}

Consultancy Services For Acting As Independent Engineer For Development Of Ganga Expressway Project ( Group-I ) On Dbfot ( Toll ) - 1 I. Remuneration For Professional Staff - Key Professional Staff ( Man-Month As Per Details At Appendix-C-3 ), lucknow-Uttar Pradesh

Uttar Pradesh Expressways Industrial Development Authority has published Consultancy Services For Acting As Independent Engineer For Development Of Ganga Expressway Project ( Group-I ) On Dbfot ( Toll ) - 1 I. Remuneration For Professional Staff - Key Professional Staff ( Man-Month As Per Details At Appendix-C-3 ). Submission Date for this Tender is 07-07-2022. Survey Equipment Tenders in lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32716762
Corrigendum : Consultancy Services For Acting As Independent Engineer For Development Of Ganga Expressway Project ( Group-I ) On Dbfot ( Toll ) - 1 I. Remuneration For Professional Staff - Key Professional Staff ( Man-Month As Per Details At Appendix-C-3 )
Open Tender
Indian
Uttar Pradesh
lucknow
07-07-2022

Tender Details

Consultancy Services For Acting As Independent Engineer For Development Of Ganga Expressway Project ( Group-I ) On Dbfot ( Toll ) - 1 I. Remuneration For Professional Staff - Key Professional Staff ( Man-Month As Per Details At Appendix-C-3 ) 2 Team Leader Cum Senior Highway Engineer – 1 No. 3 Deputy Team Leader – 1 No. 4 Sr. Contract Specialist – 1 No. 5 Resident Engineer Cum Highway Engineer- 3 Nos. 6 Highway Design Specialist – 1 No. 7 Bridge Design Specialist – 1 No. 8 Sr. Bridge / Structural Engineer – 1 No. 9 Sr. Quantity Surveyor - 1 No. 10 Sr. Pavement Specilaist–1 No. 11 Highway Engineer– 3 Nos. 12 Bridges / Structural Engineer – 3 Nos. 13 Sr. Qualitty / Material Expert – 3 Nos. 14 Road Safety Expert – 1 No. 15 Environment Expert – 1 No. 16 Electrical Engineer – 1 No. 17 Geotechnical Expert – 1 No. 18 Tms And Atms Expert – 1 No. 19 Building Design & Construction Expert – 1 No. 20 Remuneration For Professional Staff - Sub Professional 21 Survey Engineer – 3 Nos. 22 Assistant Highway Engineer – 3 Nos. 23 Assistant Bridge Engineer – 3 Nos. 24 Quantity Surveyor - 1 No. 25 Lab Technician - 3 Nos. 26 Horticulture Cum Landscaping - 1 No. 27 Ii. Support Staff 28 Office Manager - 4 Nos. 29 Accountant Cum Cashier - 1 No. 30 Steno Cum Computer Operator – 4 Nos. 31 Office Boy - 8 Nos. 32 Iii. Transportation ( Fixed Rate On Monthly Rental Basis ) 33 Innova ( Ac ) Or Equivalent ( Not More Than 3 Years Old ) 34 Bolero ( Ac ) Or Equivalent ( Not More Than 3 Years Old ) 35 Bolero For Sub Professional Staff ( Not More Than 3 Years Old ) 36 Iv. Duty Travel To Site ( Fixed Costs ) ( For All Lengths Of Projects ) : Professional & Sub-Professional Staff 37 Site To Authority Hq For Key Professionals ( 36 + 12 ) = 48 Round Trips ( Including Hotel Charges, Travel Costs Etc. Complete ) 38 Site To Regional Office For Key Professionals ( 36 + 24 ) = 60 Round Trips ( Including Hotel Charges, Travel Costs Etc. Complete ) 39 V. Office Rent ( Fixed Costs ) Minimum 400 Sqm Area Of Office Shall Be Rented As Hoduring Construction Period. During Maintenance Period, The Space May Be Reduced To 200 Sqm. In Addition To The Above, The Consultant Shall Maintain Three Field Offices Of Minimum Area Of 200 Sqm Each During The Construction Period. The Location Of The Field Offices Shall Be Finalized In Consultation With Authority. The Rent Cost Includes Electricity And Water Charges, Maintenance Charges, Cleaning, Repairs Etc. Complete. 40 Head Office ( 36 Months For Construction Period ) 41 Head Office ( 24 Months For Maintenance Period ) 42 Field Office ( 3 X 36 Months For Construction Period ) 43 Vi. Office Supplies, Utilities And Communication ( Fixed Costs ) 44 Office Supplies 45 Drafting Supplies 46 Computer Running Costs 47 Domestic And International Communication 48 Vii. Office Furniture And Equipment ( Rental ) The Cost Shall Include Rental Charges Towards All Such Furniture And Equipment As Required For Proper Functioning Of Office. Office Furniture Shall Include Executive Tables, Chairs, Visitor Chairs, Steel Almirahs, Computer Furniture, Conference Table Etc. Office Equipment Shall Include As A Minimum Of Telephone ( 2 External & 10 Internal Lines ) , Photocopier ( 15Ppm, 12000 Copies Per Month With A3 & A4 Input ) , Pcs With Latest Configuration With Licensed Softwares ( 5 Nos ) , Laser Printers ( 2 No., 30 Ppm, A3 Size ) Etc., Binding Machine ( 1 No. ) , Plotter A0 Size, Smart Screen, Ac ( 4 No., 1.5 Ton ) , Water Coolers ( As Required ) Etc. 49 Construction Period 50 Maintenance Period 51 Viii. Reports And Document Printing 52 Monthly Reports ( Design And Construction ) - 60 X 3 Copies 53 Half Yearly Reports - 10 X 3 Copies 54 Various Others Reports As Provided In The Concession Agreement Such As Completion Report - 5 X 3 Copies 55 Ix. Road Survey Equipment 56 Surface Defects Detection And Roughness Measurement Using Network Survey Vehicle 57 Pavement Strength Measurement Using Fwd ( During O&M ) 58 Bridge Inspection Using Mobile Bridge Inspection Unit 59 Road Signs Inspection Using Retro Reflectometer 60 X. Contingencies 61 A Fixed Amount Of Indian Rupees One Million Shall Be Included In The Financial Proposal. The Provisions Of Contingency Shall Be Operated With The Specific Approval From The Competent Authority In Uttar Pradesh Expressways Industrial Development Authority, Uttar Pradesh.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-Jun-2022 Clarification to Pre Bid Queries and Corrigendum Technical Bid 07-07-2022
2 04-Jul-2022 Technical Corrigendum Technical Bid 07-07-2022
3 04-Jul-2022 Revised Bid Schedule Date 14-07-2022

Key Value

Document Fees
INR 59000 /-
EMD
INR 250000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Consultancy Services for acting as Independent Engineer for Development of Ganga Expressway Project (Group-I) on DBFOT (Toll)
Sl. No. Item Description
1I. Remuneration for Professional Staff - Key Professional Staff (Man-month as per details at Appendix-C-3)
2Team Leader Cum Senior Highway Engineer – 1 no.
3Deputy Team Leader – 1 no.
4Sr. Contract Specialist – 1 no.
5Resident Engineer cum Highway Engineer- 3 nos.
6Highway Design Specialist – 1 no.
7Bridge Design Specialist – 1 no.
8Sr. Bridge/Structural Engineer – 1 no.
9Sr. Quantity Surveyor - 1 no.
10Sr. Pavement Specilaist–1 no.
11Highway Engineer– 3 nos.
12Bridges/Structural Engineer – 3 nos.
13Sr. Qualitty/ Material Expert – 3 nos.
14Road Safety Expert – 1 no.
15Environment Expert – 1 no.
16Electrical Engineer – 1 no.
17Geotechnical Expert – 1 no.
18TMS and ATMS Expert – 1 no.
19Building Design & Construction Expert – 1 no.
20Remuneration for Professional Staff - Sub Professional
21Survey Engineer – 3 nos.
22Assistant Highway Engineer – 3 nos.
23Assistant Bridge Engineer – 3 nos.
24Quantity Surveyor - 1 no.
25Lab Technician - 3 nos.
26Horticulture cum Landscaping - 1 no.
27II. Support Staff
28Office Manager - 4 nos.
29Accountant cum cashier - 1 no.
30Steno cum Computer Operator – 4 nos.
31Office Boy - 8 nos.
32III. Transportation (Fixed rate on monthly rental basis)
33Innova (AC) or equivalent (not more than 3 years old)
34Bolero (AC) or equivalent (not more than 3 years old)
35Bolero for sub professional staff (not more than 3 years old)
36IV. Duty Travel to Site (Fixed Costs) (For all Lengths of Projects): Professional & Sub-Professional Staff
37Site to Authority HQ for Key Professionals (36 + 12) = 48 Round trips (including Hotel charges, travel costs etc. Complete)
38Site to Regional Office for Key Professionals (36 + 24) = 60 Round trips (including Hotel charges, travel costs etc. Complete)
39V. Office Rent (Fixed Costs) Minimum 400 sqm area of Office shall be rented as HOduring Construction period. During Maintenance Period, the space may be reduced to 200 sqm. In addition to the above, the consultant shall maintain three field offices of minimum area of 200 sqm each during the construction period. The location of the Field offices shall be finalized in consultation with Authority. The Rent cost includes electricity and water charges, maintenance charges, cleaning, repairs etc. complete.
40Head Office (36 months for Construction period)
41Head Office (24 months for Maintenance period)
42Field Office (3 X 36 months for Construction period)
43VI. Office Supplies, Utilities and Communication (Fixed Costs)
44Office Supplies
45Drafting Supplies
46Computer Running Costs
47Domestic and International Communication
48VII. Office Furniture and Equipment (Rental) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) , PCs with latest configuration with licensed softwares (5 Nos), laser Printers (2 no., 30 ppm, A3 size) etc., binding machine (1 no.), plotter A0 size, Smart screen, AC (4 no., 1.5 Ton), Water Coolers (as required) etc.
49Construction Period
50Maintenance Period
51VIII. Reports and Document Printing
52Monthly reports (Design and Construction) - 60 X 3 copies
53Half yearly Reports - 10 X 3 copies
54Various others reports as provided in the Concession Agreement such as Completion Report - 5 X 3 copies
55IX. Road Survey Equipment
56Surface defects detection and roughness measurement using Network Survey Vehicle
57Pavement Strength measurement using FWD ( During O&M)
58Bridge inspection using Mobile Bridge Inspection Unit
59Road signs inspection using Retro reflectometer
60X. Contingencies
61A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority in Uttar Pradesh Expressways Industrial Development Authority, Uttar Pradesh.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail