Lp / 010 / 110 ( P ) / 21-22 Indigenisation Of Vacuum Adapter Fuel Vapour Purge System-P8i , Development Cost ( Do Not Put Total Value Of Development Costin Sl.No 1 And Give Break Down Value From Sl 1.01 To 1.11 Below For Dev.Cost ) . Sl No.1 Intention
Tender Overview
Project Description
Lp / 010 / 110 ( P ) / 21-22 Indigenisation Of Vacuum Adapter Fuel Vapour Purge System-P8i , Development Cost ( Do Not Put Total Value Of Development Costin Sl.No 1 And Give Break Down Value From Sl 1.01 To 1.11 Below For Dev.Cost ) . Sl No.1 Intentionally Left Blank ) , Formulation Of Material Specifications , Development Of Engineering Drawing Cost , Cost Of Tooling / Dies / Fixtures , Material Procurement Cost , Manufacturing Cost Including Labour , Rework / Scrap Coverage , Cost Of Testing Charges ( As Applicable ) , Packing, Forwarding And Transportation Charges , Overhead Expenditures , Profit Margin , Any Other Factor ( Please Specify ) , Post Development Cost ( Sl No.2 Intentionally Left Blank And Give Breakdown Values From Sl.No 2.01 To 2.07 For Sl.No.2 ) , Material Cost , Manufacturing Cost , Cost Of Testing Charges ( As Applicable ) , Packing, Forwarding And Transportation Charges , Overhead Expenditure , Profit Margin , Any Other Factor ( Please Specify )
BOQ
| Sl. No. | Item Description |
| 1 | Development Cost (DO NOT PUT TOTAL VALUE OF DEVELOPMENT COSTIN SL.NO 1 AND GIVE BREAK DOWN VALUE FROM SL 1.01 TO 1.11 BELOW FOR DEV.COST). SL NO.1 INTENTIONALLY LEFT BLANK) |
| 2 | Formulation of material specifications |
| 3 | Development of Engineering drawing cost |
| 4 | Cost of tooling / dies / fixtures |
| 5 | Material procurement cost |
| 6 | Manufacturing cost including labour |
| 7 | Rework/scrap coverage |
| 8 | Cost of testing Charges (as applicable) |
| 9 | Packing, forwarding and transportation charges |
| 10 | Overhead expenditures |
| 11 | Profit margin |
| 12 | Any other factor (Please specify) |
| 13 | Post Development cost (SL NO.2 INTENTIONALLY LEFT BLANK AND GIVE BREAKDOWN VALUES FROM SL.NO 2.01 TO 2.07 FOR SL.NO.2) |
| 14 | Material cost |
| 15 | Manufacturing cost |
| 16 | Cost of testing Charges (as applicable) |
| 17 | Packing, forwarding and transportation charges |
| 18 | Overhead expenditure |
| 19 | Profit margin |
| 20 | Any other factor (Please specify) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender