Increase The Load In Deposit Scheme Under Electricity Distribution Division Chandausi- 1 Safe Carriage Of The Following Material From Store Centre JeS Store To Work Site Including Loading And Unloading At Both Ends. 2 Safe Carriage Ofsp-55 11 Mtr. S.T
Tender Overview
Project Description
Increase The Load In Deposit Scheme Under Electricity Distribution Division Chandausi- 1 Safe Carriage Of The Following Material From Store Centre JeS Store To Work Site Including Loading And Unloading At Both Ends. 2 Safe Carriage Ofsp-55 11 Mtr. S.T Pole And Pcc Pole, From Store To Site With Loading & Unloading At Both Ends Respectively As Per Uppcl Contruction Manual Norms And As Per Site Condition 3 Loading, Safe Carriage & Unloading Of Heavy Stock Material ( Other Than Pole ) Tf, & Other Acessories From Moradabad Store To Site With Proper Stacking Of Material, Distancewithin-110Kms. As Per Uppcl Contruction Manual Norms And As Per Site Condition 4 Safe Carriage & Unloading Of Ct / Pt Pole Mounted And Plifer Meter From Store To Siteas Per Uppcl Contruction Manual Norms And As Per Site Condition 5 The Excavation Of Foundation Pit In Mix Soil / Normal Soil / Soft & Hard Rock And Its Back Filling And Leveling Etc. The Size Of The Pit Will Be ( 750X450 ) Mm And Having Depth Of 1 / 6Th Of The Full Length Of The Support. Erection Of Support, Complete With Providing & Fixing Of All Clamps And Other Accessories As Per Drawing. The Work Includes Carriage And Handling Of Supports From Sectional Store To Pit Site As Well As An Fabrication Work If Required. 6 Single Pole 8.5 Mtr. P.C.C. Poles 7 Double Pole 8.5 Mtr. P.C.C. Poles 8 Grouting Of Supports In Cc 1:4:8 ( Cement, Sand & 40Mm Brick Ballast ) . Grouting Will Be Done In The Block Of Size ( 450X450 ) Mm X1 / 6Th Of Full Length Of The Support, L Upto Ground Level, 300Mm Plinth Above The Ground Level With C.C. 1:3:6 ( Cement, Course Sand And Stone Grit ) With Muffing As Per Drawing. Work Includes Back Filling And Proper Ramming. 9 Single Pole 8.5 Mtr. P.C.C. Poles 10 Double Pole 8.5 Mtr. P.C.C. Poles 11 Grouting Of Stay Rods ( 16X1800 ) Mm Including All Work Of Excavation, Cement Concrete In Size ( 0.60X0.60X0.30 ) M In Ratio 1:4:8 Cement, Sand, 40Mm Brick Ballast ) As Per Drg. Including Back Filling Of Soil And Proper Ramming Etc. 12 Fixing, Tightening & Nozzling Of Stay Wire With Stay Rod With The Poles Of Required Tension As Per Drawing, Including Providing & Fixing Of Stay Insulators Of 11Kv And Stay Clamps. 13 Earthing Of Supports With M.S. Earth Rod Of ( 20X2500 ) Mm Long Including Excavation Of Pit And Driving M.S.Rod 3.0M Apart From Support And 0.5M Below The Ground Level And Connecting Below The Earth Electrodes With The Help Of G.I.Wire No.8Swg And Earthing Lugs. 14 Laying Of Weseal Conductor 15 11 Kv Xlpe Cable 3.5X150 Squre Mm 16 Filling Id&Od Jointing Kit 3X70 Xlpe Cable 17 G.I. Pipe Earthing With Ms Strip Upto Water Lavel As Per Uppcl Norms And Site Condition 18 Abc 3X95 Sq. Mm 19 Making Jumpers On Section Points, Byfixing Of P.G.Clamps Of Proper Sizes, Suitable For Weasel / Rabbit Conductor And T / F Instalation 20 Sectional T-Off 21 Section Double Pole 22 100 Kva T / F 23 Supply Of The Following Materials Provided By The Contractor As Per Respo Drawing- Danger Board 24 Making Of Plifer Room Using Brick And Sent, Cement With Rcc Roof And Iron Gate As Per Uppcl Contruction Manual Norms And Site Condition ( 10X10x8 Feet As Per Site Condition ) 25 I- Bolt Holding Clamp 26 Making Of Plinth Of 100 Kva T / F As Per Uppcl Norms And Site Condition 27 Nut And Bolt 28 Installation Of Ct / Pt Unit And Meter For Metering 29 Installation Of Metering Cubical And Providing Earthing Of Cubical In Metering Room
BOQ
| Sl. No. | Item Description |
| 1 | Safe carriage of the following material from Store Centre JE\"s store to work site including loading and unloading at both ends. |
| 2 | Safe carriage ofSP-55 11 mtr. S.T Pole and PCC Pole, from store to Site with loading & unloading at both ends respectively as per uppcl contruction manual norms and as per site condition |
| 3 | Loading, Safe carriage & unloading of heavy stock material (other than pole )TF, & Other Acessories from moradabad store to site with proper stacking of material, distancewithin-110Kms. as per uppcl contruction manual norms and as per site condition |
| 4 | Safe carriage & unloading of CT/PT pole mounted and plifer meter from store to siteas per uppcl contruction manual norms and as per site condition |
| 5 | The excavation of foundation pit in mix soil/normal soil/soft & hard rock and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all clamps and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as an fabrication work if required. |
| 6 | Single pole 8.5 Mtr. P.C.C. Poles |
| 7 | Double Pole 8.5 Mtr. P.C.C. Poles |
| 8 | Grouting of supports in CC 1:4:8 (Cement, sand & 40mm brick ballast). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support,l upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grit) with muffing as per drawing. Work includes back filling and proper ramming. |
| 9 | Single pole 8.5 Mtr. P.C.C. Poles |
| 10 | Double Pole 8.5 Mtr. P.C.C. Poles |
| 11 | Grouting of stay rods (16x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg. Including back filling of soil and proper ramming etc. |
| 12 | Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators of 11KV and Stay Clamps. |
| 13 | Earthing of supports with M.S. earth Rod of (20x2500)mm long including excavation of pit and driving M.S.Rod 3.0M apart from support and 0.5M below the ground level and connecting below the earth electrodes with the help of G.I.wire No.8SWG and earthing lugs. |
| 14 | Laying of Weseal Conductor |
| 15 | 11 KV XLPE cable 3.5X150 squre mm |
| 16 | filling ID&OD jointing kit 3X70 XLPE cable |
| 17 | G.I. Pipe Earthing with MS Strip upto Water lavel as per uppcl norms and site condition |
| 18 | ABC 3X95 sq. mm |
| 19 | Making Jumpers on Section Points, byfixing of P.G.Clamps of proper sizes, suitable for Weasel/Rabbit Conductor and T/F Instalation |
| 20 | Sectional T-Off |
| 21 | section double pole |
| 22 | 100 KVA T/F |
| 23 | Supply of the following materials provided by the Contractor as per RESPO Drawing- Danger Board |
| 24 | Making of plifer room using brick and sent, cement with RCC roof and iron gate as per uppcl contruction manual norms and site condition (10X10X8 feet as per site condition) |
| 25 | I- Bolt Holding Clamp |
| 26 | Making of plinth of 100 KVA T/F as per uppcl norms and site condition |
| 27 | nut and bolt |
| 28 | Installation of CT/PT Unit and meter for metering |
| 29 | Installation of metering cubical and providing earthing of cubical in metering room |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed