Supply, Installation And Maintenance Of Online Continuous Effluent Monitoring System ( Ocems ) I.E. Ph, Bod, Cod, Tss And Flow Along With Data Transfer To Cpcb And Rspcb Server For Running Stp For Outlet
Tender Overview
Project Description
Supply, Installation And Maintenance Of Online Continuous Effluent Monitoring System ( Ocems ) I.E. Ph, Bod, Cod, Tss And Flow Along With Data Transfer To Cpcb And Rspcb Server For Running Stp For Outlet
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Jun-2022 | Corrigendum | Technical Bid | 17-Jul-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply & Installation of On Line BOD/COD/TSS/PH in-situ based Analyzer with panel for S.T.P effluent Measurement items UV-VIS Spectrometry Double beam with entire spectrum scanning 200 – 720 nm / 190- 750nm wave lengths along with 256 unique pixel diode. •MOC of BOD/COD/TSS sensor -Titanium 3.7 / SS316L or better•Cleaning facility.-ultrasonic cleaning or Air pressure Cleaning •Accuracy of BOD/COD/TSS sensor- +/-3% of the measured value • Light Source: Xenon Flash Lamp Following measuring ranges are required :• COD: 0-700 mg/lBOD: 0-400 mg/lTSS: 0-600 mg/lPh range - 0 to 14•MOC of ph sensor-Stainless Steel 316 or better •Ph Accuracy +/-0.2% •protection type : IP 68 for both the Sensor and Cable (Cable lengthas per site requirement)•Controller/Display- Housing Material – Non corrosive e.g.Acrylonitrile-Styrene- Acryloester polymer or better •Protection Rating IP 67Controller/display cabin box should be IP66 Grade with lock & key SS304 Grade MOC |
| 2 | Data Logger (including Data transmission to CPCB and RSPCB), Internet for DATA transmission is in bidders scope. •The communication to the system should be two way. •The data should be received at a central location and should be displayed there in real-time in graphical and tabular format. • Operating Temperature 0 to 55 °C • Protection Surge protection on sensor inputs, over voltage and reverse polarity protection on Power Input • Storage 256MB (Industrial microSD) • Interface(s) 2 x EIA RS485, 1 x Rs232, 8 x 4-20mA (±1% FS) • USB Host 1 (USB 2.0) • Voltage 9-24 VDC ± 10% (Nominal 12VDC) Power 5W (peak) •Statistical data analysis (customizable) for average, min., max., diurnal variation. •Auto report and, auto mail generation etc. •Comparison of parameters of different locations in user selectable time formats i.e. in graphical and tabular formats compatible to MS Excel, MS Word, *.txt etc.Including Mandatory fee for DATA transmission to CPCB, RSPCB & MCB server (whenever payable). |
| 3 | Ultrasonic open channel flow meter with shall comprise of Flow sensor / transducer, flow transmitter, digital level indicator / remote indicator, control unit• Operating Temperature: 0 to 50°C. • Safety: Explosion Proof or Intrinsically Safe.• Measuring Principal: Ultrasonic. • Communication Protocol: Open Protocol like MODBUS, PROFIBUS, HART, etc. • Analog Output: Isolated 4-20mA. • Relay Contacts: Minimum of 3 SPDT contacts. • Accuracy: ± 0.25% of measured value or better. •Output-. 4 - 20 mA •Protection a.) Sensor: IP-68. b.) Transmitter / Controller: IP-66 (NEMA 4X). • Display: LCD with LED backlighting 130. |
| 4 | 1kva UPS• Capacity -1000VA/600W • Input Voltage Range- 140 V ~ 300 V AC Frequency - 50 Hz ± 10% • Operating Temperature- 0°C-40°C; • Charging Time -6~8 Hours recover to 90% capacity Battery Rating -SMF 12V /7AHx2 Batteries. • Output Voltage -230 V AC Nominal Transfer Time- Typical 4~8ms • Type- Sealed Maintenance Free |
| 5 | Comprehensive Operation & Maintenance Cost for whole system for 1st year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc. |
| 6 | Comprehensive Operation & Maintenance Cost for whole system for 2nd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc. |
| 7 | Comprehensive Operation & Maintenance Cost for whole system for 3rd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc. |
| 8 | Comprehensive Operation & Maintenance Cost for whole system for 4th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc. |
| 9 | Comprehensive Operation & Maintenance Cost for whole system for 5th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc. |
| 10 | Installation Charges |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender