Rectification & Oil Filtration Of Unit#8 Transformers ( Gt, Uat & St ) .- 1 315 Mva, 235 / 16.5Kv Bhel Make Gt#8, Line Current ( Hv ) : 774.81A, Line Current ( Lv ) : 11035.21A, Oil Qty ( Ltr ) : 63860, Connection Symbol: Ynd1, Serial No:60071, Paschim Bardhaman-West Bengal

Durgapur Projects Limited has published Rectification & Oil Filtration Of Unit#8 Transformers ( Gt, Uat & St ) .- 1 315 Mva, 235 / 16.5Kv Bhel Make Gt#8, Line Current ( Hv ) : 774.81A, Line Current ( Lv ) : 11035.21A, Oil Qty ( Ltr ) : 63860, Connection Symbol: Ynd1, Serial No:60071. Submission Date for this Tender is 04-07-2022. Cleaning and Disinfecting Solutions Tenders in Paschim Bardhaman West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

32709406
Rectification & Oil Filtration Of Unit#8 Transformers ( Gt, Uat & St ) .- 1 315 Mva, 235 / 16.5Kv Bhel Make Gt#8, Line Current ( Hv ) : 774.81A, Line Current ( Lv ) : 11035.21A, Oil Qty ( Ltr ) : 63860, Connection Symbol: Ynd1, Serial No:60071
Open Tender
Indian
West Bengal
Paschim Bardhaman
04-07-2022

Tender Details

Rectification & Oil Filtration Of Unit#8 Transformers ( Gt, Uat & St ) .- 1 315 Mva, 235 / 16.5Kv Bhel Make Gt#8, Line Current ( Hv ) : 774.81A, Line Current ( Lv ) : 11035.21A, Oil Qty ( Ltr ) : 63860, Connection Symbol: Ynd1, Serial No:6007105 2 Isolation Of Gt#8 From Both End Lv & Hv Terminal With Necessary Dismantling And Removing Of Dropper Moose Conductor & Flexible Connector As Required. 3 Necessary Jobs To Facilitate The Testing Work Of Transformer Alongwith Bushing Before O / H And After O / H By Testing Department. 4 Disconnection Of Oil Lines To Conservator Tank, Radiator Side Equilizer Line From Main Tank. Blanking Work Prior To Oil Draing At Reasonable Level. All Blanking Plates Should Be Arranged By The Party.Proper Storage Of The Drain Oil In Proper Storage Tank For Further Use. After Completion Of Job, Re-Assembling Is Also Included In The Scope. 5 Dismantling Of Existing Hv Bushing And Erection & Commissioning Of New Hv Bushing On Base Turretby Proper Procedure.This Job Also Include Requisite O-Ring & Gasket Replacement Of Bushing Housing As Well As Turret Flange.New Hv Bushing Testing Assistance To Be Provided Prior To Replacement Job. Arrangement Of Necessary Scaffolding Work & Oil Level Lowering At Requisite Level With Supply & Charging Of Dry Air / N2 Gas ( If Required ) Is Under The Scope Of The Party. 6 Supply And Change Ofo-Ring & Gaskets Of Lv Bushing Including Turret Flange. Brand & Material Of O-Ring & Gaskets Shall Be Approved By Eic 7 Supply And Change Of Other Gasket Such As Hv Neutral Bushing, Inspection Chamber Gaskets, Wti, Oti Gasket, Buchholz Relay & Osr Gasket, Prd Gaskets, Other Flange Gaskets.Checking Of Aircell, Level Gauge Glass & Mog. Arresting Of All Oil Leakage Points In Radiator & Conservator Section Including Replacement Of Gaskets, O-Rings, Reparing Of Butterfly Valves, Reparing Of Finges & Header Pipes Of Radiator Banks By Brazing, If Necessary. Brand & Material Of O-Ring & Gaskets Shall Be Approved By Eic 8 Oil Filtration After Successful Completion Of Jobs Still Achieving Desired Parameter Of Oil Due To Exposure To Air During Maintenance Works Afternecessary Oil Filling. Arrangement Of Oil Filter Machine Is In PartyS Scope. Transportation Of Oil Drums Is Also In PartyS Scope From Nearest Store. 9 Transformer Surface Cleaning By Suitable Cleaning Agent, Checking, Oil Settling, Venting Jobs After Completion Of Oil Filtration & Filling Work. 10 Connection Of Hv & Lv Terminal After Satisfactory Testing Of Transformer. 11 Unit Auxiliary Transformer, Uat# 8A & 8B, 20Mva, 16.5Kv / 6.9Kv, Current ( Hv ) :699.81Amp Current ( Lv ) :1673.479Amp, Connection: Dyn11, Cooling-Onaf / Onan, Oil Qty ( Ltr ) : 16900 12 Replacement Of Existing Aircell & Mog In Conservator Tank By New Ones Including Supply. 13 Change Of Gaskets / O-Rings Such As Inspection Chamber Gaskets, Wti, Oti Gasket, Buchholz Relay Gasket, Prd Gaskets, Other Flange Gaskets.Checking Of Aircell, Level Gauge Glass & Mog. Arresting Of All Oil Leakage Points In Radiator & Conservator Section Including Replacement Of Gaskets, O-Rings, Reparing Of Butterfly Valves, Reparing Of Finges & Header Pipes Of Radiator Banks By Brazing, If Necessary. 14 Oil Filtration After Successful Completion Of Jobs Still Achieving Desired Parameter Of Oil Due To Exposure To Air During Maintenance Works After Necessary Oil Filling. Arrangement Of Oil Filter Machine Is In PartyS Scope. Transportation Of Oil Drums Is Also In PartyS Scope From Nearest Store. 15 Transformer Surface Cleaning By Suitable Cleaning Agent, Checking, Oil Settling, Venting Jobs After Completion Of Oil Filtration & Filling Work. 16 Station Transformer #8, 55Mva, 220Kv / 6.9Kv, Current ( Hv ) :144.34Amp Current ( Lv ) :2301.03Amp, Connection: Ynynyn0, Cooling-Onaf / Onan, Oil Qty ( Ltr ) : 52440 17 Oil Filtration After Successful Completion Of Jobs Still Achieving Desired Parameter Of Oil Due To Exposure To Air During Maintenance Works After Necessary Oil Filling. Arrangement Of Oil Filter Machine Is In PartyS Scope.Transportation Of Oil Drums Is Also In PartyS Scope From Nearest Store. 18 Transformer Surface Cleaning By Suitable Cleaning Agent, Checking, Oil Settling, Venting Jobs After Completion Of Oil Filtration & Filling Work.

Key Value

Document Fees
Refer document
EMD
INR 48100.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Rectification & Oil filtration of Unit#8 transformers (GT, UAT & ST).
Sl. No. Item Description
1315 MVA,235/16.5KV BHEL make GT#8, Line Current(HV): 774.81A, Line Current(LV): 11035.21A, Oil Qty(Ltr): 63860, Connection Symbol: YNd1,Serial No:6007105
2Isolation of GT#8 from both end LV & HV terminal with necessary dismantling and removing of Dropper Moose Conductor & Flexible Connector as required.
3Necessary jobs to facilitate the testing work of Transformer alongwith bushing before O/H and after O/H by testing department.
4Disconnection of oil lines to conservator tank, radiator side equilizer line from main Tank. Blanking work prior to oil draing at reasonable level. All blanking plates should be arranged by the party.Proper storage of the drain oil in proper storage tank for further use. After completion of job, re-assembling is also included in the scope.
5Dismantling of existing HV Bushing and Erection & commissioning of new HV Bushing on base turretby proper procedure.This job also include requisite o-ring & gasket replacement of bushing housing as well as Turret Flange.New HV Bushing Testing assistance to be provided prior to replacement job. Arrangement of necessary scaffolding work & oil level lowering at requisite level with supply & charging of dry air/N2 gas (if required) is under the scope of the party.
6Supply and Change ofO-ring & Gaskets of LV Bushing including Turret Flange. Brand & material of O-ring & Gaskets shall be approved by EIC
7Supply and Change of other gasket such as HV Neutral bushing, Inspection Chamber gaskets,WTI,OTI Gasket, Buchholz Relay & OSR gasket, PRD Gaskets, other flange gaskets.Checking of aircell, level gauge glass & MOG. Arresting of all oil leakage points in radiator & conservator section including replacement of gaskets, o-rings, reparing of butterfly valves, reparing of finges & header pipes of radiator banks by brazing, if necessary. Brand & material of O-ring & Gaskets shall be approved by EIC
8Oil filtration after successful completion of jobs still achieving desired parameter of oil due to exposure to air during maintenance works afternecessary oil filling. Arrangement of Oil Filter machine is in party"s scope. Transportation of oil drums is also in party"s scope from nearest store.
9Transformer surface cleaning by suitable cleaning agent, checking, oil settling,venting jobs after completion of oil filtration & filling work.
10Connection of HV & LV Terminal after satisfactory testing of Transformer.
11Unit Auxiliary Transformer, UAT# 8A & 8B, 20MVA, 16.5KV/6.9KV, Current(HV):699.81Amp Current(LV):1673.479Amp, Connection: Dyn11, Cooling-ONAF/ONAN,Oil Qty(Ltr): 16900
12Replacement of existing aircell & MOG in conservator tank by new ones including supply.
13Change of gaskets/ O-rings such as Inspection Chamber gaskets,WTI,OTI Gasket, Buchholz Relay gasket, PRD Gaskets, other flange gaskets.Checking of aircell, level gauge glass & MOG. Arresting of all oil leakage points in radiator & conservator section including replacement of gaskets, o-rings, reparing of butterfly valves, reparing of finges & header pipes of radiator banks by brazing, if necessary.
14Oil filtration after successful completion of jobs still achieving desired parameter of oil due to exposure to air during maintenance works after necessary oil filling. Arrangement of Oil Filter machine is in party"s scope. Transportation of oil drums is also in party"s scope from nearest store.
15Transformer surface cleaning by suitable cleaning agent, checking, oil settling,venting jobs after completion of oil filtration & filling work.
16Station Transformer #8, 55MVA, 220KV/6.9KV, Current(HV):144.34Amp Current(LV):2301.03Amp, Connection: YNynyn0, Cooling-ONAF/ONAN, Oil Qty(Ltr): 52440
17Oil filtration after successful completion of jobs still achieving desired parameter of oil due to exposure to air during maintenance works after necessary oil filling. Arrangement of Oil Filter machine is in party"s scope.Transportation of oil drums is also in party"s scope from nearest store.
18Transformer surface cleaning by suitable cleaning agent, checking, oil settling,venting jobs after completion of oil filtration & filling work.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.