delivery Body 94 Providing and fitting of Suction Body 95 Replacement of ball thrust bearing-7309 96 Replacement of ball thrust bearing-7308 97 Providing & Fitting of Oil seal 98 Providing & Fitting Coupling bolts nuts & rubber bushes. 99 Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. 100 Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. 101 Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. 102 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (100 mm dia) 103 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (125 mm dia) 104 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (150 mm dia) 105 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (175 mm dia) 106 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (200 mm dia) 107 Horizontal Centrifugal PumpFNC Make 108 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 109 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 110 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 111 Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) 112 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) 113 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) 114 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) 115 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) 116 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) 117 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) 118 Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (14 Stage Pump) 119 Providing and fitting of Brass Impellers as per sample 120 Providing and fitting of C.I Impellers as per sample 121 Repairing of brass Impellers 122 Repairing of C.I Impellers 123 Fabrication & fitting of neck ring. 124 Fabrication & fitting of body bushes. 125 Fabrication of Stainless steel gland bushes 126 Fabrication of chuck nut 127 Providing & Fitting of pump bowl 128 Repair to bearing housing by sleeve fitting & boring for bearing size 129 Providing of bearing housing along with side cover plates 130 Providing and fitting of Delivery Body 131 Providing and fitting of Suction Body 132 Replacement of Rollerbearing-N-204 133 Replacement of Rollerbearing-N-205 134 Providing & Fitting of Oil seal 135 Fabrication & fitting of balancing plate 136 Providing & Fitting Coupling bolts nuts & rubber bushes. 137 Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. 138 Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. 139 Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. 140 Submersible Pump {V-8} 141 Repairing of pump shaft by welding, turning, polishing & making of key ways 142 Fabrication / providing of pump shaft as per exact size & specification 143 Fabrication / providing of Impeller 144 Repairs to Impeller 145 Fabrication / providing of Neck Ring 146 Fabrication / providing of Body Bush 147 Fabrication / providing of Guide Bush 148 Fabrication / providing of Spacer Bush 149 Fabrication / providing of Cotter 150 Fabrication / providing of Coupling pulley with cotter for V-8 submersible pump 151 Fabrication / providing of Pump Body along with studs 152 Fabrication / providing of intermediate bowl body 153 Fabrication / providing of Suction Body 154 Fabrication / providing of NRV with adaptor for V8 pump 155 Fabrication / providing of flanged adaptor with threading at other end for V8 pump 156 Dismantling and fitting charges of V-8 submersible pump at work Shop 157 Submersible Pump {V-6} 158 Rep+B169:B191airing of pump shaft by welding, turning, polishing & making of key ways 159 Fabrication / providing of pump shaft as per exact size & specification (up to 5 stage) 160 Fabrication / providing of S.S. pump shaft as per exact size & specification (6 stage to 10 stage) 161 Fabrication / providing of pump shaft as per exact size & specification (11 stage to 15 stage) 162 Fabrication / providing of S.S. pump shaft as per exact size & specification (Beyond 20 stage) 163 Fabrication / providing of impeller 164 Providing/Fitting of V-6 plastic impeller 165 Repairs to Impeller 166 Fabrication / providing of Neck Ring 167 Fabrication / providing of Body Bush 168 Fabrication / providing of Guide Bush 169 Fabrication / providing of Spacer Bush 170 Fabrication / providing of Cotter 171 Fabrication / providing of Pump Body 172 Fabrication / providing of Suction Body 173 Fabrication / providing of Coupling pulley with cotter for V-6 Submersible motor 174 Fabrication / providing of intermediate bowl body 175 Dismantling and fitting charges of pump (up to 5 stage) 176 Dismantling and fitting charges of pump (6 stage to 10 stage) at work Shop 177 Dismantling and fitting charges of pump (11 stage to 15 stage) at work Shop 178 Dismantling and fitting charges of pump (Beyond 15 stage) at work Shop 179 Submersible Pump {V-4} 180 Repairing of pump shaft by welding, turning, polishing & making of key ways 181 Fabrication / providing of pump shaft as per exact size & specification 182 Fabrication / providing of impeller 183 Providing/Fitting of V-4 plastic impeller 184 Repairs to Impeller 185 Fabrication / providing of Neck Ring 186 Fabrication / providing of Body Bush 187 Fabrication / providing of Guide Bush 188 Fabrication / providing of Spacer Bush 189 Fabrication / providing of Cotter 190 Fabrication / providing of Coupling pulley with cotter 191 Fabrication / providing of Pump Body 192 Fabrication / providing of Suction Body 193 Dismantling and fitting charges of V-4 submersible pump at work Shop. 194 Miscelleanous 195 Fabrication & providing of 80 mm dia. flanged adaptor with threading at other side 196 Fabrication & providinf of 65 mm dia. flanged adaptor with threading at other side 197 Fabrication & providing of 100 mm dia. flanged adaptor with threading at other side 198 Fabrication & providing of 50 mm dia. flanged adaptor with threading at other side 199 Fabrication & providing of MS Clamp 2½ 200 Fabrication & providing of MS Clamp 3 201 Fabrication & providing of MS Clamp 4 202 Fabrication & providing of MS Clamp 6 203 Fabrication of Shling for holding of 05 Ton capacity Chain block for same load 204 Providing and Fabrication of GI column pipes of 100 mm dia. 10 feet in lengthsuitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. 205 Providing and Fabrication of GI column pipes of 80 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. 206 Providing and Fabrication of GI column pipes of 65 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. 207 Providing and Fabrication of Top column pipe of 100 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. 208 Providing and Fabrication of Top column pipe of 80 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. 209 Fabrication of Top column pipe of 65 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. 210 Fabrication of Foundation Bolts 21 No.welded with extended Steel and Chuck Nut 211 Fabrication of Foundation Bolts 24 No.welded with extended Steel and Chuck Nut 212 Fabrication of Foundation Bolts 27 No.welded with extended Steel and Chuck Nut 213 Fabrication of Foundation Bolts 32No.welded with extended Steel and Chuck Nut 214 Replacement by providing & fitting of bearing-7307 (SKF/NBC/FAG/Reputed make) 215 Replacement by providing & fitting of bearing-7308 (SKF/NBC/FAG/Reputed make) 216 Replacement by providing & fitting of bearing-7309 (SKF/NBC/FAG/Reputed make) 217 Replacement by providing & fitting of bearing-6209 (SKF/NBC/FAG/Reputed make) 218 Replacement by providing & fitting of bearing-6212 (SKF/NBC/FAG/Reputed make) 219 Replacement by providing & fitting of bearing-6213 (SKF/NBC/FAG/Reputed make) 220 Replacement by providing & fitting of bearing NU-204 (SKF/NBC/FAG/Reputed make) 221 Replacement by providing & fitting of bearing NU-205 (SKF/NBC/FAG/Reputed make) 222 Replacement by providing & fitting of bearing NU-206 (SKF/NBC/FAG/Reputed make) 223 Replacement by providing & fitting of bearing NU-208 (SKF/NBC/FAG/Reputed make) 224 Replacement by providing & fitting of bearing NU-308 (SKF/NBC/FAG/Reputed make) 225 Replacement by providing & fitting of bearing NU-309 (SKF/NBC/FAG/Reputed make) 226 Replacement by providing & fitting of bearing N- 6305 (SKF/NBC/FAG/Reputed make) 227 Replacement by providing & fitting of bearing 6306-ZZ (SKF/NBC/FAG/Reputed make) 228 Replacement by providing & fitting of bearing 6307-ZZ (SKF/NBC/FAG/Reputed make) 229 Replacement by providing & fitting of bearing 6308-ZZ (SKF/NBC/FAG/Reputed make) 230 Replacement by providing & fitting of bearing 6309-ZZ (SKF/NBC/FAG/Reputed make) 231 Replacement by providing & fitting of bearing 6310-ZZ (SKF/NBC/FAG/Reputed make) 232 Replacement by providing & fitting of bearing 6311-ZZ (SKF/NBC/FAG/Reputed make) 233 Replacement by providing & fitting of bearing 6312-ZZ (SKF/NBC/FAG/Reputed make) 234 Replacement by providing & fitting of bearing 6313-ZZ (SKF/NBC/FAG/Reputed make) 235 Replacement by providing & fitting of bearing - 6314 (SKF/NBC/FAG/Reputed make) 236 Replacement by providing & fitting of bearing - 6315 (SKF/NBC/FAG/Reputed make) 237 Replacement by providing & fitting of bearing - 6316 (SKF/NBC/FAG/Reputed make) 238 Providing//Fitting Star Coupling Complete L-150 (Reputed Make) 239 Providing//Fitting Star Coupling Complete L-190 (Reputed Make) 240 Providing//Fitting Star Coupling Complete L-225 (Reputed Make) 241 Providing//Fitting Star Coupling Complete L-226 (Reputed Make) 242 Providing & fitting of 50 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 243 Providing & fitting of 65 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 244 Providing & fitting of 80 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 245 Providing & fitting of 100 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 246 Providing & fitting of 150 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 247 Providing & fitting of 50 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 248 Providing & fitting of 65 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 249 Providing & fitting of 80 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 250 Providing & fitting of 100 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 251 Providing & fitting of 150 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 252 Providing of Gland Packing of assorted size 8mm, 10mm, 12mm (Champion/Reputed Make) 253 Providing of Rubber insertionSheet (Reputed Make ) 254 Providing of Nut Bolts of assorted size & length (19 no.,21 no.,24 no. 27 no. etc.) 255 Providing of Puncher Roll (Reputed Make) 256 Providing of Insulation Tape (Reputed Make) 257 Repairs to V-4 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 258 Repairs to V-6 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 259 Repairs to V-8 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set.Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 260 Repairs to V-4 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 261 Repairs to V-6 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 262 Repairs to V-8 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set.P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 263 Repair to submersible Motor (V-6)by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing. 264 Repair to submersible Motor (V-8)by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing. 265 Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. 266 Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. 267 Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. 268 Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. 269 Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. 270 Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. 271 Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. 272 Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. 273 Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. 274 Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. 275 Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. 276 Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. 277 Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. 278 Repair to 70 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. 279 Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. 280 Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. 281 Repair to 20 HP to 50HP motor by way of replecement of bearing at DE end and assembling of motor. 282 Repair to 51 HP to 100HP motor by way of replecement of bearing at DE end and assembling of motor. 283 Repair to 20 HP to 50HP motor by way of replecement of bearing at NDE end and assembling of motor. 284 Repair to 51 HP to 100HP motor by way of replecement of bearing at NDE end and assembling of motor. 285 Repair to 20 HP to 50HP motor by way of replecement of bearing at DE and NDE end and assembling of motor. 286 Repair to 51 HP to 100HP motor by way of replecement of bearing at DE and NDE end and assembling of motor. 287 Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriageupto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle and carriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (Up to 7 stages) (Carriage on HL up to a lead of 0-500 mtr.) 288 Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriageupto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle andcarriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (Up to 7 stages) (Carriage on HL up to a lead of 0-1000 mtr.) 289 Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriageupto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle and carriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (7 stage to 14 stage) (Carriage on HL up to a lead of 0-500 mtr.) 290 Dismantling of damaged HC pump from the base frame by unscrewing nut /bolts, shifting the same out of the pump room with the help of manual labour, Head load carriageupto loading site, loading in the vehicle. Unloading the repaired pump from the vehicle andcarriage back to the pumping station, shifting into the pump room, Fitting on the base frame. Coupling with motor, connecting with suction and delivery line. Testing the machinery on full load. (7 stage to 14 stage) (Carriage on HL up to a lead of 0-1000 mtr.) 291 Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-4) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour. 292 Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour. 293 Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour. 294 Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour. 295 Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of skilled/semi- skilled labour. 296 Loading of damaged Submersible Motor (V6) from site of work by way of head load carriage to Mechanical Transport and carriage back to site of work after repairing and unloading at site. 297 Loading of damaged Submersible Motor (V8) from site of work by way of head load carriage to Mechanical Transport and carriage back to site of work after repairing and unloading at site.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 29-Jun-2022 Terms and conditions Other 07-07-2022

Key Value

Document Fees
INR 1000 /-
EMD
INR 25000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail