Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 0 days TDR #32657773

Rate Contract For Composite Shutdown Contract At Bongaigaon Refinery

Issued by Boards / Undertakings / PSU · dhaligaon, Assam
Tender Value
4.47 Crore
Estimated cost
Bid Submission
21 Jun 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
dhaligaon → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Rate Contract For Composite Shutdown Contract At Bongaigaon Refinery

BOQ

Name of Work: RATE CONTRACT FOR COMPOSITE SHUTDOWN CONTRACT AT BONGAIGAON REFINERY
Sl. No. Item Description
1PART-A EMERGENCY/ UNPLANNED/ M&I SD JOBS
2EMERGENCY/ UNPLANNED/ M&I SHUT DOWN JOBS
3DISMANTLINGOF CARBON STEEL/ALLOY STEEL PIPINGBY HOT WORK (INSULATED / UNINSULATED) Dismantling and removal of above ground, overhead or under ground (upto height depth of 5m) redundant/ steam traced / insulated/ uninsulated piping of carbon steel / alloy steel by gas cutting or by grinding from various locations such as pipe racks, columns, pump house, vessels, heaters, heat exchangers, desalter etc. including removal of insulation material, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc.; transporting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within refinery premises and completing the job as per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and de-blinding, area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paidunder separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
415 mm NB
520 mm NB
625 mm NB
740 mm NB
850 mm NB
980 mm NB
10100 mm NB
11150 mm NB
12200 mm NB
13250 mm NB
14300 mm NB
15350 mm NB
16400 mm NB
17450 mm NB
18500 mm NB
19600 mm NB
20700 mm NB
21750 mm NB
22800 mm NB
23900 mm NB
24DISMANTLINGOF STAINLESS STEEL PIPINGBY HOT WORK (INSULATED / UNINSULATED) Dismantling and removal of above ground or overhead / underground in trenches/ redundant/ steam traced/ insulated/ uninsulated piping of stainless steel by grinding / gouging / plasma cutting from various locations such as pipe racks, columns, pump house, vessels, heaters, heat exchangers, desalter etc. including removal of insulation materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc.; transporting and stacking the salvageable useful materials to workshop / instrument workshop / store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within refinery premises all complete as per the instructions of engineer in-charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblinding area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paidunder separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
2515 mm NB
2620 mm NB
2725 mm NB
2840 mm NB
2950 mm NB
3080 mm NB
31100 mm NB
32150 mm NB
33200 mm NB
34250 mm NB
35300 mm NB
36350 mm NB
37400 mm NB
38450 mm NB
39500 mm NB
40COLD CUTTING OF STAINLESS STEEL PIPE LINES(INSULATED / UNINSULATED) Cold cutting and removal of above ground or overhead / underground in trenches/ redundant/ steam traced/ insulated/ uninsulated piping of stainless steel from various locations such as pipe racks, columns, pump house, vessels, heaters, heat exchangers, desalter etc. including removal of insulation materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc.; transporting and stacking the salvageable useful materials to workshop / instrument workshop / store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within refinery premises and completing the job as per the instructions of engineer in-charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in including area preparation, taking clearance for hot jobs, blinding and deblinding, area cleaning after completion of work, arrangment for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paidunder separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
4115 MM NB
4220 MM NB
4325 MM NB
4440 MM NB
4550 MM NB
4680 MM NB
47100 MM NB
48150 MM NB
49200 MM NB
50COLD CUTTING OF CARBON / ALLOY STEEL PIPE LINES(INSULATED / UNINSULATED) Cold cutting and removal of above ground or overhead/ underground in tranches/ insulated/ uninsulated pipelines of carbon steel/ alloy steel from various location such as pipe racks, columns, pump house, vessels, heaters, heat exchangers, desalters etc. including removal of insulation materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down / lifting the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaginguseful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc. transporting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engineer-in-Chargeand shifting the scrap pipes etc. to scrap yard or any other location within refinery premises all complete as per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblindingarea cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paidunder separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
5115 MM NB
5220 MM NB
5325 MM NB
5440 MM NB
5550 MM NB
5680 MM NB
57100 MM NB
58150 MM NB
59200 MM NB
60250 MM NB
61300 MM NB
62350 MM NB
63400 MM NB
64450 MM NB
65500 MM NB
66600 MM NB
67CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6013) - UNITS Transportation of all piping items from owner\"s storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includessupplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.
6815mm NB Sch upto 40 (TIG)
6915mmNB Sch above 40 but upto 80(TIG)
7015mmNB Sch above 80 but upto 160(TIG)
7115mm NB Sch XX Strong (TIG)
7220mm NB Sch upto 40 (TIG)
7320mmNB Sch above 40 but upto 80(TIG)
7420mmNB Sch above 80 but upto 160(TIG)
7520mm NB Sch XX Strong (TIG)
7625mm NB Sch upto 40 (TIG)
7725mmNB Sch above 40 but upto 80(TIG)
7825mmNB Sch above 80 but upto 160(TIG)
7925mm NB Sch XX Strong (TIG)
8040mm NB Sch upto 40 (TIG)
8140mmNB Sch above 40 but upto 80(TIG)
8240mmNB Sch above 80 but upto 160(TIG)
8340mm NB Sch XX Strong (TIG)
84CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7018) Transportation of all piping items from owner\"s storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includessupplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
8515mmNB Sch above 40 but upto 80(TIG)
8615mmNB Sch above 80 but upto 160(TIG)
8720mmNB Sch above 40 but upto 80(TIG)
8820mmNB Sch above 80 but upto 160(TIG)
8925mm NB Sch upto 40 (TIG)
9025mmNB Sch above 40 but upto 80(TIG)
9140mmNB Sch above 40 but upto 80(TIG)
9240mmNB Sch above 80 but upto 160(TIG)
9350 mm NB, Schedule upto 40
9450 mm NB, Schedule more than 40 but upto 80
9550 mm NB, Schedule above 80 but upto 160
9680 mm NB, Schedule upto 40
9780 mm NB, Schedule more than 40 but upto 80
9880 mm NB, Schedule above 80 but upto 160
99100 mm NB, Schedule upto 40
100100 mm NB, Schedule more than 40 but upto 80
101100 mm NB, Schedule above 80 but upto 160
102150 mm NB, Schedule upto 40
103150 mm NB, Schedule more than 40 but upto 80
104200 mm NB, Schedule upto 20
105200 mm NB, Schedule above 20 but upto 40
106200 mm NB, Schedule more than 40 but upto 80
107250 mm NB, Schedule upto 20
108250 mm NB, Schedule above 20 but upto 40
109250 mm NB, Schedule more than 40 but upto 80
110300 mm NB, Schedule upto 20
111300 mm NB, Schedule above 20 but upto 40
112300 mm NB, Schedule more than 40 but upto 80
113350 mm NB, Schedule upto 20
114350 mm NB, Schedule above 20 but upto 40
115350 mm NB, Schedule more than 40 but upto 80
116400 mm NB, Schedule upto 20
117400 mm NB, Schedule above 20 but upto 40
118400 mm NB, Schedule more than 40 but upto 80
119450 mm NB, Schedule upto 20
120450 mm NB, Schedule above 20 but upto 40
121450 mm NB, Schedule above 40 but upto 80
122500 mm NB, Schedule upto 20
123500 mm NB, Schedule above 20 but upto 40
124600 mm NB, Schedule upto 20
125600 mm NB, Schedule above 20 but upto 40
126700 mm NB, Schedule upto 20
127700 mm NB, Schedule above 20 but upto 40
128750 mm NB, Schedule upto 20
129750 mm NB, Schedule above 20 but upto 40
130800 mm NB, Schedule upto 20
131800 mm NB, Schedule above 20 but upto 40
132900 mm NB, Schedule upto 20
133900 mm NB, Schedule above 20 but upto 40
134PROVISION OF REINFORCEMENT PAD (WITH WELDING ELECTRODE E-6010 / E-7018) Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.
135Branch size 2 inch
136Branch size 3 inch
137Branch size 4 inch
138Branch size 6 inch
139Branch size 8 inch
140Branch size 10 inch
141Branch size 12 inch
142Branch size 14 inch
143Branch size 16 inch
144Branch size 18 inch
145EXTRA FOR IBR GRADE CS PIPING JOINTS Extra for IBR grade carbon steel piping joints. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose (20% of joints).
14615mm NB Sch above 40 but upto 80
14715 mm NB, Schedule above 80 but upto 160
14820mm NB Sch above 40 but upto 80
14920 mm NB, Schedule above 80 but upto 160
15025mm NB Sch above 40 but upto 80
15125 mm NB, Schedule above 80 but upto 160
15240mmNB Sch above 40 but upto 80
15340 mm NB, Schedule above 80 but upto 160
15450 mm NB, Schedule upto 40
15550 mm NB, Schedule more than 40 but upto 80
15650 mm NB, Schedule above 80 but upto 160
15780 mm NB, Schedule upto 40
15880 mm NB, Schedule more than 40 but upto 80
15980 mm NB, Schedule above 80 but upto 160
160100 mm NB, Schedule upto 40
161100 mm NB, Schedule more than 40 but upto 80
162100 mm NB, Schedule above 80 but upto 160
163150 mm NB, Schedule upto 40
164150 mm NB, Schedule more than 40 but upto 80
165200 mm NB, Schedule upto 20
166200 mm NB, Schedule above 20 but upto 40
167200 mm NB, Schedule more than 40 but upto 80
168250 mm NB, Schedule upto 20
169250 mm NB, Schedule above 20 but upto 40
170250 mm NB, Schedule more than 40 but upto 80
171300 mm NB, Schedule upto 20
172300 mm NB, Schedule above 20 but upto 40
173300 mm NB, Schedule more than 40 but upto 80
174350 mm NB, Schedule upto 20
175350 mm NB, Schedule above 20 but upto 40
176350 mm NB, Schedule more than 40 but upto 80
177400 mm NB, Schedule upto 20
178400 mm NB, Schedule above 20 but upto 40
179400 mm NB, Schedule more than 40 but upto 80
180450 mm NB, Schedule upto 20
181450 mm NB, Schedule above 20 but upto 40
182450 mm NB, Schedule above 40 but upto 80
183500 mm NB, Schedule upto 20
184500 mm NB, Schedule above 20 but upto 40
185600 mm NB, Schedule upto 20
186600 mm NB, Schedule above 20 but upto 40
187SALVAGING OF CARBON STEEL PIPING
188CARBON STEEL PIPING JOINTS FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6013) Transportation of all piping items from owner\"s storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includessupplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
18915mmNB Sch above 40 but upto 80(TIG)
19015mmNB Sch above 80 but upto 160(TIG)
19120mmNB Sch above 40 but upto 80(TIG)
19220mmNB Sch above 80 but upto 160(TIG)
19325mmNB Sch above 40 but upto 80(TIG)
19425mmNB Sch above 80 but upto 160(TIG)
19540mmNB Sch above 40 but upto 80(TIG)
19640mmNB Sch above 80 but upto 160(TIG)
19750 mm NB, Schedule upto 40
19850 mm NB, Schedule more than 40 but upto 80
19950 mm NB, Schedule above 80 but upto 160
20080 mm NB, Schedule upto 40
20180 mm NB, Schedule more than 40 but upto 80
202100 mm NB, Schedule upto 40
203100 mm NB, Schedule more than 40 but upto 80
204150 mm NB, Schedule upto 40
205150 mm NB, Schedule more than 40 but upto 80
206200 mm NB, Schedule upto 20
207200 mm NB, Schedule above 20 but upto 40
208200 mm NB, Schedule more than 40 but upto 80
209250 mm NB, Schedule upto 20
210250 mm NB, Schedule above 20 but upto 40
211250 mm NB, Schedule more than 40 but upto 80
212300 mm NB, Schedule upto 20
213300 mm NB, Schedule above 20 but upto 40
214300 mm NB, Schedule more than 40 but upto 80
215350 mm NB, Schedule upto 20
216350 mm NB, Schedule above 20 but upto 40
217350 mm NB, schedule more than 40 but upto 80
218400 mm NB, Schedule upto 20
219400 mm NB, Schedule above 20 but upto 40
220450 mm NB, Schedule upto 20
221450 mm NB, Schedule above 20 but upto 40
222500 mm NB, Schedule upto 20
223500 mm NB, Schedule above 20 but upto 40
224600 mm NB, Schedule upto 20
225600 mm NB, Schedule above 20 but upto 40
226Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gr inding, edge preparation as per theinstructions of the Engineer-in-Chargeto his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs,area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the dire ctions of the Engineer- in-Charge.
227Branch size 2 inch
228Branch size 3 inch
229Branch size 4 inch
230Branch size 6 inch
231Branch size 8 inch
232Branch size 10 inch
233Branch size 12 inch
234Branch size 14 inch
235Branch size 16 inch
236Branch size 18 inch
237ALLOY STEEL PIPING (ASTM A335 GR. P1, P2, P11 AND P12) JOINTS Transportation of all piping items from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawings etc. (alloy steel joints shall be welded by doing root run using TIG welding followed by filler passes by manual / semi-automatic arc welding. The job is to be pre-heated prior to welding and all joints to be stress relieved and fully radiographed, however, charges for stress relieving and radiography shall be paid separately),threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5.Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
23815mm NB Sch upto 80 (TIG)
23915mm NB Sch above 80 (TIG)
24020mm NB Sch upto 80 (TIG)
24120mm NB Sch above 80 (TIG)
24225mm NB Sch upto 80 (TIG)
24325mm NB Sch above 80 (TIG)
24440mm NB Sch upto 40 (TIG)
24540mmNB Sch above 40 but upto 80(TIG)
24640mmNB Sch above 80 but upto 120(TIG)
24740mm NB Sch above 120 (TIG)
248\"50 mm NB, Schedule upto 40 \"
249\"50mm NB, Schedule above 40 but upto 80 \"
250\"50 mm NB, Schedule above 80 but upto 120\"
251\"50 mm NB, Schedule above 120 \"
252\"80 mm NB, Schedule upto 40 \"
253\"80mm NB, Schedule above 40 but upto 80 \"
254\"100mm NB, Schedule upto 40 \"
255\"100mm NB, Schedule above 40 but upto 80 \"
256\"150 mm NB, Schedule upto 40 \"
257\"150 mm NB, Schedule more than 40 but upto 80\"
258\"200 mm NB, Schedule upto 20 \"
259\"200 mm NB, Schedule above 20 but upto 40 \"
260\"200 mm NB, Schedule more than 40 but upto 80\"
261\"250 mm NB, Schedule upto 20 \"
262\"250 mm NB, Schedule above 20 but upto 40 \"
263\"250 mm NB, Schedule more than 40 but upto 80\"
264\"300 mm NB, Schedule upto 20 \"
265\"300 mm NB, Schedule above 20 but upto 40 \"
266\"300 mm NB, Schedule more than 40 but upto 80\"
267\"350 mm NB, Schedule upto 20 \"
268\"350 mm NB, Schedule above 20 but upto 40 \"
269\"350 mm NB, Schedule more than 40 but upto 80\"
270\"400 mm NB, Schedule upto 20 \"
271\"400 mm NB, Schedule above 20 but upto 40 \"
272\"400 mm NB, Schedule more than 40 but upto 80\"
273\"450 mm NB, Schedule upto 20 \"
274\"450 mm NB, Schedule above 20 but upto 40 \"
275\"450 mm NB, Schedule above 40 but upto 80\"
276\"500 mm NB, Schedule upto 20 \"
277\"500 mm NB, Schedule above 20 but upto 40 \"
278\"600 mm NB, Schedule upto 20 \"
279\"600 mm NB, Schedule above 20 but upto 40 \"
280PROVISION OF REINFORCEMENT PAD FOR P-1, P-2, P-11 AND P-12 Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE: 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
281Branch size 2 inch
282Branch size 3 inch
283Branch size 4 inch
284Branch size 6 inch
285Branch size 8 inch
286Branch size 10 inch
287Branch size 12 inch
288Branch size 14 inch
289Branch size 16 inch
290Branch size 18 inch
291EXTRA FOR IBR GRADE ALLOY STEEL PIPING (ASTM A335 GR.\"P1, P2, P11 & 12) JOINTS Extra for IBR grade alloy steel piping (ASTM A335 GR. P1, P2, P11 and 12) joints. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose.
292\"15 mm NB, Schedule upto 80 \"
293\"15 mm NB, Schedule above 80 \"
294\"20 mm NB, Schedule upto 80 \"
295\"20 mm NB, Schedule above 80 \"
296\"25 mm NB, Schedule upto 80 \"
297\"25 mm NB, Schedule above 80 \"
298\"40 mm NB, Schedule upto 40 \"
299\"40mm NB, Schedule above 40 but upto 80 \"
300\"40 mm NB, Schedule above 80 but upto 120\"
301\"40 mm NB, Schedule above 120 \"
302\"50 mm NB, Schedule upto 40 \"
303\"50mm NB, Schedule above 40 but upto 80 \"
304\"50 mm NB, Schedule above 80 but upto 120\"
305\"50 mm NB, Schedule above 120 \"
306\"80 mm NB, Schedule upto 40 \"
307\"80mm NB, Schedule above 40 but upto 80 \"
308\"100mm NB, Schedule upto 40 \"
309\"100mm NB, Schedule above 40 but upto 80 \"
310\"150 mm NB, Schedule upto 40 \"
311\"150 mm NB, Schedule more than 40 but upto 80\"
312\"200 mm NB, Schedule upto 20 \"
313\"200 mm NB, Schedule above 20 but upto 40 \"
314\"200 mm NB, Schedule more than 40 but upto 80\"
315\"250 mm NB, Schedule upto 20 \"
316\"250 mm NB, Schedule above 20 but upto 40 \"
317\"250 mm NB, Schedule more than 40 but upto 80\"
318\"300 mm NB, Schedule upto 20 \"
319\"300 mm NB, Schedule above 20 but upto 40 \"
320\"300 mm NB, Schedule more than 40 but upto 80\"
321\"350 mm NB, Schedule upto 20 \"
322\"350 mm NB, Schedule above 20 but upto 40 \"
323\"350 mm NB, Schedule more than 40 but upto 80\"
324\"400 mm NB, Schedule upto 20 \"
325\"400 mm NB, Schedule above 20 but upto 40 \"
326\"400 mm NB, Schedule more than 40 but upto 80\"
327\"450 mm NB, Schedule upto 20 \"
328\"450 mm NB, Schedule above 20 but upto 40 \"
329\"450 mm NB, Schedule above 40 but upto 80\"
330\"500 mm NB, Schedule upto 20 \"
331\"500 mm NB, Schedule above 20 but upto 40 \"
332\"600 mm NB, Schedule upto 20 \"
333\"600 mm NB, Schedule above 20 but upto 40 \"
334ALLOY STEEL PIPING (ASTM A335 GR. P22) JOINTS Transportation of all piping items from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawings etc. (alloy steel joints shall be welded by doing root run using TIG welding followed by filler passes by manual / semi-automatic arc welding. The job is to be pre-heated prior to welding and all joints to be stress relieved and fully radiographed, however, charges for stress relieving and radiography shall be paid separately),threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5.Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
33515mm NB Sch upto 80 (TIG)
33615mm NB Sch above 80 (TIG)
33720mm NB Sch upto 80 (TIG)
33820mm NB Sch above 80 (TIG)
33925mm NB Sch upto 80 (TIG)
34025mm NB Sch above 80 (TIG)
34140mm NB Sch upto 40 (TIG)
34240mmNB Sch above 40 but upto 80(TIG)
34340mmNB Sch above 80 but upto 120(TIG)
34440mm NB Sch above 120 (TIG)
345\"50 mm NB, Schedule upto 40 \"
346\"50mm NB, Schedule above 40 but upto 80 \"
347\"50 mm NB, Schedule above 80 but upto 120\"
348\"50 mm NB, Schedule above 120 \"
349\"80 mm NB, Schedule upto 40 \"
350\"80mm NB, Schedule above 40 but upto 80 \"
351\"100mm NB, Schedule upto 40 \"
352\"100mm NB, Schedule above 40 but upto 80 \"
353\"150 mm NB, Schedule upto 40 \"
354\"150 mm NB, Schedule more than 40 but upto 80\"
355\"200 mm NB, Schedule upto 20 \"
356\"200 mm NB, Schedule above 20 but upto 40 \"
357\"200 mm NB, Schedule more than 40 but upto 80\"
358\"250 mm NB, Schedule upto 20 \"
359\"250 mm NB, Schedule above 20 but upto 40 \"
360\"250 mm NB, Schedule more than 40 but upto 80\"
361\"300 mm NB, Schedule upto 20 \"
362\"300 mm NB, Schedule above 20 but upto 40 \"
363\"300 mm NB, Schedule more than 40 but upto 80\"
364\"350 mm NB, Schedule upto 20 \"
365\"350 mm NB, Schedule above 20 but upto 40 \"
366\"350 mm NB, Schedule more than 40 but upto 80\"
367\"400 mm NB, Schedule upto 20 \"
368\"400 mm NB, Schedule above 20 but upto 40 \"
369\"400 mm NB, Schedule more than 40 but upto 80\"
370\"450 mm NB, Schedule upto 20 \"
371\"450 mm NB, Schedule above 20 but upto 40 \"
372\"450 mm NB, Schedule above 40 but upto 80\"
373\"500 mm NB, Schedule upto 20 \"
374\"500 mm NB, Schedule above 20 but upto 40 \"
375\"600 mm NB, Schedule upto 20 \"
376\"600 mm NB, Schedule above 20 but upto 40 \"
377PROVISION OF REINFORCEMENT PAD FOR P-22 Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
378Branch size 2 inch
379Branch size 3 inch
380Branch size 4 inch
381Branch size 6 inch
382Branch size 8 inch
383Branch size 10 inch
384Branch size 12 inch
385Branch size 14 inch
386Branch size 16 inch
387Branch size 18 inch
388EXTRA FOR IBR GRADE ALLOY STEEL PIPING (ASTM A335 GR. P22) JOINTS Extra for IBR grade alloy steel piping (ASTM A335 GR. P22) joints. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose.
389\"15 mm NB, Schedule upto 80 \"
390\"15 mm NB, Schedule above 80 \"
391\"20 mm NB, Schedule upto 80 \"
392\"20 mm NB, Schedule above 80 \"
393\"25 mm NB, Schedule upto 80 \"
394\"25 mm NB, Schedule above 80 \"
395\"40 mm NB, Schedule upto 40 \"
396\"40mm NB, Schedule above 40 but upto 80 \"
397\"40 mm NB, Schedule above 80 but upto 120\"
398\"40 mm NB, Schedule above 120 \"
399\"50 mm NB, Schedule upto 40 \"
400\"50mm NB, Schedule above 40 but upto 80 \"
401\"50 mm NB, Schedule above 80 but upto 120\"
402\"50 mm NB, Schedule above 120 \"
403\"80 mm NB, Schedule upto 40 \"
404\"80mm NB, Schedule above 40 but upto 80 \"
405\"100mm NB, Schedule upto 40 \"
406\"100mm NB, Schedule above 40 but upto 80 \"
407\"150 mm NB, Schedule upto 40 \"
408\"150 mm NB, Schedule more than 40 but upto 80\"
409\"200 mm NB, Schedule upto 20 \"
410\"200 mm NB, Schedule above 20 but upto 40 \"
411\"200 mm NB, Schedule more than 40 but upto 80\"
412\"250 mm NB, Schedule upto 20 \"
413\"250 mm NB, Schedule above 20 but upto 40 \"
414\"250 mm NB, Schedule more than 40 but upto 80\"
415\"300 mm NB, Schedule upto 20 \"
416\"300 mm NB, Schedule above 20 but upto 40 \"
417\"300 mm NB, Schedule more than 40 but upto 80\"
418\"350 mm NB, Schedule upto 20 \"
419\"350 mm NB, Schedule above 20 but upto 40 \"
420\"350 mm NB, Schedule more than 40 but upto 80\"
421\"400 mm NB, Schedule upto 20 \"
422\"400 mm NB, Schedule above 20 but upto 40 \"
423\"400 mm NB, Schedule more than 40 but upto 80\"
424\"450 mm NB, Schedule upto 20 \"
425\"450 mm NB, Schedule above 20 but upto 40 \"
426\"450 mm NB, Schedule above 40 but upto 80\"
427\"500 mm NB, Schedule upto 20 \"
428\"500 mm NB, Schedule above 20 but upto 40 \"
429\"600 mm NB, Schedule upto 20 \"
430\"600 mm NB, Schedule above 20 but upto 40 \"
431ALLOY STEEL PIPING (ASTM A335 GR. P5) JOINTS Transportation of all piping items from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawings etc. (alloy steel joints shall be welded by doing root run using TIG welding followed by filler passes by manual / semi-automatic arc welding. The job is to be pre-heated prior to welding and all joints to be stress relieved and fully radiographed, however, charges for stress relieving and radiography shall be paid separately),threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
43215mm NB Sch upto 80 (TIG)
43315mm NB Sch above 80 (TIG)
43420mm NB Sch upto 80 (TIG)
43520mm NB Sch above 80 (TIG)
43625mm NB Sch upto 80 (TIG)
43725mm NB Sch above 80 (TIG)
43840mm NB Sch upto 40 (TIG)
43940mmNB Sch above 40 but upto 80(TIG)
44040mmNB Sch above 80 but upto 120(TIG)
44140mm NB Sch above 120 (TIG)
442\"50 mm NB, Schedule upto 40 \"
443\"50mm NB, Schedule above 40 but upto 80 \"
444\"50 mm NB, Schedule above 80 but upto 120\"
445\"50 mm NB, Schedule above 120 \"
446\"80 mm NB, Schedule upto 40 \"
447\"80mm NB, Schedule above 40 but upto 80 \"
448\"100mm NB, Schedule upto 40 \"
449\"100mm NB, Schedule above 40 but upto 80 \"
450\"150 mm NB, Schedule upto 40 \"
451\"150 mm NB, Schedule more than 40 but upto 80\"
452\"200 mm NB, Schedule upto 20 \"
453\"200 mm NB, Schedule above 20 but upto 40 \"
454\"200 mm NB, Schedule more than 40 but upto 80\"
455\"250 mm NB, Schedule upto 20 \"
456\"250 mm NB, Schedule above 20 but upto 40 \"
457\"250 mm NB, Schedule more than 40 but upto 80\"
458\"300 mm NB, Schedule upto 20 \"
459\"300 mm NB, Schedule above 20 but upto 40 \"
460\"300 mm NB, Schedule more than 40 but upto 80\"
461\"350 mm NB, Schedule upto 20 \"
462\"350 mm NB, Schedule above 20 but upto 40 \"
463\"350 mm NB, Schedule more than 40 but upto 80\"
464\"400 mm NB, Schedule upto 20 \"
465\"400 mm NB, Schedule above 20 but upto 40 \"
466\"400 mm NB, Schedule more than 40 but upto 80\"
467\"450 mm NB, Schedule upto 20 \"
468\"450 mm NB, Schedule above 20 but upto 40 \"
469\"450 mm NB, Schedule above 40 but upto 80\"
470\"500 mm NB, Schedule upto 20 \"
471\"500 mm NB, Schedule above 20 but upto 40 \"
472\"600 mm NB, Schedule upto 20 \"
473\"600 mm NB, Schedule above 20 but upto 40 \"
474PROVISION OF REINFORCEMENT PAD FOR P-5 Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
475Branch size 2 inch
476Branch size 3 inch
477Branch size 4 inch
478Branch size 6 inch
479Branch size 8 inch
480Branch size 10 inch
481Branch size 12 inch
482Branch size 14 inch
483Branch size 16 inch
484Branch size 18 inch
485EXTRA FOR IBR GRADE ALLOY STEEL PIPING (ASTM A335 GR. P5) JOINTS Extra for IBR grade alloy steel piping (ASTM A335 GR. P5) joints. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose.
486\"15 mm NB, Schedule upto 80 \"
487\"15 mm NB, Schedule above 80 \"
488\"20 mm NB, Schedule upto 80 \"
489\"20 mm NB, Schedule above 80 \"
490\"25 mm NB, Schedule upto 80 \"
491\"25 mm NB, Schedule above 80 \"
492\"40 mm NB, Schedule upto 40 \"
493\"40mm NB, Schedule above 40 but upto 80 \"
494\"40 mm NB, Schedule above 80 but upto 120\"
495\"40 mm NB, Schedule above 120 \"
496\"50 mm NB, Schedule upto 40 \"
497\"50mm NB, Schedule above 40 but upto 80 \"
498\"50 mm NB, Schedule above 80 but upto 120\"
499\"50 mm NB, Schedule above 120 \"
500\"80 mm NB, Schedule upto 40 \"
501\"80mm NB, Schedule above 40 but upto 80 \"
502\"100mm NB, Schedule upto 40 \"
503\"100mm NB, Schedule above 40 but upto 80 \"
504\"150 mm NB, Schedule upto 40 \"
505\"150 mm NB, Schedule more than 40 but upto 80\"
506\"200 mm NB, Schedule upto 20 \"
507\"200 mm NB, Schedule above 20 but upto 40 \"
508\"200 mm NB, Schedule more than 40 but upto 80\"
509\"250 mm NB, Schedule upto 20 \"
510\"250 mm NB, Schedule above 20 but upto 40 \"
511\"250 mm NB, Schedule more than 40 but upto 80\"
512\"300 mm NB, Schedule upto 20 \"
513\"300 mm NB, Schedule above 20 but upto 40 \"
514\"300 mm NB, Schedule more than 40 but upto 80\"
515\"350 mm NB, Schedule upto 20 \"
516\"350 mm NB, Schedule above 20 but upto 40 \"
517\"350 mm NB, Schedule more than 40 but upto 80\"
518\"400 mm NB, Schedule upto 20 \"
519\"400 mm NB, Schedule above 20 but upto 40 \"
520\"400 mm NB, Schedule more than 40 but upto 80\"
521\"450 mm NB, Schedule upto 20 \"
522\"450 mm NB, Schedule above 20 but upto 40 \"
523\"450 mm NB, Schedule above 40 but upto 80\"
524\"500 mm NB, Schedule upto 20 \"
525\"500 mm NB, Schedule above 20 but upto 40 \"
526\"600 mm NB, Schedule upto 20 \"
527\"600 mm NB, Schedule above 20 but upto 40 \"
528ALLOY STEEL PIPING (ASTM A335 GR. P9) JOINTS Transportation of all piping items from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawings etc. (alloy steel joints shall be welded by doing root run using TIG welding followed by filler passes by manual / semi-automatic arc welding. The job is to be pre-heated prior to welding and all joints to be stress relieved and fully radiographed, however, charges for stress relieving and radiography shall be paid separately),threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
52915mm NB Sch upto 80 (TIG)
53015mm NB Sch above 80 (TIG)
53120mm NB Sch upto 80 (TIG)
53220mm NB Sch above 80 (TIG)
53325mm NB Sch upto 80 (TIG)
53425mm NB Sch above 80 (TIG)
53540mm NB Sch upto 40 (TIG)
53640mmNB Sch above 40 but upto 80(TIG)
53740mmNB Sch above 80 but upto 120(TIG)
53840mm NB Sch above 120 (TIG)
539\"50 mm NB, Schedule upto 40 \"
540\"50mm NB, Schedule above 40 but upto 80 \"
541\"50 mm NB, Schedule above 80 but upto 120\"
542\"50 mm NB, Schedule above 120 \"
543\"80 mm NB, Schedule upto 40 \"
544\"80mm NB, Schedule above 40 but upto 80 \"
545\"100mm NB, Schedule upto 40 \"
546\"100mm NB, Schedule above 40 but upto 80 \"
547\"150 mm NB, Schedule upto 40 \"
548\"150 mm NB, Schedule more than 40 but upto 80\"
549\"200 mm NB, Schedule upto 20 \"
550\"200 mm NB, Schedule above 20 but upto 40 \"
551\"200 mm NB, Schedule more than 40 but upto 80\"
552\"250 mm NB, Schedule upto 20 \"
553\"250 mm NB, Schedule above 20 but upto 40 \"
554\"250 mm NB, Schedule more than 40 but upto 80\"
555\"300 mm NB, Schedule upto 20 \"
556\"300 mm NB, Schedule above 20 but upto 40 \"
557\"300 mm NB, Schedule more than 40 but upto 80\"
558\"350 mm NB, Schedule upto 20 \"
559\"350 mm NB, Schedule above 20 but upto 40 \"
560\"350 mm NB, Schedule more than 40 but upto 80\"
561\"400 mm NB, Schedule upto 20 \"
562\"400 mm NB, Schedule above 20 but upto 40 \"
563\"400 mm NB, Schedule more than 40 but upto 80\"
564\"450 mm NB, Schedule upto 20 \"
565\"450 mm NB, Schedule above 20 but upto 40 \"
566\"450 mm NB, Schedule above 40 but upto 80\"
567\"500 mm NB, Schedule upto 20 \"
568\"500 mm NB, Schedule above 20 but upto 40 \"
569\"600 mm NB, Schedule upto 20 \"
570\"600 mm NB, Schedule above 20 but upto 40 \"
571PROVISION OF REINFORCEMENT PAD FOR P-9 Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
572Branch size 2 inch
573Branch size 3 inch
574Branch size 4 inch
575Branch size 6 inch
576Branch size 8 inch
577Branch size 10 inch
578Branch size 12 inch
579Branch size 14 inch
580Branch size 16 inch
581Branch size 18 inch
582SALVAGING OF ALLOY STEEL PIPING Cutting, Grinding, Bevelling and Welding of pipe ends of alloy steel pipes of different sizes, grades and thickness upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches as per instruction of the Engineer-in-Charge complete with supply of tools, tackles consumables labours and contractor\"s supervision. The rate shall be applicable for the following: Upto 2 inch NB- Sch. 80, above 2 inch but upto 10 inch- Sch. 40, 12 inch - Sch. 30, above 12 inch- Sch. 20. NOTE: 1.For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 2.Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be pa id separately.
583\"AS P1, P2, P11, P12\"
584AS P22
585AS P5
586AS P9
587STAINLESS STEEL PIPING (GR. SS 300) JOINTS Transportation of all piping items from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables a nd labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fa brication as directed by the Engineer-in-Charge. NOTE: 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
58815mm NB Sch upto 40 (TIG)
58915mmNB Sch more than 40 but upto 80(TIG)
59015mmNB Sch above 80 but upto 120(TIG)
59120mm NB Sch upto 40 (TIG)
59220mmNB Sch more than 40 but upto 80(TIG)
59320mmNB Sch above 80 but upto 120(TIG)
59425mm NB Sch upto 40 (TIG)
59525mmNB Sch more than 40 but upto 80(TIG)
59625mmNB Sch above 80 but upto 120(TIG)
59740mm NB Sch upto 40 (TIG)
59840mmNB Sch more than 40 but upto 80(TIG)
59940mmNB Sch above 80 but upto 120(TIG)
600\"50 mm NB, Schedule upto 40 \"
601\"50 mm NB, Schedule more than 40 but upto 80\"
602\"80 mm NB, Schedule upto 40 \"
603\"80 mm NB, Schedule more than 40 but upto 80\"
604\"100 mm NB, Schedule upto 40 \"
605\"100 mm NB, Schedule more than 40 but upto 80\"
606\"150 mm NB, Schedule upto 40 \"
607\"150 mm NB, Schedule more than 40 but upto 80\"
608\"150 mm NB, Schedule above 80 but upto 120\"
609\"200 mm NB, Schedule upto 40 \"
610\"200 mm NB, Schedule more than 40 but upto 80\"
611\"250 mm NB, Schedule upto 40 \"
612\"250 mm NB, Schedule more than 40 but upto 80\"
613\"300 mm NB, Schedule upto 40 \"
614\"300 mm NB, Schedule more than 40 but upto 80\"
615\"350 mm NB, Schedule upto 40 \"
616\"350 mm NB, Schedule more than 40 but upto 80\"
617\"400 mm NB, Schedule upto 40 \"
618\"400 mm NB, Schedule more than 40 but upto 80\"
619\"450 mm NB, Schedule upto 40 \"
620\"450 mm NB, Schedule more than 40 but upto 80\"
621\"500 mm NB, Schedule upto 40 \"
622\"600 mm NB, Schedule upto 40 \"
623PROVISION OF REINFORCEMENT PAD FOR SS 300 SERIES Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
624Branch size 2 inch
625Branch size 3 inch
626Branch size 4 inch
627Branch size 6 inch
628Branch size 8 inch
629Branch size 10 inch
630Branch size 12 inch
631Branch size 14 inch
632Branch size 16 inch
633Branch size 18 inch
634STAINLESS STEEL PIPING (GR. SS 400) JOINTS Transportation of all piping items from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches; anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing stripwherever required; welding prefabricated shoes and supports (including alignment) as per the drawings, including preparation of small bore isometric upto 1.5 inch NB, specifications, codes etc. and as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables a nd labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fa brication as directed by the Engineer-in-Charge. NOTE: 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.
63515mm NB Sch upto 40 (TIG)
63615mmNB Sch more than 40 but upto 80(TIG)
63715mmNB Sch above 80 but upto 120(TIG)
63820mm NB Sch upto 40 (TIG)
63920mmNB Sch more than 40 but upto 80(TIG)
64020mmNB Sch above 80 but upto 120(TIG)
64125mm NB Sch upto 40 (TIG)
64225mmNB Sch more than 40 but upto 80(TIG)
64325mmNB Sch above 80 but upto 120(TIG)
64440mm NB Sch upto 40 (TIG)
64540mmNB Sch more than 40 but upto 80(TIG)
64640mmNB Sch above 80 but upto 120(TIG)
647\"50 mm NB, Schedule upto 40 \"
648\"50 mm NB, Schedule more than 40 but upto 80\"
649\"80 mm NB, Schedule upto 40 \"
650\"80 mm NB, Schedule more than 40 but upto 80\"
651\"100 mm NB, Schedule upto 40 \"
652\"100 mm NB, Schedule more than 40 but upto 80\"
653\"150 mm NB, Schedule upto 40 \"
654\"150 mm NB, Schedule more than 40 but upto 80\"
655\"200 mm NB, Schedule upto 40 \"
656\"200 mm NB, Schedule more than 40 but upto 80\"
657\"250 mm NB, Schedule upto 40 \"
658\"250 mm NB, Schedule more than 40 but upto 80\"
659\"300 mm NB, Schedule upto 40 \"
660\"300 mm NB, Schedule more than 40 but upto 80\"
661PROVISION OF REINFORCEMENT PAD FOR SS 400 SERIES Transportation from owner\"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per theinstructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
662Branch size 2 inch
663Branch size 3 inch
664Branch size 4 inch
665Branch size 6 inch
666Branch size 8 inch
667Branch size 10 inch
668Branch size 12 inch
669SALVAGING OF STAINLESS STEEL PIPING Cutting, Grinding, Bevelling and Welding of pipe ends ofSS pipes of different sizes, grades and thickness upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches as per instruction of the Engineer-in-Charge complete with supply of tools, tackles consumables labours and contractor\"s supervision. NOTE: 1.For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 2.Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be pa id separately.
670SS 300
671SS 400
672EXTRA FOR IBR GRADE STAINLESS STEEL PIPING (GR. SS 300) JOINTS Extra for IBR grade stainless steel piping (GR. SS 300) joints. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose.
67315 mm NB, Schedule upto 40
67415 mm NB, Schedule more than 40 but upto 80
67515 mm NB, Schedule above 80 but upto 120
67620 mm NB, Schedule upto 40
67720 mm NB, Schedule more than 40 but upto 80
67820 mm NB, Schedule above 80 but upto 120
67925 mm NB, Schedule upto 40
68025 mm NB Schedule more than 40 but upto 80
68125 mm NB, Schedule above 80 but upto 120
68240 mm NB, Schedule upto 40
68340 mm NB, Schedule more than 40 but upto 80
68440 mm NB, Schedule above 80 but upto 120
68550 mm NB, Schedule upto 40
68650 mm NB, Schedule more than 40 but upto 80
68750 mm NB, Schedule above 80 but upto 120
68880 mm NB, Schedule upto 40
68980 mm NB, Schedule more than 40 but upto 80
69080 mm NB, Schedule above 80 but upto 120
691100 mm NB, Schedule upto 40
692100 mm NB, Schedule more than 40 but upto 80
693100 mm NB, Schedule above 80 but upto 120
694150 mm NB, Schedule upto 40
695150 mm NB, Schedule more than 40 but upto 80
696150 mm NB, Schedule above 80 but upto 120
697200 mm NB, Schedule upto 40
698200 mm NB, Schedule more than 40 but upto 80
699200 mm NB, Schedule above 80 but upto 120
700250 mm NB, Schedule upto 40
701250 mm NB, Schedule more than 40 but upto 80
702250 mm NB Schedule above 80 but upto 120
703FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC.
704DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC.
705HANDLING / ERECTION OF FABRICATED PIPES / COIL ASSEMBLIES
706BENDING OF PIPES Bending of pipes: the job includes bending of pipes in the required curvature and supply of all tools, tackles, labour, and the supervision to complete the job as per and to the full satisfaction of the Engineer-in-Charge.
70715 mm NB
70820 mm NB
70925 mm NB
71040 mm NB
71150 mm NB
71280 mm NB
713100 mm NB
714150 mm NB
715200 mm NB
716DYE PENETRATION TEST FOR PIPING WORKS Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment’s, labour, for carrying out the work as per specification and direction of engineer -in-charge at all elevations. Test has to be carried out in all metallurgy the test has to carry out on all schedules of pipes.
717For Pipes (Per Inch Dia)
718For Vessels / Tanks (Per Inch)
719RADIOGRAPHY OF PIPING WORKS Performance of radiographic inspection on all type and sizing of piping/ pipe fittings in position at all heights inclusive of providing sources, film, chemicals, and all necessary equipment, consumables etc. complete in all respect as per specification and instruction of the Engineer-in-Charge.
720For Pipes (Per Inch Dia)
721For Vessel/ tanks etc. (Per Inch)
722HYDROTESING OF PIPING WORKS Hydrostatic testing of pipelines at the specified pressure including blinding/deblinding, fabrication and fixing of testing connections, pressure gauge installation. Hose pipe connection and making all other arrangements as required and dewatering, flushing and boxing up after fixing proper gaskets with supply of all labour, tools andtackles, instruments and instruction of the Engineer-in-Charge. The job has to be carried out at all elevations. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
72315 mm
72420 mm
72525 mm
72640 mm
72750 mm
72880 mm
729100 mm
730150 mm
731200 mm
732250 mm
733300 mm
734350 mm
735400 mm
736450 mm
737500 mm
738550 mm
739600 mm
740700 mm
741750 mm
742PNEUMATIC TESTING OF PIPING Pneumatic test of pipe lines surface to identify leaks after cleaning the surface with wire brush, air jet etc. including all connected jobs of blinding, deblinding etc. and all preparatory jobs as required with all tools, tackles, consumables, air compressor, vacuum box and all other as directed by the Engineer-in-Charge. The job has to be executed at all elevations. Note: Unit of measurement \"EA\" is to be read as \" Metre\"
74315 mm
74420 mm
74525 mm
74640 mm
74750 mm
74880 mm
749100 mm
750150 mm
751200 mm
752250 mm
753300 mm
754350 mm
755400 mm
756450 mm
757500 mm
758600 mm
759700 mm
760750 mm
761800 mm
762900 mm
7631050 mm
7641100 mm
7651200 mm
7661300mm
7671400mm
7681500mm
7691600mm
770FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING UPTO 300# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating upto 300#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet including tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge.
77115 mm
77220 mm
77325 mm
77440 mm
77550 mm
77680 mm
777100 mm
778150 mm
779200 mm
780250 mm
781300 mm
782350 mm
783400 mm
784450 mm
785500 mm
786600 mm
787700 mm
788750 mm
789800 mm
790900 mm
7911050 mm
7921100 mm
7931200 mm
7941300mm
7951400mm
7961500mm
7971600mm
798FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING MORE THAN 300# AND UPTO 600# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating more than 300# and upto 600#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet including tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge.
79915 mm
80020 mm
80125 mm
80240 mm
80350 mm
80480 mm
805100 mm
806150 mm
807200 mm
808250 mm
809300 mm
810350 mm
811400 mm
812450 mm
813500 mm
814600 mm
815700 mm
816750 mm
817800 mm
818900 mm
8191050 mm
8201100 mm
8211200 mm
8221300mm
8231400mm
8241500mm
8251600mm
826FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING MORE THAN 600# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating more than 600#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet including tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge.
82715 mm
82820 mm
82925 mm
83040 mm
83150 mm
83280 mm
833100 mm
834150 mm
835200 mm
836250 mm
837300 mm
838350 mm
839400 mm
840450 mm
841500 mm
842600 mm
843700 mm
844750 mm
845800 mm
846900 mm
8471050 mm
8481100 mm
8491200 mm
8501300mm
8511400mm
8521500mm
8531600mm
854EXTRA FOR FIXING / REMOVAL OF RTJ FLANGES / BLIND FLANGES Extra for opening / fixing etc. of RTJ flanges / blind flanges / spool pieces for lapping etc.
85515 mm
85620 mm
85725 mm
85840 mm
85950 mm
86080 mm
861100 mm
862150 mm
863200 mm
864250 mm
865300 mm
866350 mm
867400 mm
868450 mm
869500 mm
870600 mm
871700 mm
872750 mm
873800 mm
874900 mm
8751050 mm
8761100 mm
8771200 mm
8781300mm
8791400mm
8801500mm
8811600mm
882HEAT TREATMENT Heat treatment of shop fabricated for already installed piping / static equipment etc. for joints or other operations wherever required. Heating to be carried out in a furnace or by using an electric resistance or induction heating equipment ensuring uniform temperature attainment at all points of the portion being heat-treated. The portion under heat treatment shall be wrapped suitably under insulation to avoid any harmful temperature gradient. The temperature thus attainted in the portion under heat treatment shall be recorded by means of thermocouples, pyrometer and an automatic temperature recorders suitably calibrated should be employed. The calibration chart of each recorder along with hardness test results shall be submitted to the Engineer-in-Charge for approval. The details of heat treatment such as heating rate, soaking temperature pause period and cooling rate etc. to be carried out as per relevant standards / code as instructed by the Engineer-in-Charge.
883For Pipes (Per Inch Dia)
884For Vessel & Tanks
885FABRICATION OF PLATE FLANGES Fabrication of plate flanges for the given plate and shifting of material for store to work place and fabricating as per drawing and instruction of Engineer-in-Charge.
886Upto size Dia 50 mm
887Above Dia 50 mm and up to Dia 100 mm
888Above Dia 100 mm and up to Dia 200 mm
889Above Dia 200 mm and up to Dia 300 mm
890Above Dia 300 mm and up to Dia 400 mm
891Above Dia 400 mm and up to Dia 500 mm
892Above Dia 500 mm and up to Dia 600 mm
893SUPPORT PAD WELDING OF PIPES The job involves transportation of all items including all types of structures, pipes etc. from owner\"s storage point to work site and / or prefabrication yard and welding including cutting / grinding / edge preparing and required testing to prove soundness of welding with supply of all consumables, manpower, tools as per technical specification and direction and satisfaction of the Engineer-in-Charge.
894For Pipe Dia up to 25mm
895For pipe Dia 40 mm
896For pipe Dia 50 mm
897For pipe Dia 80 mm
898For pipe Dia 100 mm
899For pipe Dia 150 mm
900For pipe Dia 200 mm
901For pipe Dia 250 mm
902For pipe Dia 300 mm
903For pipe Dia 350 mm
904For pipe Dia 400 mm
905For pipe Dia 450 mm
906For pipe Dia 500 mm
907FABRICATION OF STRAINER The job includes fabrication of strainer by cutting, bending, forming of strainer frame and fixing of SS wire mesh by tying, stitching and welding etc. and grinding / smoothening the same, complete in all respect as per specification, drawing and instruction of En gineer-in-Charge.
908FABRICATION OF STRAINER: Dia - 40 mm
909FABRICATION OF STRAINER: Dia - 50 mm
910FABRICATION OF STRAINER: Dia - 80 mm
911FABRICATION OF STRAINER: Dia - 100 mm
912FABRICATION OF STRAINER: Dia - 150 mm
913FABRICATION OF STRAINER: Dia - 200 mm
914FABRICATION OF STRAINER: Dia - 250 mm
915FABRICATION OF STRAINER: Dia - 300 mm
916STRAINER CLEANING The job includes opening of flange joints / cover flange for strainer, removal of filter / strainer from position, cleaning of strainer and its internals and finally boxing up with new gaskets supplied by IOCL and as per the instruction of Engineer-In-Charge. The job also includes hot bolting, area cleaning etc., as per requirement and complete the job in all respects with supply of all tools and tackles, labour and supervision as per instructions of Engineer-in-charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters.
917STRAINER CLEANING Up to Dia 40 mm
918STRAINER CLEANING Above Dia 40 mm and up to to Dia 80 mm
919STRAINER CLEANING Above Dia 80 mm and up to to Dia 150 mm
920STRAINER CLEANING Above Dia 150 mm and up to to Dia 300 mm
921STRAINER CLEANING Above Dia 300 mm and up to to Dia 600 mm
922STRAINER CLEANING Above Dia 600 mm and up to to Dia 900 mm
923STRAINER CLEANING Above Dia 900 mm and up to to Dia 1200 mm
924STRAINER CLEANING Above Dia 1200 mm and up to Dia 1600 mm
925DISMANTLING OF EQUIPMENT (INCLUDING HEAVY EQUIPMENT CHARGES) The job involves removal of existing equipment along with base frame/ support plate, insulation etc. unfastening, dismantling and transporting of all types of equipment from all elevations such as vessels, heat-exchangers, pumps, mixers etc. with all care to avoid any damage to equipment to the scrapyard/ project stores/ main stores/ designated place with all connected structural, various fittings, instruments installed on the equipment. Job also includes supplying of all types of tools, tackles, lifting arrangements, cranes, tractor trolley and equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
926DISMANTLING OF EQUIPMENT (INCLUDING HEAVY EQUIPMENT CHARGES)
927INSTALLATION OF ROTATING EQUIPMENT (PUMP/ MIXER/ COMPRESSOR/ TURBINE ETC.)(INCLUDING HEAVY EQUIPMENT CHARGES) Transportation of rotating equipment with drives (including all types of pumps/ mixers/ compressors/ turbines etc.) and accessories from owner\"s storage points to worksite, assembly of parts/ sub-assemblies, installation of base plates for foundations, placing the equipment on prepared foundations, levelling with machined and tapered metallic wedges and tack welding grouting, carrying out alignment, trial runs and start up runs and providing manpower for testing, rectifying and defect and completion of works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of labour, tools, tackles, lifting arrangements, heavy equipment, machineries all consumables to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
928INSTALLATION OF ROTATING EQUIPMENT (PUMP/ MIXER/ COMPRESSOR/ TURBINE ETC.)(INCLUDING HEAVY EQUIPMENT CHARGES)
929INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS UPTO 5 MT (INCLUDING HEAVY EQUIPMENT CHARGES) Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements,heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
930INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS UPTO 5 MT (INCLUDING HEAVY EQUIPMENT CHARGES)
931INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. UPTO 5 MT (INCLUDING HEAVY EQUIPMENT CHARGES) Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
932INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. UPTO 5 MT (INCLUDING HEAVY EQUIPMENT CHARGES)
933INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 5 MT AND UPTO 10 MT (INCLUDING HEAVY EQUIPMENT CHARGES) Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner,area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
934INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 5 MT AND UPTO 10 MT (INCLUDING HEAVY EQUIPMENT CHARGES)
935INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 5 MT AND UPTO 10 MT(INCLUDING HEAVY E QUIPMENT CHARGES) Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
936INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 5 MT AND UPTO 10 MT(INCLUDING HEAVY E QUIPMENT CHARGES)
937INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 10 MT AND UPTO 20 MT (INCLUDING HEAVY EQUIPMENT CHARGES) Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
938INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 10 MT AND UPTO 20 MT (INCLUDING HEAVY EQUIPMENT CHARGES)
939INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 10 MT AND UPTO 20 MT(INCLUDING HEAVY EQUIPMENT CHARGES) Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
940INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 10 MT AND UPTO 20 MT(INCLUDING HEAVY EQUIPMENT CHARGES)
941DISMANTLING OF EQUIPMENT (EXCLUDING HEAVY EQUIPMENT CHARGES) The job involves removal of existing equipment along with base frame/ support plate, insulation etc. unfastening, dismantling and transporting of all types of equipment from all elevations such as vessels, heat-exchangers, pumps, mixers etc. with all care to avoid any damage to equipment to the scrapyard/ project stores/ main stores/ designated place with all connected structural, various fittings, instruments installed on the equipment.Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate.
942DISMANTLING OF EQUIPMENT (EXCLUDING HEAVY EQUIPMENT CHARGES) The job involves removal of existing equipment along with base frame/ support plate, insulation etc. unfastening, dismantling and transporting of all types of equipment from all elevations such as vessels, heat-exchangers, pumps, mixers etc. with all care to avoid any damage to equipment to the scrapyard/ project stores/ main stores/ designated place with all connected structural, various fittings, instruments installed on the equipment.Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
943INSTALLATION OF ROTATING EQUIPMENT (PUMP/ MIXER/ COMPRESSOR/ TURBINE ETC.) (EXCLUDING HEAVY EQUIPMENT CHARGES) Transportation of rotating equipment with drives (including all types of pumps/ mixers/ compressors/ turbines etc.) and accessories from owner\"s storage points to worksite, assembly of parts/ sub-assemblies, installation of base plates for foundations, placing the equipment on prepared foundations, levelling with machined and tapered metallic wedges and tack welding grouting, carrying out alignment, trial runs and start up runs and providing manpower for testing, rectifying and defect and completion of works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate.
944INSTALLATION OF ROTATING EQUIPMENT (PUMP/ MIXER/ COMPRESSOR/ TURBINE ETC.) (EXCLUDING HEAVY EQUIPMENT CHARGES) Transportation of rotating equipment with drives (including all types of pumps/ mixers/ compressors/ turbines etc.) and accessories from owner\"s storage points to worksite, assembly of parts/ sub-assemblies, installation of base plates for foundations, placing the equipment on prepared foundations, levelling with machined and tapered metallic wedges and tack welding grouting, carrying out alignment, trial runs and start up runs and providing manpower for testing, rectifying and defect and completion of works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
945INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS UPTO 10 MT (EXCLUDING HEAVY EQUIPMENT CHARGES) Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate.
946INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS UPTO 10 MT (EXCLUDING HEAVY EQUIPMENT CHARGES)
947INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. UPTO 10 MT(EXCLUDING HEAVY EQUIPMENT CHARGES) Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate.
948INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. UPTO 10 MT(EXCLUDING HEAVY EQUIPMENT CHARGES)
949INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 10 MT AND UPTO 20 MT (EXCLUDING HEAVY EQUIPMENT CHARGES) Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner,, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate.
950INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 10 MT AND UPTO 20 MT (EXCLUDING HEAVY EQUIPMENT CHARGES)
951INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 10 MT AND UPTO 20 MT(EXCLUDING HEAVY EQUIPMENT CHARGES) Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate.
952INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 10 MT AND UPTO 20 MT(EXCLUDING HEAVY EQUIPMENT CHARGES)
953INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner\"s storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenchesincluding assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gasketsto proper size if required, placing the gaskets / RTJ ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
954For Valves (other than RTJ)
955For RTJ Valves
956REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/MONITORS/ SAFETY VALVES ETC.
957REVISIONING OF BURNER BLOCK INCLUDING AIR REGISTER / DAMPER Removal of auxiliary connections to the burner, dropping of burner block and cleaning for preliminary inspection of burner assembly, revisioning of primary and secondary air registers, straightening of flapper if required and checking free movement of the system, cleaning the burners (oil, gas, pilot burners) by oil, steam etc., greasing and assembling the parts and fixing back to proper places and finally boxing up of total assembly and its auxiliary connections with proper alignment including alignment of burner assembly and other enabling arrangements for the job and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
958Burner block of weight upto 0.50 MT
959Burner block of weight more than 0.50 MT
960REVISIONING OF BURNER ASSEMBLY
961REPLACEMENT OF FURNACE TUBE GUIDES, SLEEVES, CLAMPS ETC.
962REPLACEMENT OF TUBE HANGERS & LOCKING BARS Debolting and removal of existing wall / roof tube hangers / locking bars (including hot job if any) and fixing back the repaired / new hangers in position as per the direction of the Engineer-in-Charge including alignment and replacement of locking pin,and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
963Replacement of tube hangers
964Replacement of locking bars
965REPLACEMENT OF STAINLESS STEEL U-CLAMPS INSIDE HEATERS
966REPLACEMENT OF THERMOCOUPLE
967OPENING AND BOXING UP OF FURNACE HEADER BOX COVERS, FURNACE COVERS ETC. Opening of header box covers by debolting, cleaning of all bends, opening of header plugs / furnace covers etc. and finally boxing up with proper gasket, packing, replacing defective bolt-nuts to ensure zero leak of joints and to facilitate inspection of bends / plugs etc. including minor repair of covers and hinges if any, replacement of defective header plugs, cleaning / lapping of header plugs etc. complete as per the directions and to the entire satisfaction of the Engineer-in-Charge.
968Header Box Cover
969Furnace manway cover/ convection door
970Header Plug
971Explosion door/ hinged stack cover
972DISMANTLING & REFIXING OF DEAERATOR TRAYS OF CO-BOILER
973REPLACEMENT OF DIFFUSER CONE
974SCAPH REVISIONING, CLEANING & TESTING Manual air blowing and cleaning of scaph finned tubes, hydro testing and cleaning of scaph finned bundle and cutting of leaky tubes and plugging, testing and boxing up of manhole as instructed by the Engineer-in-Chargeincluding all labour, tools, tackles, consumables and supervision etc. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
975SCAPH cleaning & testing
976REVISIONING OF SOOT BLOWER (LRSB & ROTARY) Opening of soot blower, removal from its position, lowering, dismantling the complete assembly, minor repairs, replacement jobs of required spare parts, assembling, fixing in position and boxing up complete in all respect with all consumables, tools, manpower as directed by the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
977LRSB
978Rotary
979OPENING & BOXING OF REACTOR, REGENERATOR, ORIFICE CHAMBER MANHOLES IN FCC/RFCC/INDMAX The job involves mobilisation of manpower, tools and tackles to all the necessary technological platforms at all heights, opening of manhole covers using the required tools/ torque wrenches, cleaning of gasket surfaces of manhole flanges and blinds, re-fixing of manhole covers after completion of all activities, including fitting the gaskets/ ceramic tapes/ ceramic ropes, by uniform tightening of cross-wise fashion and final hot bolting of the manholes by application of the specified torques during/ after commissioning of the equipment. This shall also include provision of rope ladders inside the cyclones after opening of manholes for inspection. The entire activity shall be carried out as per the instruction of and to the satisfaction of the engineer-in-charge and in adherence to all safety norms and practices. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
980Dia of manholes upto 20 inches
981Dia of manhole above 20 inches and upto 32 inches
982Dia of manhole above 32 inches and upto 40 inches
983Dia of manhole above 40 inches and upto 80 inches
984Dia of manhole above 80 inches and upto 102 inches
985OPENING AND BOXING OF RISER BOTTOM ASSEMBLY
986OPENING AND BOXING OF DFAH BURNER ASSEMBLY
987MAINTENANCE OF SLIDE VALVES
988MAINTENANCE OF REACTOR
989BLINDING AND DEBLINDING OF VAPOUR LINE Removal of spectacle blind, insertion of blind in the vapours line simultaneously by use of chain pulley blocks and tightening the flange joints, finally deblinding in same manner by removal of blind and insertion of spectacle and boxing up of joints using proper rated gasket / fasteners and hot bolting as per requirement.Total job has to be carried out in the presence of skilled supervisor taking adequate safety precautions includingmaintaining steam purging and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately
990FCC Reactor vapour line (28\")
991FPU-I over head line (42\")
992FPU-II over head line (48\")
993REPLACEMENT OF CI CAPS Removal and lowering of old CI caps, lifting of new / repaired caps in position at an elevation of 75 to 85 metres and fixing the same as per specification, drawing and instruction of the Engineer-in-Charge including all enabling arrangements and miscellaneous welding if any and complete the job in all respect including all labour, tools, tackles, consumables and supervision etc. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately
994DISMANTLING AND ERECTION OF PANEL / ROOF SEGMENTS IN BOILER / FURNACE ETC.
995FABRICATION OF PANEL/ ROOF SEGMENTS IN FURNACE/ BOILERS ETC.
996HEX MESH FIXING IN FCCU (ON NEW SURFACE)
997HEX MESH REMOVAL & REFIXING IN FCCU (ON OLD SURFACE)
998HEX MESH REMOVAL AND REFIXING IN REACTOR & RISER Operation of winch for jhula movement inside the Riser, removal of damaged hex mesh along with castable material from position by cutting, cleaning of old surface by chipping, grinding etc.Removal of coke / carbon deposited on surface by any means, transportation of new hex mesh from owner’s store to place of work inside Reactor, Riser etc., cutting the new hex mesh to the required size, forming in the correct shape fixing on old surface in position, tack welding, inspecting through Inspection and welding in position by approved welder using company’s approved procedure (UOP standard specification 3-25) with weld length (19mm + 19mm) in each pocket as per direction of Engineer-in-charge.Supply of all labour, tools and tackles, consumables etc. will be in contractor scope including removal of scrap and area cleaning. Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
999ECONOMISER, APH HOPPER, FD FAN DUCT, ID FAN SUCTION HOOD CLEANING
1000STEAM DRUM CLEANING Opening of manhole of steam drum, fixing and removal of owner supplied wooden plugs in riser tube opening and providing pre-fabricated dummy plugs on downcomers, removal of its machinery/internals, manual cleaning with wire brush and fixing back machinery/internals and the manhole with proper rated gasket after cleaning of gasket faces as per the instructions of the Engineer-in-charge. Supply of all labour, tool and tackles, consumables etc. will be in the scope of contractor.
1001Boiler capacity upto 20 tonnes
1002Boiler capacity more than 40 tonnes but upto 80 tonnes
1003Boiler capacity more than 20 tonnes but upto 40 tonnes
1004Boiler capacity above 80 tonnes
1005MUD DRUM CLEANING Opening of manhole of mud drum, removal of its machinery/ internals, manual cleaning with wire brush and fixing back machinery/ internals and the manhole with proper rated gasket after cleaning of gasket faces as per the instructions of the Engineer-in-charge. Supply of all labour, tool and tackles, consumables etc. will be in the scope of contractor.
1006Boiler capacity upto 20 tonnes
1007Boiler capacity more than 40 tonnes but upto 80 tonnes
1008Boiler capacity more than 20 tonnes but upto 40 tonnes
1009Boiler capacity above 80 tonnes
1010REPAIR OF GAMA PLUG (IBR)
1011MANHOLE OPENING AND CLOSING OF HRSG
1012CLEANING OF OLD CONVOLUTION OF EXPANSION JOINT OF FCC/RFCC/INDMAX
1013VBU FURNACE PLUG REMOVAL
1014REPLACEMENT OF CO-BOILER TUBE
1015SULPHUR BOOT / PLUG VALVE CLEANING Cleaning of sulphur boot by flame heating, poking and manual cleaning with wire brush, heating and making free the seized plug valve as per the instructions of Engineer-in-charge.Supply of labour, including the cutting and welding wherever reqd. consumables, tools and tackles etc. will be in contractor\"s scope including scrap removal and area cleaning.
1016Sulphur boot
1017Plug valve
1018BBU REACTOR DISTRIBUTER PIPE CLEANING
1019DECHOKING OF CW LINE / PRODUCT LINE Dechoking of CW line/product line by poking rod inside or any other means. This includes opening/ removal of spool piece of piping to be dechoked, removal of sludge/ hard deposits etc. by poking rod/ dechoking by steam or any other means and fixing / erecting the line in position after dechoking,including cutting and fixing suitable size as per instructions of Engineer-in-charge including supply of all labour, tools and tackles, machinery etc. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1020Dia up to 1 inch
1021Dia 1½\"
1022Dia 2\"
1023Dia 4\"
1024Dia 6\"
1025Dia 8\"
1026FLAME HEATING BRG, HUB AND FURNACE PLUG ETC.
1027DEMISTER PAD REPLACEMENTS Removal of existing demister pad with frame after debolting / cold/ hot cutting, insertion and fixing of new demister pad with frame as per instruction of the Engineer-in-Charge. This job includes transportation of new pad to the work site, depositing the old pad at owner\"s storage point, minor hot job if any for replacement as per site conditions, enabling necessary arrangements and complete job in all respect as per instruction of Engineer-in-charge including supply of all tools and tackles, machinery, labour, consumables etc.
1028Demister size upto 1m dia
1029Demister size above 1m and up to 2mdia
1030Demister size above 2m and up to 3mdia
1031Demister size above 3m and up to 4mdia
1032Demister size above 4m dia
1033REVISIONING OF DAMPER PLATE
1034REVISIONING OF EXPLOSION DOOR
1035REVISIONING OF PEEP HOLES
1036FABRICATION OF DEMISTER PAD
1037HOSE CONNECTION AND DISCONNECTION JOB Hose connection and disconnection job involves transportation of hoses from the owner\"s storage to worksite, opening the roll and laying the hose, cutting if required, joining them properly, connection of ends to specified locations/ equipment/ supply points as per Production requirement, tying the hose wherever required, opening of end connections and removal of hose after job completion, rolling the same and shifting to scrap yard/ storage point as per direction of EIC. The job also covers lowering, lifting, handling of hoses, area preparation, area cleaning and compliance to all safety norms and work permit systems. Note: The rates shall be applicable for working and connection at all elevation. The hoses, clamps and bolts shall be supplied by IOCL free of charge. This item shall be operative only if hose connection/ disconnection is required by Production/ Maintenance and is not related to execution of other item. Only hose connection or dis-connection shall be treated as half activity. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1038WATER WASHING OF FURNACE (CONVECTION ZONE) Water washing of convection zone studded tubes by using water jet with caustic solution after completely covering all other zones by means of tarpauline and by providing proper drainage so as to avoid any damage to the refractory and to guide the water outside and offering for inspection at two stages i.e. just after provision of tarpauline, hose pipes, consumables, tools and tackles, etc. and removal of the covers after cleaning job is over and to the complete satisfaction of the engineer-in-charge (tarpauline will be supplied by IOCL as free issue material. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1039Approx. area of convection section 25 M X 1.8 M.
1040Approx. area of convection section 20 M X 1.8 M.
1041Approx. area of convection section 15 M X 1.0 M.
1042Approx. area of convection section 5 M X 2 M.
1043HYDRO-TESTING OF HYDRO-CARBON & SUPER HEATER COILS Job involves making all necessary arrangements for hydro-test of one complete pass/ loop of hydrocarbon coil, super heater coil etc. including blinding and de-blinding of the flanged joints connected with the respective passes, connection of water hose, testing pump etc. pressurising the system as per the direction of engineer-in-charge and offering for inspection (IBR/ Non-IBR). Job also includes all auxiliary arrangements, depressurisation/ draining of system after hydro-test and complete job in all respect as per instruction of Engineer-in-charge including supply of all tools and tackles, machinery, labour, consumables etc. Note: 1. In case of any leakage observed during hydrotest rehydrotesting shall be carried out after completion of repair job etc. at no extra cost. 2. The necessary co-ordination with IBR authorities is under owner\"s scope. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1044Upto the length of 20 M.
1045Upto the length of 10 M.
1046Upto the length of 7 M.
1047STACK DAMPER SHUT OFF BLADE REVISIONING
1048VAPOUR LINE BLINDING AND DEBLINDING
1049CLEANING/ REPLACEMENT OF FILTER
1050OVERHAULING AND REVISIONING OF AGITATOR The job includes decoupling, dismantling, opening, internal inspection, replacement / rectification, boxing up, installation at base, coupling etc. for agitators, e.g., caustic, sulphuric acid, hydrogen peroxide, alum, dope, urea, nutrient, dolomite soda ash etc. of all sizes. All tools, tackles, advanced tools, manpower and other resources to execute the job are in the scope of the vendor. After completion of work the area is to be cleaned and scrap materials are to be removed to scrapyard as per direction and entire satisfaction of the Engineer-in-charge. Note: Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1051APH GATE OPENING AND CLOSING The job includes opening of APH gate of ID fan, FD fan, furnace, reformer etc. APH gate is of any type and size. The job is to be carried out at any location and height / elevation. Cleaning is to be carried out and APH gate is to be boxed-up with new gasket, if required. The rate is for both opening and boxing-up. All tools, tackles, advanced tools, manpower and other resources to execute the job are in the scope of the vendor. After completion of work the area is to be cleaned and scrap materials are to be removed to scrapyard as per direction and entire satisfaction of the Engineer-in-charge. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1052HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 151 TO 300 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1053Blinding and Deblinding, Fixing, Dismantling of Piping
1054Blinding and deblinding, in case of RTJ Flange
1055Channel box opening & box-up (only in case of bundle pulling out)
1056Bundle pulling and insertion
1057Bundle cleaning from inside, outside & shell cleaning
1058Ring test
1059Floating head test
1060Cover test
1061Individual tube testing
1062HEAT EXCHANGER REVISIONING / TESTING (SINGLE UNIT HAVING 301 to 600 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1063Blinding and deblinding,fixing, dismantling of piping
1064Blinding and deblinding, in case of RTJ Flange
1065Channel box opening & box-up (only in case of bundle pulling out)
1066Bundle pulling and insertion
1067Bundle cleaning from inside, outside & shell cleaning
1068Ring test
1069Floating head test
1070Cover test
1071Individual tube testing
1072HEAT EXCHANGER REVISIONING/ TESTING (SINGLE UNIT HAVING601 TO 900 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1073Blinding and deblinding,fixing, dismantling of piping
1074Blinding and deblinding, in case of RTJ Flange
1075Channel box opening & box-up (only in case of bundle pulling out)
1076Bundle pulling and insertion
1077Bundle cleaning from inside, outside & shell cleaning
1078Ring test
1079Floating head test
1080Cover test
1081Individual tube testing
1082DECHOKING OF HEAT EXCHANGER TUBES Dechoking of Heat exchanger tubes by poking rod inside tube and removing hard deposits and complete the job in all respectas per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.
1083Dia above 10 mm and up to Dia 15 mm tubes
1084Dia above 15 mm and up to Dia 20 mm tubes
1085Dia above 20 mm and up to Dia 25 mm tubes
1086Dia above 25 mm and up to Dia 40 mm tubes
1087Dia above 40 mm and up to Dia 50 mm tubes
1088AIR COOLER / INTER COOLER / AFTER COOLER REVISIONING AND TESTING Blinding-deblinding, inlet/ outlet piping spool removal and refixing, cover opening, cleaning and boxing up on both sides, individual tube testing and plugging, hydraulic cover testing by opening of flanges, inside tube cleaning as per instructions of Engineer-in-charge including all labour, tools and tackles, consumables, supervision etc., scrap removal and complete area cleaning.. In case any repeat test or any single test among the above is required to be done, the payment will be made as below. Note: Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.
1089Blinding and deblinding
1090Cover opening
1091Tube cleaning of bundle
1092Tube Bundle testing and plugging
1093Cover box-up & testing
1094AIR COOLER / INTER COOLER / AFTER COOLER REVISIONING AND TESTING (MORE THAN 100 TUBES) Blinding-deblinding, inlet/ outlet piping spool removal & refixing, cover opening, cleaning and boxing up on both sides, indiv idual tube testing and plugging, hydraulic cover testing by opening of flanges, inside tube cleaning as per instructions of Engineer-in-charge including all labour, tools and tackles, consumables, supervision etc., scrap removal and complete area cleaning.. In case any repeat test or any single test among the above is required to be done, the payment will be made as below. Note: Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.
1095Blinding and deblinding
1096Cover opening
1097Tube cleaning of bundle
1098Tube Bundle testing and plugging
1099Cover box-up & testing
1100SALVAGING OF TUBESHEETS AND BAFFLES Job includes area preparation for hot job, taking hot permit, (if required) etc. gas cutting of tubes, or pull out the tubes using pullers at the predetermined places, without damaging the tube sheets, baffle plates or tie rods etc. removing tubes from tube sheet and baffle plates, depositing and stacking the same at the area earmarked, cleaning the area including supply of all tools tackles, consumables, labours and contractor\"s supervision as directed by the Engineer-in-Charge.
1101For Tubesheets (each hole of tubesheet)
1102For Baffles (each hole of baffle)
1103RETUBING AND EXPANDING Job includes getting all materials issued from owner’s storage point, shifting it to work site, unloading, stacking, handling and positioning, of tube sheets as per dimensions given in the drawing, holding with the help of required fixtures, clamps etc. placement of tie rod plates, baffle plates, maintain their verticality and distance as per drawings, inserting of tubes, expanding both the ends of each tube to the extent as specified by inspection authority, facilitating stage inspection by inspection authority and carry out necessary rectification as recommended including rectifying roll leak during testing including supply of tools, tackles, including tube expander, drive, etc. consumables and contractor\"s supervision as directed by the Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1104RETUBING AND EXPANDING
1105HYDROBLAST CLEANING OF EQUIPMENT WITH CONTRACTOR\"S MACHINE Cleaning of heat exchanger/ air fin cooler tube bundle. Supply on hire hydrodynamic water jet equipment / machine, electrical/ driven having adequate jet pressure inclusive ofspin jet and all other required nozzles, pumps, drives, lancers, hoses, complete with its accessories, operating crew, labour and cleaning heat exchanger tubes from inside as per direction of the Engineer-in-Charge on round the clock basis. The rate should be inclusive of F/H cover, shell cover, channel box and channel box cover cleaning and accessories of that specific heat exchanger (in position cleaning/ bundle in pulled out condition) the motor of hydrojetting M/c should be flame proof. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1106For tubes having less than or equal to 6m length (in position)
1107For tubes having length more than 6m and upto 9m (in position)
1108For tubes having less than or equal to 6m length (bundle pulled out condition)
1109For tubes having length more than 6m and upto 9m(bundle pulled out condition)
1110HYDROBLAST CLEANING OF EQUIPMENT WITH OWNER\"S MACHINE Operation and running maintenance of owner\"s hydro jetting pump, power lance and / or flex lance to clean the inside of tubes of tube bundle in position / bundle pulled out condition, in which all the fast wearing parts of power lance / flex lance like nozzles, packings, bushing, etc. shall be provided by contractor and any other spares parts like lances, waterscrew shall be provided by owner (IOCL). Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1111For tubes having less than or equal to 6m length (in position)
1112For tubes having length more than 6m and upto 9m (in position)
1113For tubes having less than or equal to 6m length (bundle pulled out condition)
1114For tubes having length more than 6m and upto 9m(bundle pulled out condition)
1115HEAT EXCHANGER REVISIONING/ TESTING (SINGLE UNIT HAVING UPTO 150 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1116Blinding and deblinding,fixing, dismantling of piping.
1117Blinding and deblinding, in case of RTJ Flange.
1118Channel box opening & box-up (only in case of bundle pulling out).
1119Bundle pulling and insertion.
1120Bundle cleaning from inside, outside & shell cleaning.
1121Ring test.
1122Floating head test.
1123Cover test.
1124Individual tube testing.
1125HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 901 TO 1200 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1126Blinding and deblinding,fixing, dismantling of piping.
1127Blinding and deblinding, in case of RTJ Flange.
1128Channel box opening & box-up (only in case of bundle pulling out).
1129Bundle pulling and insertion.
1130Bundle cleaning from inside, outside & shell cleaning.
1131Ring test.
1132Floating head test.
1133Cover test.
1134Individual tube testing.
1135HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 1201 TO 1500 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1136Blinding and deblinding,fixing, dismantling of piping.
1137Blinding and deblinding, in case of RTJ Flange.
1138Channel box opening & box-up (only in case of bundle pulling out).
1139Bundle pulling and insertion.
1140Bundle cleaning from inside, outside & shell cleaning.
1141Ring Test.
1142Floating Head Test.
1143Cover Test.
1144Individual Tube Testing.
1145HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 1501 TO 1800 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1146Blinding and deblinding,fixing, dismantling of piping.
1147Blinding and deblinding, in case of RTJ Flange.
1148Channel box opening & box-up (only in case of bundle pulling out).
1149Bundle pulling and insertion.
1150Bundle cleaning from inside, outside & shell cleaning.
1151Ring Test.
1152Floating Head Test.
1153Cover Test.
1154Individual Tube Testing.
1155HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 1801 TO 2400 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1156Blinding and deblinding,fixing, dismantling of piping.
1157Blinding and deblinding, in case of RTJ Flange.
1158Channel box opening & box-up (only in case of bundle pulling out).
1159Bundle pulling and insertion.
1160Bundle cleaning from inside, outside & shell cleaning.
1161Ring Test.
1162Floating Head Test.
1163Cover Test.
1164Individual Tube Testing.
1165HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 2401 TO 3000 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1166Blinding and deblinding, fixing, dismantling of piping
1167Blinding and deblinding, in case of RTJ Flange.
1168Channel box opening & box-up (only in case of bundle pulling out).
1169Bundle Pulling and Insertion.
1170Bundle cleaning from inside, outside & shell cleaning.
1171Ring Test.
1172Floating Head Test.
1173Cover Test.
1174Repeated Ring Test.
1175Individual Tube Testing.
1176HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 3001 TO 4200 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1177Blinding and deblinding,fixing, dismantling of piping.
1178Blinding and deblinding, in case of RTJ Flange.
1179Channel box opening & box-up (only in case of bundle pulling out).
1180Bundle pulling and insertion.
1181Bundle cleaning from inside, outside & shell cleaning.
1182Ring Test.
1183Floating Head Test.
1184Cover Test.
1185Repeated Ring Test.
1186Individual Tube Testing.
1187HEAT EXCHANGER REVISIONING / TESTING(SINGLE UNIT HAVING 4200 TO 6000 TUBES) Ring Test, Floating Head Test, Cover Test, manual / steam cleaning of tube bundles from inside and outside as well as cleaning of shell and covers, blinding and deblinding, dismantling of pipes, shell cover opening & refixing, floating head cover opening & refixing, channel box opening and refixing (only in case of bundle pulling out), pulling and insertion of bundles as required as per instructions of Engineer-in-Charge, supply of all tools and tackles, labour, consumables, supervision etc. will be in the scope of contractor including scrap removal and area cleaning, cleaning of all covers and plug the leaky tubes, hot bolting as required if any and cutting of gaskets from sheet and offer for inspection as directed by Engineer-in-Charge. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1188Blinding and deblinding,fixing, dismantling of piping.
1189Blinding and deblinding, in case of RTJ Flange.
1190Channel box opening & box-up (only in case of bundle pulling out).
1191Bundle Pulling and Insertion.
1192Bundle cleaning from inside, outside & shell cleaning.
1193Ring Test.
1194Floating Head Test.
1195Cover Test.
1196Repeated Ring Test.
1197Individual Tube Testing.
1198LOWERING DOWN and RAISING OF TUBE BUNDLE/ SHELL COVER/ CHANNEL BOX/ FLOATING HEAD ETC. The job includes lowering down of tube bundle/ shell/ floating head/ shell cover/ channel box etc. from the Technological platform (at any level) to the ground floor for necessary maintenance job and raising up of above items to the position after completion of maintenance job, with all labours, tools and tackles, lifting arrangement etc. as per direction and entire satisfaction of the engineer-in-charge. Note: Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.
1199FOAM CLEANING OF EXTERIOR FIN FAN COOLER The job includes to and fro transportation of free issue material from owners storage point to work site, area cleaning, scrap removal to be done daily during job execution or after job completion as per the direction of engineer-in-charge.Cutting of gasket from sheet supplied by IOCL (if required), Opening and closing of all threaded capping, connection/ disconnection of steam, air, water, hoses etc., Arrange foam generator, foaming chemicals and give necessary water connections, Make necessary arrangements for collection and disposal of effluent, protection of fan and motor etc., Carryout foam cleaning of the fins of the cooler, Offer the cooler for inspection and obtain approval from Inspection/ Maintenance/ Process/ Operations Engineer, Dispose of the effluent at a designated location inside the refinery as advised by engineer-in-charge, Carryout housekeeping of the siteParty has to give guarantee of temperature gain by minimum 10° Celsius, Use Anemometer to find air flow velocity before and after completion of foam cleaning process. Note: Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1200Foam Cleaning of Cooler
1201Mobilization charges (Per Visit).
1202SEAL WELDING OF EXCHANGER TUBE This includes Cleaning of Tube Sheet surface, Seal Welding by using TIG. Transportation of materials from owner\"s storage points to work site, grinding, edge preparation, welding using approved welding electrodes as per owners quality requirements as per the instructions of the Engineer-in-Charge to his entire satisfaction including supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects in a workman like manner including area preparation for hot jobs, provision of air hose, area cleaning after completion of work, flushing wherever required, cleaning off all foreign materials etc. Proper safety arrangements for carrying out the job is under contractor\"s scope and the same has to be complied with as per the directions of the Engineer- in-Charge
1203SEAL WELDING OF EXCHANGER TUBE - 20 MM
1204SEAL WELDING OF EXCHANGER TUBE - 25 MM
1205WELD DEPOSIT ON PITTED SURFACE Grinding / cleaning of pitted / corroded area and filling the pitted surface by weld deposit and grinding / smoothening the surface as required and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.
1206CS weld deposit for vessel / heat exchanger / column etc. (upto 2.5mm depth)
1207SS weld deposit (upto 2.5mm depth)
1208Inconel weld deposit (upto 2.5mm depth)
1209WELDING OF CS PLATES Transportation of all items including plates etc. from owner\"s storage point to work site and / or prefabrication yard and welding of CS plates including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all respect as per direction of the Engineer-in-Charge. Note: Heat treatment and other NDT charges shall be paid extra.
1210Upto 3mm thick
1211Above 3mm & upto 5mm thick.
1212Above 5mm & upto 6mm thick
1213Above 6mm & upto 7mm thick
1214Above 7mm & upto 9mm thick.
1215Above 9mm & upto 11mm thick
1216Above 11mm & upto 12.7mm thick
1217Above 12.7mm & upto 15mm thick
1218Above 15mm & upto 16mm thick.
1219Above 16mm & upto 18 mm thick.
1220Above 18mm & upto 20mm thick.
1221Above 20 mm thick.
1222WELDING OF SS / AS PLATES Transportation of all items including plates etc. from owner\"s storage point to work site and / or prefabrication yard and welding of SS / AS plates / structural etc. including cutting / grinding / edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools & tackles, supervision as per technical specifications, drawings and complete the job in all respect as per direction of the Engineer-in-Charge. Note: Heat treatment and other NDT charges shall be paid extra.
1223Upto 3 mm thick alloy steel (P5)
1224Above 3 mm & upto 5 mm thick alloy steel (P5)
1225Upto 3 mm thick stainless steel (SS 300)
1226Above 3 mm & upto 5 mm thick stainless steel (SS 300)
1227Above 5 mm & upto 6 mm thick stainless steel (SS 300)
1228Above6 mm & upto 7 mm thick stainless steel (SS 300)
1229Above 7 mm & upto 9 mm thick stainless steel (SS 300)
1230Above 9 mm & upto 11 mm thick stainless steel (SS 300)
1231Above 11 mm & upto 12.7 mm thick stainless steel (SS 300)
1232Above 12.7 mm & upto 15 mm thick stainless steel (SS 300)
1233Upto 3 mm thick stainless steel (SS 400)
1234Above 3 mm & upto 5 mm thick stainless steel (SS 400)
1235Above 5 mm & upto 6 mm thick stainless steel (SS 400)
1236Above6 mm & upto 7 mm thick stainless steel (SS 400)
1237Above7 mm & upto 9 mm thick stainless steel (SS 400)
1238Above9 mm & upto 11 mm thick stainless steel (SS 400)
1239Above11 mm & upto 12.7 mm thick stainless steel (SS 400)
1240Above 12.7 mm & upto 15 mm thick stainless steel (SS 400)
1241CS / AS PLATE CUTTING Transportation of material from owner\"s storage point to work site, cutting of CS / AS plate by Gas/ grinding or any other means and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.
12423mm thick
12435mm thick
12446mm thick
12458mm thick
124610mm thick
124712mm thick
124816 mm thick
124918 mm thick.
125020 mm thick.
1251SS PLATE CUTTING Transportation of material from owner\"s storage point to work site, Cutting of SS plate by grinding or any other means and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.
12523mm thick
12535mm thick
12546mm thick
12558mm thick
125610mm thick
125712mm thick
125814 mm thick
1259FABRICATION / FIXING OF LUGS Transportation of fabricated clamp from store / stacking place to place of work, installation of clamp over leaky pipe including rubber pad and tightening will be done as per instruction of the Engineer-in-Charge. Supply of labour, consumables, tools and tackles, supervision etc. will be in the scope of contractor including scrap removal and area cleaning.
1260CS Lugs
1261SS Lugs
1262CS Lugs
1263SS Lugs
1264COLD CUTTING OF BOLTS Cutting of bolts in position with hacksaw by cold cutting because of seized condition of bolts and nuts that can not be opened by ordinary means, as per instructions of the Engineer-in-Charge. Supply of consumables, labour, tools and tackles, equipment, supervision, area cleaning etc. will be in contractor\"s scope.
1265Up to 12mm Dia Bolts
1266Above 12mm & up to 16mm Dia Bolts
1267Above 16mm & up to 20mm Dia Bolts
1268Above 20mm & up to 24mm Dia Bolts
1269Above 24mm & up to 30mm Dia Bolts
1270Above 30mm & up to 32mm Dia Bolts
1271Above 32mm & up to 36mm Dia Bolts
1272Above 36mm & up to 42mm Dia Bolts
1273GAS CUTTING OF BOLTS Cutting of CS / AS Bolts in position by means of gas cutting and complete the job in all respect as per instructions of the Engineer -in-Charge including supply of tools and tackles, labour, consumables, equipment, supervision, area cleaning, cut edge smoothening by grinding etc.
1274Up to M-12mm Bolts
1275Above M-12mm up to M-16mm Bolts
1276Above M-16mm up to M-20mm Bolts
1277Above M-20mm up to M-24mm Bolts
1278Above M-24mm up to M-30mm Bolts
1279Above M-30mm up to M-32mm Bolts
1280Above M-32mm up to M-36mm Bolts
1281Above M-36mm up to M-42mm Bolts
1282HOT BOLTING OF FLANGE JOINT (RAISED FACE) UPTO RATING 300# Tightening of flange joints as well as heat exchanger joints in hot condition to arrest leak during operation as per instruction and guidance of the Engineer-in-Charge including all labour, consumables, tools and tackles, equipment etc. complete for rating upto 300#.
128315 mm
128420 mm
128525 mm
128640 mm
128750 mm
128880 mm
1289100 mm
1290150 mm
1291200 mm
1292250 mm
1293300 mm
1294350 mm
1295400 mm
1296450 mm
1297500 mm
1298600 mm
1299700 mm
1300900 mm
13011050 mm
13021100 mm
13031200 mm
1304HOT BOLTING OF FLANGE JOINT (RAISED FACE) RATING MORE THAN 300# BUT UPTO 600# Tightening of flange joints as well as heat exchanger joints in hot condition to arrest leak during operation as per instruction and guidance of the Engineer-in-Charge including all labour, consumables, tools and tackles, equipment etc. complete for rating more than 300# but upto 600#.
130515 mm
130620 mm
130725 mm
130840 mm
130950 mm
131080 mm
1311100 mm
1312150 mm
1313200 mm
1314250 mm
1315300 mm
1316350 mm
1317400 mm
1318450 mm
1319500 mm
1320600 mm
1321700 mm
1322750 mm
1323800 mm
1324900 mm
13251050 mm
13261100 mm
13271200 mm
1328HOT BOLTING OF FLANGE JOINT(RAISED FACE) RATING MORE THAN 600# Tightening of flange joints as well as heat exchanger joints in hot condition to arrest leak during operation as per instruction and guidance of the Engineer-in-Charge including all labour, consumables, tools and tackles, equipment etc. complete for rating more than 600#.
132915 mm
133020 mm
133125 mm
133240 mm
133350 mm
133480 mm
1335100 mm
1336150 mm
1337200 mm
1338250 mm
1339300 mm
1340350 mm
1341400 mm
1342450 mm
1343500 mm
1344600 mm
1345700 mm
1346750 mm
1347800 mm
1348900 mm
13491050 mm
13501100 mm
13511200 mm
1352HOT BOLTING OF RTJ FLANGE JOINT RATING UPTO 300# Tightening of RTJ joints in hot condition to arrest leak during operation as per instruction and guidance of the Engineer-in-Charge including all labour, consumables, tools and tackles, equipment etc. complete for rating upto 300#.
135315 mm
135420 mm
135525 mm
135640 mm
135750 mm
135880 mm
1359100 mm
1360150 mm
1361200 mm
1362250 mm
1363300 mm
1364350 mm
1365400 mm
1366450 mm
1367500 mm
1368600 mm
1369700 mm
1370750 mm
1371800 mm
1372900 mm
13731050 mm
13741100 mm
13751200 mm
1376HOT BOLTING OF RTJ JOINT RATING MORE THAN 300# BUT UPTO 600# Tightening of RTJ joints in hot condition to arrest leak during operation as per instruction and guidance of the Engineer-in-Charge including all labour, consumables, tools and tackles, equipment etc. complete for rating more than 300# but upto 600#.
137715 mm
137820 mm
137925 mm
138040 mm
138150 mm
138280 mm
1383100 mm
1384150 mm
1385200 mm
1386250 mm
1387300 mm
1388350 mm
1389400 mm
1390HOT BOLTING OF RTJ JOINT RATING MORE THAN 600# Tightening of RTJ joints in hot condition to arrest leak during operation as per instruction and guidance of the Engineer-in-Charge including all labour, consumables, tools and tackles, equipment etc. complete for rating more than 600#.
139115 mm
139220 mm
139325 mm
139440 mm
139550 mm
139680 mm
1397100 mm
1398150 mm
1399200 mm
1400250 mm
1401300 mm
1402350 mm
1403400 mm
1404BUFFING OF WELD JOINTS Job involves buffing and cleaning of total weld area of the vessel / column etc. using power brush. The job has to be completed in all respect to the entire satisfaction of the Engineer-in-Charge including all labour, tools, tackles, consumables and supervision etc. (each length of buffing will be up to width of 150 mm).
1405CLEANING OF INTERNAL BORE OF PIPELINES Opening end fittings, jump bends, applying external heating, internal pressures (pneumatic/steam hydraulic), poker rods, hammering, jet blasting etc. for cleaning bore of jammed pipelines with out removing from the site and boxing up the end fittings with new gaskets and complete the job in all respectas per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.
140615 mm
140720 mm
140825 mm
140940 mm
141050 mm
141180 mm
1412100 mm
1413150 mm
1414200 mm
1415250 mm
1416300 mm
1417CUTTING VARIOUS SIZES OF GASKETS Job involves trasportation of gasket sheets from stores/ storage location to gasket cutting die machine/ work site, cut the required quantities of gaskets with quality finish cut , and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.
1418100 mm
1419150 mm
1420200 mm
1421250 mm
1422300 mm
1423350 mm
1424400 mm
1425450 mm
1426500 mm
1427600 mm
1428700 mm
1429750 mm
1430REPAIRS BY FILLET WELDING BY ELECTRODE Welding of pipe, plates with electrode for carrying out special repair job at any elevation in reactor, regenerator, orifice chamber which includes grinding, edge preparation, pre / post heating, of the job and welding by electrode in the form of fillet welding to complete the job in all respects, with all labour, tools, tackles, consumables will be in the scope of contractor including scrap removal and area cleaning and shifting to scrap yard / stores. Note: CS Plate rate for per meter is considered and divided by 3 to get rate for one run. AS Plate rate for per meter is considered and divided by 3 to get rate for one run. (Rate of P5 Plate) SS Plate rate for per meter is considered and divided by 3 to get rate for one run (Rate of 300 series) Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.
1431CS, upto 3 mm thickness
1432CS, above 3 mm & upto 5 mm thickness
1433CS, above 5 mm & upto 6 mm thickness
1434CS, above 6 mm & upto 7 mm thickness
1435CS, above 7 mm & upto 9 mm thickness
1436CS, above 9 mm & upto 11 mm thickness
1437CS, above 11 mm & upto 12.7 mm thickness
1438CS, above 20 mm
1439AS, upto 3 mm thickness (Rate of P1 plate)
1440AS, above 3 mm & upto 5 mm thickness
1441AS, above 5 mm & upto 6 mm thickness
1442AS, upto 3mm thickness (Rate of P22 Plate)
1443AS, Above 3 mm thickness &upto 5 mm thickness.
1444AS, Above 5 mm & upto 6 mm thickness.
1445AS, upto 3 mm thickness (Rate of P5 Plate).
1446AS, Above 3 mm & upto 5 mm thickness.
1447AS, Above 5 mm & upto 6 mm thickness.
1448AS, upto 3 mm thickness (Rate of P9 Plate).
1449AS, Above 3 mm & upto 5 mm thickness.
1450AS, Above 5 mm & upto 6 mm thickness.
1451SS, upto 3 mm thickness (SS 300 series)
1452SS, above 3 mm & upto 5 mm thickness
1453SS, above 5 mm & upto 6 mm thickness
1454SS, Upto 3 mm thickness (Rate of SS 400 Series).
1455SS, Above 3 mm & upto 5 mm thickness.
1456SS, Above 5 mm & upto 6 mm thickness.
1457SS, Above 6 mm & upto 7 mm thickness.
1458SS, Above 7 mm & upto 9 mm thickness.
1459SS, Above 9 mm & upto 11 mm thickness.
1460SS, Above 11 mm & upto 12.7 mm thickness.
1461SS, Above 12.7 mm & upto 15 mm thickness.
1462REPLACEMENT OF GASKETS Job involves opening of all types of flanged joints, valve bonnet etc. by debolting, cold or gas cutting of fasteners, cleaning of flange face revisioning/ replacement of fasteners, providing proper rating of gaskets, and boxing up of flange joint. This also includes necessary capping / decamping of threaded joints, area cleaning, hot bolting etc. torque wrench if required shall be arranged by IOCL on returnable basis. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.
1463Up to 25 mm
1464Above 25 mm to 80 mm
1465Above 80 mm to 200 mm
1466Above 200 mm to 350 mm
1467Above 350 mm to 450 mm
1468Above 450 mm to 600 mm
1469Above 600 mm to 800 mm
1470FABRICATION & FIXING OF FABRIC BELLOW The job involves removal of old fabric bellow from the expansion joint, cleaning of the bellow and fixing of new fabric bellow in position as per instruction of Engineer-in-charge including tools and tackles and all manpower. Supply of new fabric bellow shall be in the scope of IOCL. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.
1471TESTING & PLUGGING OF TUBES IN GLASS TUBE APH Testing for leak and plugging of tubes in Glass Tube APH using teflon plugs and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.Plugs shall be provided by IOCL.
1472INCONEL FILLET WELDING Transportation of all materials from owner\"s storage point to work site and / or prefabrication yard and welding of CS/AS/SS/dissimilar material etc. including inconel pipe/ pipe fittings/ tubes/ plates/ structural etc. including cutting / grinding / cleaning/ edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools as per technical specification and direction of the Engineer-in-Charge. (Heat treatment and other NDT charges shall be paid extra).
1473Up to 4 mm fillet thickness
1474Above 4 to 6 mm fillet thickness
1475Above 6 to 10 mm fillet thickness
1476INCONEL BUTT WELDING Transportation of all materials from owner\"s storage point to work site and / or prefabrication yard and welding of CS/AS/SS/dissimilar material etc. including inconel pipe/ pipe fittings/ tubes/ plates/ structural etc. including cutting / grinding / cleaning/ edge preparing and required testing to prove soundness of weld joint with supply of all consumables, manpower, tools as per technical specification and direction of the Engineer-in-Charge. (Heat treatment and other NDT charges shall be paid extra).
1477Up to 4 mm thickness
1478Above 4 to 6 mm thickness
1479Above 6 mm to 10 mm thickness
1480OPENING AND BOXING UP OF MANHOLES The job involves opening of cover, man holes, by opening of bolts and nuts, cold/hot cutting of corroded fasteners, boxing up by using new and proper rating gasket after cleaning of gasket faces and complete the job in all respectas per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.
1481Dia 8\" to 12\"
1482Dia 12\" to 18\"
1483Dia 18\" to 24\"
1484Dia 24\" to 30\"
1485Dia above 30\"
1486STRIP LININGOF COLUMN, VESSEL The job includes removal of old strips and getting the material issued transportation to work and handling at site, fabrication of strips by cutting, drilling or by any other means to required sizes and bending to proper shape to suit the curvature of the vessel / column, edge preparation etc. cleaning and surface preparation of the shell, grinding weld build up on the pitted area, fixing and welding of the strips, D.P. testing of all weld joints and pneumatic testing of strips into segment of bridges (25mm x 10mm) at a pressure of 0.2 kg / sq. cm. the job includes all consumables and to be completed in all respect ready for commissioning as directed by Engineer-in-Charge. The length of the strip selected in the range of 600 to 1500 mm and width of 150 mm or less to suit the contour requirement. 10-mm drill holes to be made at a gap of 150 mm on the centreline of each strip which are to be plug welded. Three bead fillet butt method to be used for strip lining. Lining materials will be of 2 to 3 mm thick. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1487S.S. Lining
1488Monel lining
1489REMOVAL/ INSTALLATION OF TRAYS/ PACKING RINGS/ STRUCTURED PACKING The job includes getting the materials issued from stores, transportation to work site, mock up assembly and marking of individual elements at site, removal of tray deck plates, down comer, seal pan, packing rings etc. by debolting, cutting or by any other means without damaging the unit, lowering down them to ground and handling, placing, aligning and fixing with proper gaskets of all components of trays, down comer, seal pan, packing rings etc. with all consumables, tools, manpower to the entire satisfaction of Engineer-in-Charge.
1490Removal of Packing Rings/ Rachig Rings
1491Removal of Trays/ Down comer/ Structured packing
1492Installation of Trays /Down comer/ Structured packing
1493Installation of Packing Rings/ Rachig Rings
1494MAINTENANCE OF VESSEL/ COLUMN The job includes blinding/ de-blinding, hose connections for steaming, water flushing, air flushing, and entry permit of vessel, opening of manholes, hand holes, vent etc., thorough cleaning of internal surface and fittings, removal and refitting of components, strainers after cleaning. Removal, reloading/ replacement of activated charcoal, raching rings etc. including transportation of material and disposal of the refusal and minor repairs like weld build up of the scarred portion/ pitted area wherever required etc. gasket cutting at the required sizes from gasket sheet and replacing the same including cleaning of joint surface. Final blinding / de-blinding, boxing up and other necessary piping connections, hydraulic testing, hot bolting of all joints during hot circulation as per requirement and as instructed by Engineer-in-Charge (area of shell internal surface and trays/ baffles top and bottom to be measured separately). Note: Tray and packing related jobs shall be paid extra. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1495STEEL SCAFFLODING (MATERIALS IN CONTRACTOR\"S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the areas specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding material including supply of all tools, tackles, consumables, labours and contractor\"s supervision as directed by the Engineer-in-Charge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs
1496Upto 6 M
1497Above 6 m upto 10 m
1498Above 10 m upto 20 m
1499Above 20 m upto 30 m
1500Above 30 m upto 40 m
1501Above 40 m upto 50 m
1502Above 50 m upto 90 m
1503Intermediate plate form
1504Volumetric (For inside Furnace/ Vessels etc.) (For volumetric scaffolding beyond 10 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 10 meters.)
1505This is shutdown factor which shall be paid @25% of executed value of IOCL Common SOR items
1506PART-B EMERGENCY/ UNPLANNED/ M&I SD JOBS
1507EMERGENCY/ UNPLANNED/ M&I SHUT DOWN JOBS
1508Hiring of 15 Metric Tonne or above Hydra crane Tyre mounted.Job involves hiring of 15 Metric Tonne or above hydra crane for round the clock working hours. The UOM \"EA\" denotes charges for each shift of12 hours per Hydra. As per site requirement Round \"o\" clock duty may be required as per direction of E-I-C.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1509Hiring of Tyre Mounted 45 Metric Tonne Crane or AboveJob involves hiring of Tyre Mounted 45 Metric Tonne crane for round the clock working.The crane shall be tyre mounted, telescopic extendable boom, mobile crane having minimum 45 Metric Tonne capacity at its minimum boom length.The UOM \"EA\" denotes charges for each shift of 12 hours per crane. As per site requirement Round \"o\" clock duty may be required as per direction of E-I-C.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1510Contractor must put steel plates of sufficient thickness below all out-rigger arms irrespective of capacity of crane.Mobilization and Demobilization charges for crane mentioned in SOR are inclusive of mobilization and demobilization of plates for outrigger arms, counter weights, Fly Jibs (Extendable Boom), etc.1 UOM \"EA\" denotes charges for Mobilization/demobilization of 45 Metric Tonne crane each way.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1511Hiring of Tractor & Trailor (Open long Trailor) of minimum capacity to carry 20MT Weight.Job involves hiring of Tractor & Trailor (Open long Trailor) with minimum capacity to carry 20MT for transporation of materials as directed by EIC.The UOM \"EA\" denotes charges for each shift of 12hrs per Tractor & trailor inclusive of mobilization and demobilization. As per site requirement Round o clock duty may be required as per direction of E-I-C.Note :- Tractor & trailor is considered as one unit.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1512Hiring of Tractor & Trailor (Open long Trailor) of minimum capacity to carry 40MT Weight.Job involves hiring of Tractor & Trailor (Open long Trailor) with minimum capacity to carry 40MT for transporation of materials as directed by EIC.The UOM \"EA\" denotes charges for each shift of 12hrs per Tractor & trailor inclusive of mobilization and demobilization. As per site requirement Round o clock duty may be required as per direction of E-I-C.Note :- Tractor & trailor is considered as one unit.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1513MOBILISATION AND DEMOBILISATION OF HYDRAULIC TUBE BUNDLE PULLER FOR HEAT EXCHANGERs ( 9 METER LENGTH , 30 MT CAPACITY AND 40 MT PULLING CAPACITY).The UOM \"EA\" denotes charges for Mobilization/ Demobilization of tube bundle puller each way.
1514The job includes the mobilisation/demobilisation of hydrauilic tube bundle puller with all accessories ,hoses , hydraulic oil etc. from contractor\"s site to IOCL Gujarat refinery site and again from IOCL Gujarat refinery site to contractor\"s site . Contractor has to mobilise the equipment at site as per the required date in case of early mobilisation of the equipment at site the charges shall not be paid by IOCL . IOCL shall not be accountable in case of any damage occured during tranportation, handling , loading and unloading . IOCL will provide crane &manpower for loading and unloading the equipment at site with free of costbut loading and unloading shall be executed by the contractor at Gujarat Refinery. Separate charges like insurance, any taxes required for mobilisation and demobilisation shall not be paid by IOCL.The unit \"EA\" denotes Mobilization/ Demobilization of tube bundle puller each way.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1515SUPPLYING OF HYDRAULIC TUBE BUNDLEPULLER FOR REMOVAL OF HEAT EXCHANGER TUBE BUNDLES DURING SHUT DOWN (9 METER LENGTH, 30 MT CAPACITY, 40 MT PULLING CAPACITY, MAXIMUM TUBE BUNDLE DIAMETER- 2000 mm)
1516The job includes supplying of hydraulic tube bundle puller 9 meter length 30 MT capacity and pulling capacity 40 MT in operational condition. In case of any out of order condition while working the charges will not be paid on that outage duration. The required consumables, oil etc. will be in contractor\"s scope. The job shall be done as per thedirection and instruction of engineer in charge.Unit of measurement EA denotes charges per day.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1517DAILY CHARGES OF OPERATOR ON 12 HOUR SHIFT.The unit \"EA\" denotes charges for 12 hour shift of per operator.
1518The job includes operation of the Tube bundle puller as and when required by the engineer-in-charge at site. The timing shall be 8 AM to 8 PM day shift and night shift will be 8 PM to 8 AM . The job may be required to carry out during night shift also if required.The measurement shall be considered on shift basis only . The operation job shall be executed with full satisfaction and instruction of engineer in charge.The unit \"EA\" denotes charges for per shift of 12hrs per operator.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1519Hiring of Torque tools: Job involves supply of torque tool along with operator and all the accessories to operate the tool. All the tools tackles and consumables required for the job is in the scope of agency only. Torque Tools are to be operated in 12 hrs shifts round the clock basis, with seperate operator in each shift of the day.
1520Hiring of torque tool as per the specification below. Stud size 30 mm to 60 mm. Torque Range: 700 ft-lb to 7000 ft-lb.Unit of measurement is 12 hrs shift .The unit of measurement \"EA\" denotes \"Hiring charges per machine per 12 Hours shift\".Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1521Hiring of torque tool as per the specification below. Hiring charges of torque tool (1 no.) (2-1/2\" sq-drive - 35000 Nm) with operator for 12 hrs shift. Stud size 36 mm to 90 mm.Unit of measurement is 12 hrs shift. The unit of measurement \"EA\" denotes \"Hiring charges of torques tool with operator per machine per 12 Hours shift\"Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1522Hiring of Tyre Mounted 100 Metric Tonne or above Crane Job involves hiring of Tyre Mounted 100 Metric Tonne crane with operator for round the clock working.The crane shall be tyre mounted, telescopic extendable boom, mobile crane having minimum 100 Metric Tonne capacity at its minimum boom length and having minimum 50M Telescopic Boom Length.The unit \"EA\" denotes each shift of 12 hours per crane with operator. As per site requirement Round o clock duty may be required as per direction of E-I-C.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1523Contractor must put steel plates of sufficient thickness below all out-rigger arms irrespective of capacity of crane.Mobilization and Demobilization charges for crane mentioned in SOR are inclusive of mobilization and demobilization of plates for outrigger arms, counter weights, Fly Jibs (Extendable Boom), etc.Unit of measurement \"EA\" denotes Mobilization/demobilization of 100 Metric Tonne crane each way.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1524Hiring of Tyre Mounted 180 Metric Tonne crane or aboveJob involves hiring 180 Metric Ton crane with operator for round the clock working.The crane shall be tyre mounted, telescopic extendable boom, mobile crane having minimum 180 Metric Tonne capacity at its minimum boom length and having minimum 60 M telescopic boom length.The unit \"EA\" denotes each shift of 12 hours per crane with operator . As per site requirement Round o clock duty may be required as per direction of E-I-C.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1525Contractor must put steel plates of sufficient thickness below all out-rigger arms irrespective of capacity of crane.Mobilization and Demobilization charges for crane mentioned in SOR are inclusive of mobilization and demobilization of plates for outrigger arms, counter weights, Fly Jibs (Extendable Boom), etc.Unit of measurement \"EA\" denotes Mobilization/demobilization of 180 Metric Tonne crane each way.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1526Job involves hiring of Hydraulic flange spreader-10T capacity one set 2 nos flange spreader included in hydraulic hand operated pump 700 bar capacity ,operator , connecting flexible hose. tip clearance 4MM Max spread 70 MM on round the clock basis .The unit of measurement \"EA\" denotes charges for each shift of12 hour. Job shall be completed as per instruction and to the complete satisfaction of E-I-C. Air ,water and electricity if required shall be in scope of IOCL.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1527Hiring of Fork Lift having fork assembly of 3 Metric Tonne CapacityJob involves hiring of Fork lift having fork assembly of 3 Metric Tonne Capacity for round the clock working.The unit of measurement \"EA\" denotes deployment of one no. of forklift for one shift of 12 hours. Forklift is to be deputed as per site requirement on round the clock basis as per instructions and to the full satisfaction of EIC.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1528OPENING, REVISIONING AND TESTING OF PLUG TYPE AIR FIN COOLERS:The following activties shall be part of scope of work for opening, revisioing & testing of plug type air fin coolers; 1. Opening of individual plugs partially or fully to access the tubes as per instruction & direction of EIC. This shall be carried out by mechnical means like impact wrench with sockets. Inno case, the head of the plug shall be damaged. If by chance, during course of opening of plug, the head of plug got broken, then alternative arrangement for taking out the subject plug by mean of drilling, tapping, gas cutting & welding has to be done by contractor as per direction & instruction of E-I-C. 2. Cleaning of plug threads, cheasing of threads and replacement of gaskets shall be done by contractor. 3. Refixing of individual plugs in air fin coolers. 4. Carrying out hydrotesting of air fin cooler at designated pressure. 5. Taking care of any leaking plug by tightening or replacement of gaskets/plugs. In case, the plug is still leaking, even after tightening, the seal welding shall be carried out as per direction & instruction of E-I-C. 6. In case a leak is observed in any tube the same shall be identified and plugged as per instruction & direction of EIC.Apart from above, all labour, tools & tackles, consumables and equipment etc., scrap removal and area cleaning complete shall be carried out by contractor as per instruction & direction of EIC.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1529Maint. of Plug Type Air Fin Coolers:Job includes opening of plugs without damaging the tread. If required, flame heating around the plugs to be done for ease in opening, with permission of EIC. Job also includes boxup of plugs with application of anti seize compound (Anti seize compound to be provided by IOCL) & final tightening of all the plugs at suitable torque value decided by EIC. The job also includes Hydrotesting of AFC Bundles & final box up of flanges.The unit of measurement \"EA\" denotes charges per one no of threaded plug of Air fin cooler bundleNote :- Hydro-Jet Cleaning of Tubes will be paid seperately under SOR item CME10011XX.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1530Brazing job: Repair job brazing of brass tubebundles/baffle plate/ tube sheet or any other brazing work required for job.
1531PAUT/TOFD:The PAUT/TOFD shall be done on piping and equipment of carbon steel, alloy steel and Austenitic stainless steel of any grade and thickness ranging from 6mm to 55mm.1.0 OTHER TERMS & CONDITIONS 1.1,,Contractor shall submit brief Approach Paper indicating technique/procedure and nature of Instruments to be used, before the mobilization. Capabilities of applied methods and Instruments in detecting thickness loss shall be demonstrated by the agency before commencement of the job. 1.2,,Calibration of the ultrasonic instrument/ probes and the verification of the test procedure to attain desired sensitivity shall be done at site, before starting the job as per the instructions of E.I.C. 1.3,,In case of any loss of time due to rain/unforeseen circumstances, which cannot be influenced by IOCL, no compensation will be paid for such hours/days lost. 1.4,,The job shall be done by ASNT/ISNT Level-III certified personnel having experience in above mentioned NDT\"s OR ASNT/ISNT Level-II certified personnel having experience in above mentioned NDT\"s under the close supervision of ASNT/ISNT Level-III certified personnel having experience in above mentioned NDT\"s. 1.5,,Copy of qualification and experience certificates of ASNT/ ISNT Level-III and level-II qualified technician/ inspector those will be deputed on the job shall be furnished at the time of commencement of job. 1.6,,The test result interpretation shall be done by ASNT/ISNT Level-III certified personnel having experience in PAUT/TOFD. 1.7,,Agency shall do all Computer analysis and provide the report. 1.8,,Relevant documents for qualification of personnel to be submitted prior to the job for IOCL acceptance. 1.9,,All equipment, tools / consumables (like cotton waste, grease etc) for all testing\"s shall be in the contractor\"s scope.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1532Charges for PAUT/TOFD of welds for 12 working hrs. for one team.It includes charges for procedure preparation & qualification, PAUT examination including charges for 2 Level-II technicians for examination & one Level-III certified personnel at site for certification and interpretation during testing.The Unit of measurement \"EA\" denotes Charges for PAUT/TOFD of welds for one team (including instruments, equipment, tools / consumables) working for 12 hrs.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1533The Unit of measurement \"EA\" denotes charges for mobilization & de-mobilization of one inspection team including all equipment and accessories for PAUT/TOFD of welds.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1534SS CUTTING BY PLASMA CUTTING MACHINE, The SOR Rates for stainless steel plate cutting are inclusive of plate/shell cutting of any vessel, column, reactor or any other equipment.Plasma Machine is in contractor\"s scope of supply
1535SS CUTTING BY PLASMA CUTTING MACHINE, The SOR Rates for stainless steel plate cutting are inclusive of plate / shell cutting of any vessel, column, reactor or any other equipment.Plasma Machine is in contractor\"s scope of supplyUnit of measuurement \"M\" means per Meter cutting charges of plate/shell having thickness of less than or equal to 03 MM.
1536SS CUTTING BY PLASMA CUTTING MACHINE, The SOR Rates for stainless steel plate cutting are inclusive of plate/shell cutting of any vessel, column, reactor or any other equipment.Plasma Machine is in contractor\"s scope of supplyUnit of measuurement \"M\" means per Meter cutting charges of plate/shell having thickness of more than 03 MM and less than or equal to 06 MM.
1537SS CUTTING BY PLASMA CUTTING MACHINE, The SOR Rates for stainless steel plate cutting are inclusive of plate/shell cutting of any vessel, column, reactor or any other equipment.Plasma Machine is in contractor\"s scope of supplyUnit of measuurement \"M\" means per Meter cutting charges of plate/shell having thickness of more than 06 MM and less than or equal to 10 MM.
1538SS CUTTING BY PLASMA CUTTING MACHINE, The SOR Rates for stainless steel plate cutting are inclusive of plate/shell cutting of any vessel, column, reactor or any other equipment.Plasma Machine is in contractor\"s scope of supplyUnit of measuurement \"M\" means per Meter cutting charges of plate/shell having thickness from 11MM to 14MM.
1539SS CUTTING BY PLASMA CUTTING MACHINE, The SOR Rates for stainless steel plate cutting are inclusive of plate/shell cutting of any vessel, column, reactor or any other equipment.Plasma Machine is in contractor\"s scope of supplyUnit of measuurement \"M\" means per Meter cutting charges of plate/shell having thickness from 15MM to 20MM.
1540SS CUTTING BY PLASMA CUTTING MACHINE, The SOR Rates for stainless steel plate cutting are inclusive of plate/shell cutting of any vessel, column, reactor or any other equipment.Plasma Machine is in contractor\"s scope of supplyUnit of measuurement \"M\" means per Meter cutting charges of plate/shell having thickness from 21MM to 30MM.
1541Grinding / Cleaning on Pitted / corroded area and filling the pitted surface by Monel weld deposit and grinding / smoothening the surface as required and directed by the engineer in charge.Monel Weld Deposit (upto 2.5 MM depth).Unit \"M2\" means Monel weld deposit in 1 M2 area (upto 2.5 MM depth) as per detailed scope of work given above, in SCC-T and anywhere else in tender documents.
1542Hiring of Tyre Mounted 300 Metric Tonne crane or aboveJob involves hiring 300 Metric Tonne crane or above with operator for round the clock working.The crane shall be tyre mounted, telescopic extendable boom, mobile crane \"preferrably rough terrain crane\" having minimum 300 Metric Tonne capacity at its minimum boom length and having minimum 75M telescopic boom length.The unit \"EA\" denotes charges for each day ( i.e, both Day shift and Night shift of 12 hrs each) per crane with operator . As per site requirement Round o clock duty may be required as per direction of E-I-C.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1543Contractor must put steel plates of sufficient thickness below all out-rigger arms irrespective of capacity of crane.Mobilization and Demobilization charges for crane mentioned in SOR are inclusive of mobilization and demobilization of plates for outrigger arms, counter weights, Fly Jibs (Extendable Boom), etc.Unit of measurement \"EA\" denotes charges for Mobilization/demobilization of 300 Metric Tonne crane or above each way.Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1544Hot Job Gang :-1 Hot Job Gang shall consist of mimimum manpower as following :-a) 01 nos. welder. b) 01 nos. Fitter. c) 01 nos. grinder. d) 01 nos. gas cutter. e) 02 nos. rigger. f) 02 nos. helper.75% of the total measurement of executed hot jobs by this group shall be paid in SOR items.(Eg. If total 10inch dia welding done then the amount payable against respective SOR items will be for 7.5inch dia along with the hot job gang rates)This group shall be deployed as per the direction & sole discretion of E-I-CThe unit SOR rates \"LS\" are for 01 no. hot job gang per 12Hrs shift.
1545Cold Job Gang for jobs for emergency/ exigency/ expediting / assistance during revamp shutting down/ start-Up commissioning activities as per instruction of E-I-C. Contractor cannot claim this item for other jobs without consent of E-I-C.1 Cold job gang shall consist of mimimum manpower as following :-a) 02 nos. rigger. b) 05 nos. helper.This group shall be deployed as per the direction & sole discretion of E-I-CThe unit SOR rates \"LS\" are for 01 no. cold job gang per 12Hrs shift.
1546Hiring Charges for low weight low noise high speed Pneumatic Impact Wrench with all size sockets, deep sockets, Hoses & accessories, etc.:-The charges considered in the SOR are for supply of low weight low noise high speed Pneumatic Impact Wrench with all size sockets & deep sockets, Hoses & accessories, etc. required at site for fast (speedy) & safe opening of stud & nuts to complete the job in all repsect.Job includes de-torquing of fasteners, nuts, etc. and speedly opening of complete nut from stud or bolt during flage or equipment opening and tightening of complete nut on stud or bolt druing flage or equipment boxing-up.The charges considered in the SOR are for per pneumatic impact Wrench with all sockets required at site per working shift.Unit of measurement \"Day\" = 1 Working shift of 12 Hrs. per machine.Note-1: The pneumatic impact wrenches should be capable of de-torquing of fasteners, nut, etc.Note-2: Tools/ Equipments shall not be chargeable during Idle Shift.UOM \"Day\" denotes hiring charges for low weight, low noise, high speed Pneumatic impact wrenches with all size sockets & deep sockets, Hoses & accessories, etc. for fast (speedy) & safe opening of stud & nuts to complete the job in all repsect. Job includes de-torquing of fasteners, nuts, etc. and speedly opening of complete nut from stud or bolt during flage or equipment opening and tightening of complete nut on stud or bolt druing flage or equipment boxing-up as described in detail SOR line item and SCC-T.Stud or bolt Size :up to M16 (Including M16)Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1547UOM \"Day\" denotes hiring charges for low weight, low noise, high speed Pneumatic impact wrenches with all size sockets & deep sockets, Hoses & accessories, etc. for fast (speedy) & safe opening of stud & nuts to complete the job in all repsect. Job includes de-torquing of fasteners, nuts, etc. and speedly opening of complete nut from stud or bolt during flage or equipment opening and tightening of complete nut on stud or bolt druing flage or equipment boxing-up as described in detail SOR line item and SCC-T.Stud or bolt Size : > M16 up to M20 (Excluding M30 and Including M42)Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1548UOM \"Day\" denotes hiring charges for low weight, low noise, high speed Pneumatic impact wrenches with all size sockets & deep sockets, Hoses & accessories, etc. for fast (speedy) & safe opening of stud & nuts to complete the job in all repsect. Job includes de-torquing of fasteners, nuts, etc. and speedly opening of complete nut from stud or bolt during flage or equipment opening and tightening of complete nut on stud or bolt druing flage or equipment boxing-up as described in detail SOR line item and SCC-T.Stud or bolt Size : > M20 and up to M30 (Excluding M20 and Including M30)Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor
1549UOM \"Day\" denotes hiring charges for low weight, low noise, high speed Pneumatic impact wrenches with all size sockets & deep sockets, Hoses & accessories, etc. for fast (speedy) & safe opening of stud & nuts to complete the job in all repsect. Job includes de-torquing of fasteners, nuts, etc. and speedly opening of complete nut from stud or bolt during flage or equipment opening and tightening of complete nut on stud or bolt druing flage or equipment boxing-up as described in detail SOR line item and SCC-T.Stud or bolt Size : > M30 and up to M42 (Excluding M30 and Including M42)Detailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1550Hiring Charges-Operator & crew:-UOM \"DAY\" denotes Charges for Operator and entire crew per working shift of 12 hrs for installation & operation of one pneumatic impact wrench.Unit 1 Day = 1 Working shift of 12 Hrs. for operator and entire crewDetailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1551Hiring Charges-Supervisor:-UOM \"DAY\" denotes Charges for supervisory services per shift of 12 hrs for managing & supervisoing the complete site for operation of pneumatic impact wrench.Unit 1 Day = 1 Working shift of 12 Hrs. per supervisorDetailed scope of work & supply of contractor is mentioned in Special Conditions of Contract - Technical. Any other work and/or supply not mentioned in owner\"s / IOCL\"s scope required for the completion of job in all respects to the full satisfaction of engineer-in-charge is in the scope of contractor.
1552INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 20 MT AND UPTO 30 MT(INCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of Static Equipment such as HE/Coolers/condensers etc. of weight more than 20MT to 30MT.Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications.Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1553INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 30 MT AND UPTO 40 MT(INCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of Static Equipment such as HE/Coolers/condensers etc. of weight more than 30MT upto 40MT.Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications.Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1554INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 20 MT AND UPTO 30 MT (INCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of VESSELS/ COLUMNS/ DRUMS/ FILTERS of weight more than 20MT and upto 30MT.Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cl eaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in- Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1555INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 30 MT AND UPTO 40 MT (INCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of VESSELS/ COLUMNS/ DRUMS/ FILTERS of weight more than 30MT and upto 40MT.Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area c leaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in- Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
1556INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 20 MT AND UPTO 30 MT(EXCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of Static Equipment such as HE/Coolers/condensers etc. of weight more than 20MT to 30MT.Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications.Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.Requirement of heavy equipment to be envisaged by Engineer-in- Charge and to be arranged separately, if required, as the same in not included in the item rate.
1557INSTALLATION OF STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS/ COOLERS/ CONDENSERS ETC. MORE THAN 30 MT AND UPTO 40 MT(EXCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of Static Equipment such as HE/Coolers/condensers etc. of weight more than 30MT to 40MT.Transportation of the exchangers from owner\"s storage point to worksite erection at various elevations on foundation/ supporting structure, levelling, aligning, grouting, fixing of foundation bolts, stacking of multitier exchangers (which are stored in unstack condition), flushing, testing, draining by compressed air and completing the work in all respect including earthing protection by way of fixing earthing strips and electrodes, anodes as per specifications.Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.Requirement of heavy equipment to be envisaged by Engineer-in- Charge and to be arranged separately, if required, as the same in not included in the item rate.
1558INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 20 MT AND UPTO 30 MT (EXCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of VESSELS/ COLUMNS/ DRUMS/ FILTERS of weight more than 20MT and upto 30MT.Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.Requirement of heavy equipment to be envisaged by Engineer-in- Charge and to be arranged separately, if required, as the same in not included in the item rate.
1559INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 30 MT AND UPTO 40 MT (EXCLUDING HEAVY EQUIPMENT CHARGES)UOM \"TO\" denotes per tonne charges for Installaion of VESSELS/ COLUMNS/ DRUMS/ FILTERS of weight more than 30MT and upto 40MT.Transportation of vessel/ columns/ filters/ drums etc. from owner\"s storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge.Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.Requirement of heavy equipment to be envisaged by Engineer-in- Charge and to be arranged separately, if required, as the same in not included in the item rate.
1560REPLACEMENT OF METALLIC BELLOW
1561INSTALLATION OF CLAMSHELL BELLOW IN RFCC

AI Tender Summary

OUR REF NO 32657773
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 4.47 Crore
LAST DATE 21-06-2022
Authority
Authority Name Indian Oil Corporation Limited
Work Description Rate Contract For Composite Shutdown Contract At Bongaigaon Refinery
Basic Detail
Tender No BN22VK088
Bidding Type Tender
Location
City dhaligaon
State Assam
Key Dates
Publish Date 14 Jun 2022
Submission Date 21 Jun 2022
Open Date 22 Jun 2022
Finance
Tender Value 4.47 Crore
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
05732366-52fd-43a6-b619-d89a11518902.html
Bidders_Help_Document_for.pdf
BoQ2_BN22VK088.rar
BOQ_162586.xls
FAQs-IOCL-Online-EMD.pdf
GCC.pdf
RAR.rar
Special_Instructions_to_t.pdf
Tender-Acceptance-Format.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 14, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 21, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 22, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

05732366-52fd-43a6-b619-d89a11518902.html

pdf

Bidders_Help_Document_for.pdf

rar

BoQ2_BN22VK088.rar

xls

BOQ_162586.xls

pdf

FAQs-IOCL-Online-EMD.pdf

pdf

GCC.pdf

rar

RAR.rar

pdf

Special_Instructions_to_t.pdf

pdf

Tender-Acceptance-Format.pdf

pdf

Tendernotice_1.pdf