| 1 | Supply ,transportation ,installation, testing andCommissioning of 200KVA Step-down transformer 11/0.440 KV) Level -2fitted withSilica Gel Breather,oil filled and tested,complete in all respectsas per latest specifications and drawing adopted/approved by the department. |
| 2 | Supply ,transportation ,installation, testing andCommissioning of 100KVA Step-down transformer 11/0.440 KV) Level -2fitted withSilica Gel Breather,oil filled and tested,complete in all respectsas per latest specifications and drawing adopted/approved by the department. |
| 3 | ,installation, testing andCommissioning of100KVA Step-down transformerSpared from Tabailbal Sultanpora |
| 4 | Earthing of Sub-Station-Excavation of earth Pit f 650 mm dia.& depth 3000 mm,Installation of earthing Pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 m long as per IS-1239.GI Strip for neutral earthing of size 25mmX 3mm for connection of X-mer body ,G.O Set & LAas per IS-629/85,GI Nuts and Bolts refilled with earth enhancement materials & earth Chamber made of Brick massonary with RCC Slab Cover. |
| 5 | Providing ,transportation ,installation, testing andCommissioning ofGI Channel Cross arms (100X50X50X6 mm) and (75X40X40X6 mm),transformer Belting, Clamps etc. fabricated out of Galvanised steel of different sizesto be fixed with GI Nuts and boltsand washers.(as per the latest specification and drawing approved by the department). |
| 6 | Providing and installation, & Fixing of 11 KV G.OSwitch 3Ph ,3-Pole of Capacity 200 A (Verticaltype ) with arrangements forpad locks and operating rod.The operating rod should be G.I Pipe (B Class) of 25 mm dia of requisite length. |
| 7 | Providing ,and Installation ofgapless Surge Arrestor,9kV,10kV,LA with (Polymer ) housing ,Station Type. |
| 8 | Providing andinstallation of 11 kV Horn,Gap Fuse 3-Phase 100 A. |
| 9 | Providing,and fixing of un -armoured PVC Cable 300 mmSq.IncludingAl. Thimbles and SL Clamps |
| 10 | Providing,and fixing of un -armoured PVC Cable 185 mmSq.IncludingAl. Thimbles and SL Clamps |
| 11 | LT Distribution box for 100 kVA DTR with MCCB for incommer and SFU\"S for outgoingcircuit. |
| 12 | LT Fuse Set |
| 13 | Providing & fixing of11 kV Polymeric composite Disc insulator 12 kV,minimum failing load of 45 kN,lighting impulseof 75 kV positive & 80 kV negative and with creepage distance of 320 mm. |
| 14 | Providing, ,transportation ,installation, testing andCommissioning of ST Poles 9 Mtr long (410-SP-33) including excavation of pit and back filling soil & consolidating each deposit layer of by ramming and watering etc. (as per the latest specification and drawing approved by the department). |
| 15 | Providing, ,transportation ,installation, testing andCommissioning of ST Poles 8 Mtr long(410-SP-15) including excavation of pit and back filling soil & consolidating each deposit layer of by ramming and watering etc. (as per the latest specification and drawing approved by the department). |
| 16 | G.I Barbed wire for Anti Climbing devices withClamps asper REC Standard. |
| 17 | Danger Plates with Clamps |
| 18 | Providing ,transportation ,installation, testing andCommissioning of V -Shaped GI Cross Arms (75X40X6 mm) with top Bracketincluding Clamps, GI Nuts and Bolts. |
| 19 | Providing,transportation andfixing of 11 KV Pin insulators with G.I Pins (as per the latest specification and drawing approved by the department). |
| 20 | Providing,transportation and fixing ofGI Clamps withLTShackle insulators including nuts and bolts.(GI Back Clamps to be fixed with out drilling/punching of poles). |
| 21 | Providing and Laying, stringing of overhead 0.05 ACSR conductor (Rabbit) on cross arms through insulators including binding and twisting with soft aluminium wire both side of insulator complete in all respects (as per the latest specification and drawing approved by the department). |
| 22 | Providingand fixingof HT pole Earthing Complete by GI Rod 20mm 2.5 mtr long through GI Strip |
| 23 | Providingand fixingofLT poleGI spiral earthing 125 SWGComplete (as per latest specifications and drawing adopted /approved by thedepartment. |
| 24 | Painting of pole with onecoat of Red-Oxide and Two coats of Aluminium paint (including cost of paint) |
| 25 | Supply and laying of Cement Bottoming 1:2:4 mix as per REC standards 0.5 cum/poleincluding muffing 20 cm above ground level plaster and curingfor 9Mtr ST poles respectively (theleftover pitafter concreting to be filled with soil and boulders). |
| 26 | Supply and laying of Cement Bottoming 1:2:4 mix as per REC standards 0 .45 cum/poleincluding muffing 20 cm above ground level plaster and curingfor 8Mtr ST poles respectively (theleftover pitafter concreting to be filled with soil and boulders). |