Tender For Supply Of Equipment / Material , Design, Erection, Testing & Commissioning For Sop To T / Well Thathi Baroon ( C / O 15 No. T / Well ) By Prov. 11 / .4 Kv 100 Kva S / Stn. A / W 11 Kv Ht Section Indpur Under Esd Indo
Tender Overview
Project Description
Tender For Supply Of Equipment / Material , Design, Erection, Testing & Commissioning For Sop To T / Well Thathi Baroon ( C / O 15 No. T / Well ) By Prov. 11 / .4 Kv 100 Kva S / Stn. A / W 11 Kv Ht Section Indpur Under Esd Indora Ed Fatehpur ( Bid No. Ocd / Db / Bid-20 / 2022-23 ) - 2 11 / .4 Kv 100 Kva Dtr ( Rec Sep. Ord 11 / 1976 3 Prov. St Polepole 9 Mtr. Long W / L 200 Kgs 4 Muff For Steel Tubular Pole With Concrete Filling 5 X-Arm: [ Channel Iron ( 100X50x5 Mm ) , Length : 2800 Mm X 2 Nos ] For Incomer Line 6 Ms A.I. ( 50X50x6 Mm ) , Length: 2800 Mm X ( 1 Nos For LaS ) 7 X-Arm: [ Channel Iron ( 75X40x5 Mm ) , Length : 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 8 X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Transformer Bed 9 X-Arm [ Channel Iron ( 100X50x6 Mm ) , Length : 460 Mm X 2 Nos For Supporting Main Channel Of Transformer ] 10 Ms A.I. ( 50X50x6 Mm ) , Length: ( 2800 Mm ) X 2 No. 11 Ms Angle Iron ( 35X35x5 Mm ) , Length : 460 Mm X 2 Nos 12 Ms A.I. ( 50X50x6 Mm ) , Length: ( 950 Mm ) X 2 Nos. Of Bed Knee Bracing 13 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X2 Nos For Transformer Lt Distribution Box And G.O Switch Fixing Assembly 14 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 450 Mm ) X1 Nos For Transformer Lt Distribution Box And G.O Switch Fixing Assembly 15 G.O. Switch Handle Supporting: [ C.I. ( 75X40x6mm ) , Length: 460Mm For Transformer Lt Distribution Box And G.O Switch Fixing Assembly 16 G.O Ab Switch Unit ( 11Kv, 400, 663Ka ) Tripple Pole O / D Type 17 D.O Fuse Unit 18 Surge Arrester, 9 Kv Station Class 19 Discs Insulator Sets ( Comp. 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) I / C Dead End Clamps Etc. ) 20 Stay Set Complete 21 Staywire ( 7 / 3.15Mm ) ( 7 Kg Per Stay Set ) 22 Pipe Earthing With Gi, Charcoal & Salt 23 Prov. Lt Distribution Panel With Mccb ( 160 A, 10 Ka, 4P, 1 No. ) & Sfu ( 32 A 5 No. Rewireble ) For 100Kva Trf. As Per Specification 24 Half Clamp ( M.S. Flat 50X6 ) 25 Full Clamps ( M.S. Flat 50X6 ) 26 M. S. Nuts & Bolts Off Sizes ( Galvanised Coated ) [ Prefarably 16Mm Ø Or More ( With Flat And Spring Washer ) 27 Aluminium Thimbles 28 Copper Thimble 29 Danger Plate 30 Barbed Wire ( Rec Sp F 3 / 1981 ) 31 Lt Cable 3-1 / 2 Core-120Mm Sq. 32 Alluminium Paint 33 Prov.Acsr, 6 / 1 / 3.35 Mm 34 Prov. Transformer Structure Protection Plinth ( Civil Work As Per Hpsr ) For 100Kva S / Stn 35 Erection Of 100 Kva S / Stn 36 11 / .4 Kv 100 Kva Dtr ( Rec Sep. Ord 11 / 1976 37 Prov. St Polepole 9 Mtr. Long W / L 200 Kgs 38 Muff For Steel Tubular Pole With Concrete Filling 39 X-Arm: [ Channel Iron ( 100X50x5 Mm ) , Length : 2800 Mm X 2 Nos ] For Incomer Line 40 Ms A.I. ( 50X50x6 Mm ) , Length: 2800 Mm X ( 1 Nos For LaS ) 41 X-Arm: [ Channel Iron ( 75X40x5 Mm ) , Length : 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 42 X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Transformer Bed 43 X-Arm [ Channel Iron ( 100X50x6 Mm ) , Length : 460 Mm X 2 Nos For Supporting Main Channel Of Transformer ] 44 Ms A.I. ( 50X50x6 Mm ) , Length: ( 2800 Mm ) X 2 No. 45 Ms Angle Iron ( 35X35x5 Mm ) , Length : 460 Mm X 2 Nos 46 Ms A.I. ( 50X50x6 Mm ) , Length: ( 950 Mm ) X 2 Nos. Of Bed Knee Bracing 47 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X2 Nos For Transformer Lt Distribution Box And G.O Switch Fixing Assembly 48 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 450 Mm ) X1 Nos For Transformer Lt Distribution Box And G.O Switch Fixing Assembly 49 G.O. Switch Handle Supporting: [ C.I. ( 75X40x6mm ) , Length: 460Mm For Transformer Lt Distribution Box And G.O Switch Fixing Assembly 50 G.O Ab Switch Unit ( 11Kv, 400, 663Ka ) Tripple Pole O / D Type 51 D.O Fuse Unit 52 Surge Arrester, 9 Kv Station Class 53 Discs Insulator Sets ( Comp. 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) I / C Dead End Clamps Etc. ) 54 Stay Set Complete 55 Staywire ( 7 / 3.15Mm ) ( 7 Kg Per Stay Set ) 56 Pipe Earthing With Gi, Charcoal & Salt 57 Prov. Lt Distribution Panel With Mccb ( 160 A, 10 Ka, 4P, 1 No. ) & Sfu ( 32 A 5 No. Rewireble ) For 100Kva Trf. As Per Specification 58 Half Clamp ( M.S. Flat 50X6 ) 59 Full Clamps ( M.S. Flat 50X6 ) 60 M. S. Nuts & Bolts Off Sizes ( Galvanised Coated ) [ Prefarably 16Mm Ø Or More ( With Flat And Spring Washer ) 61 Aluminium Thimbles 62 Copper Thimble 63 Danger Plate 64 Barbed Wire ( Rec Sp F 3 / 1981 ) 65 Lt Cable 3-1 / 2 Core-120Mm Sq. 66 Alluminium Paint 67 Prov.Acsr, 6 / 1 / 3.35 Mm 68 Prov. Transformer Structure Protection Plinth ( Civil Work As Per Hpsr ) For 100Kva S / Stn 69 Supply Of 11 Kv Ht Line 70 Acsr 6 / 1 / 3.35 ( 55Mm² ) { Includes 3 Conductor Lengths For 3F And Additional 1% ( Sag, Jumpering And Wastage } 71 Prov. Steel Tubular Poles. 9Mtrs 72 Muff For Steel Tubular Pole ( 2000Mm Long ) With Concrete Filling 73 Cross Arm: [ Channel Iron ( 100X50x6 Mm ) , Length 1270 Mm ( I / C Tolerence Of 100Mm Either Side ) X2 Structure ( Run Through Structure ( Formation Tringle ) 74 Angle Iron ( 50X50x5 Mm ) , Length ( 2X750 ) Mm X 2 Structures ( Run Through Structure ( Formation Tringle ) 75 Pole Top Bracket [ Msci:100X50x6mm-100Mm ] 76 11 Kv Pin Insulators ( Porcelain, 12 Kv, 10 Kn ) : 3 No Per Pole Structure ( Run Through Structure ( Formation Tringle ) 77 Belt Set - Ms Angle Iron: 50X50x6, Length [ 1800 Mm X 2 No. ] For Dead End Structures 78 X-Bracing Set - Ms Angle Iron: 50X50x6, Length [ 2125 Mm X2 No. ] For Dead End Structures 79 X-Arm ( Horizental ) - Ms C. Iron: 50X50x6, Length [ 2340 Mm X2 No. ] For Dead End Structures 80 Discs Insulator Sets On Dead End Structures ( Comprising 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamps Etc. ) X ( 3 No. Conductors ) X ( 2 No. Sides ) For Dead End Structures 81 11 Kv Pin Insulators ( Porcelain, 12 Kv, 10 Kn ) : 3 No Per Pole Structure For Dead End Structures 82 Stay Set Complete In All Respect ( Single Pole-1No. , / D. Pole Structures-4Nos. ) 83 Stay Wire ( 7 / 3.15 Mm ) ( 8.0 Kg Per Stay Set ) 84 Ht Earthing Set Complete ( Rec Constr. Standared J-1 ) 85 Single Continous Earth Wire ( Gi, 8 Swg ) { Alongwith 1 Wire Lengths For Avg. One Road Crossing @ 20 M And Additional 1% ( Sag And Wastage ) } @ 0.102 Kg / M 86 Eye Hook For Earth Wire 87 Earth Wire Clamp 88 Ms Chanel Iron 75X40x6mm, Length: 2400Mm For Road Crossing 89 Half Clamp ( On D / P Dead End Str:4Nos; On Run Through Str. 2Nos. ) 90 Full Clamp ( On D / P Dead End Str:4Nos; On Run Through Str. 2Nos. ) 91 Danger Plate ( 250X200x1.6 Mm ) 92 M. S. Nuts & Bolts Off Sizes ( Galvanised Coated ) [ Prefarably 16Mm Ø Or More ( With Flat And Spring Washer ) 93 Barbed Wire ( Rec Sp F 3 / 1981 ) 94 G.O Ab Switch Unit ( 11Kv, 400, 663Ka ) Tripple Pole O / D Type 95 Alluminium Paint 96 Prov. Hp Make Aiq Desktop Model Hp 200 G4 With Intell Core 3-10110U-10 Gen.Processor, 8Gb Ddr4 Ram Expenditure Upto 16 Gb, Itb, Hdo ( T2qorpm ) 2St Antiglare Led Desplay Withfhd ( 1920X1060 ) Integrated Hd Graphics & Webcam, 2Xusb, 3.0 2Xusb, 2.0 Cardreacer. Audio Part Vgnhdmi / Dp Port, 10X100, 1000Mcomdliant Lan Usb Key Board & Mouse Internalspl. Connectivity Bo2 11 B / G / N / Ac Pl Windows Etc. With Three Years On Site Warranty. ( Ii ) 650Va Offline Ups System With12vx7ahx2nos: 158Vah / Smf Batteryto Povide20 Min. Battery Back Upwith Three Year Warrantyon Ups &Battery From Delivery With Printer 97 Erection Of 11 Kv Ht Line 98 Acsr 6 / 1 / 3.35 ( 55Mm² ) { Includes 3 Conductor Lengths For 3F And Additional 1% ( Sag, Jumpering And Wastage } 99 Prov. Steel Tubular Poles. 9Mtrs 100 Muff For Steel Tubular Pole ( 2000Mm Long ) With Concrete Filling 101 Cross Arm: [ Channel Iron ( 100X50x6 Mm ) , Length 1270 Mm ( I / C Tolerence Of 100Mm Either Side ) X2 Structure ( Run Through Structure ( Formation Tringle ) 102 Angle Iron ( 50X50x5 Mm ) , Length ( 2X750 ) Mm X 2 Structures ( Run Through Structure ( Formation Tringle ) 103 Pole Top Bracket [ Msci:100X50x6mm-100Mm ] 104 11 Kv Pin Insulators ( Porcelain, 12 Kv, 10 Kn ) : 3 No Per Pole Structure ( Run Through Structure ( Formation Tringle ) 105 Belt Set - Ms Angle Iron: 50X50x6, Length [ 1800 Mm X 2 No. ] For Dead End Structures 106 X-Bracing Set - Ms Angle Iron: 50X50x6, Length [ 2125 Mm X2 No. ] For Dead End Structures 107 X-Arm ( Horizental ) - Ms C. Iron: 50X50x6, Length [ 2340 Mm X2 No. ] For Dead End Structures 108 Discs Insulator Sets On Dead End Structures ( Comprising 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamps Etc. ) X ( 3 No. Conductors ) X ( 2 No. Sides ) For Dead End Structures 109 11 Kv Pin Insulators ( Porcelain, 12 Kv, 10 Kn ) : 3 No Per Pole Structure For Dead End Structures 110 Stay Set Complete In All Respect ( Single Pole-1No. , / D. Pole Structures-4Nos. ) 111 Stay Wire ( 7 / 3.15 Mm ) ( 8.0 Kg Per Stay Set ) 112 Ht Earthing Set Complete ( Rec Constr. Standared J-1 ) 113 Single Continous Earth Wire ( Gi, 8 Swg ) { Alongwith 1 Wire Lengths For Avg. One Road Crossing @ 20 M And Additional 1% ( Sag And Wastage ) } @ 0.102 Kg / M 114 Eye Hook For Earth Wire 115 Earth Wire Clamp 116 Ms Chanel Iron 75X40x6mm, Length: 2400Mm For Road Crossing 117 Half Clamp ( On D / P Dead End Str:4Nos; On Run Through Str. 2Nos. ) 118 Full Clamp ( On D / P Dead End Str:4Nos; On Run Through Str. 2Nos. ) 119 Danger Plate ( 250X200x1.6 Mm ) 120 M. S. Nuts & Bolts Off Sizes ( Galvanised Coated ) [ Prefarably 16Mm Ø Or More ( With Flat And Spring Washer ) 121 Barbed Wire ( Rec Sp F 3 / 1981 ) 122 G.O Ab Switch Unit ( 11Kv, 400, 663Ka ) Tripple Pole O / D Type 123 Alluminium Paint
BOQ
| Sl. No. | Item Description |
| 1 | Supply of 100 kVA S/Stn |
| 2 | 11/.4 KV 100 KVA DTR (REC Sep. ord 11/1976 |
| 3 | Prov. ST PolePole 9 Mtr. Long W/L 200 Kgs |
| 4 | Muff for steel tubular pole with concrete filling |
| 5 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 6 | MS A.I.(50X50x6 mm), Length: 2800 mm x(1 Nos for LA\"s ) |
| 7 | X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 8 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed |
| 9 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] |
| 10 | MS A.I.(50X50x6 mm), Length: (2800 mm) x 2 No. |
| 11 | MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 12 | MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing |
| 13 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 14 | MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 15 | G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly |
| 16 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 17 | D.O Fuse unit |
| 18 | Surge Arrester, 9 kV Station Class |
| 19 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
| 20 | Stay set complete |
| 21 | Staywire (7/3.15mm)( 7 Kg per stay set) |
| 22 | Pipe earthing with GI,Charcoal & Salt |
| 23 | Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 100KVA Trf. as per specification |
| 24 | Half clamp (M.S. Flat 50x6) |
| 25 | Full clamps (M.S. Flat 50x6) |
| 26 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 27 | Aluminium Thimbles |
| 28 | Copper Thimble |
| 29 | Danger Plate |
| 30 | Barbed wire (REC Sp F 3/1981) |
| 31 | LT Cable 3-1/2 core-120mm sq. |
| 32 | Alluminium Paint |
| 33 | Prov.ACSR, 6/1/3.35 mm |
| 34 | Prov. Transformer structure protection plinth(Civil Work As per HPSR) for 100KVA S/Stn |
| 35 | Erection of 100 kVA S/Stn |
| 36 | 11/.4 KV 100 KVA DTR (REC Sep. ord 11/1976 |
| 37 | Prov. ST PolePole 9 Mtr. Long W/L 200 Kgs |
| 38 | Muff for steel tubular pole with concrete filling |
| 39 | X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 40 | MS A.I.(50X50x6 mm), Length: 2800 mm x(1 Nos for LA\"s ) |
| 41 | X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 42 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed |
| 43 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] |
| 44 | MS A.I.(50X50x6 mm), Length: (2800 mm) x 2 No. |
| 45 | MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 46 | MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing |
| 47 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 48 | MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly |
| 49 | G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly |
| 50 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 51 | D.O Fuse unit |
| 52 | Surge Arrester, 9 kV Station Class |
| 53 | Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) |
| 54 | Stay set complete |
| 55 | Staywire (7/3.15mm)( 7 Kg per stay set) |
| 56 | Pipe earthing with GI,Charcoal & Salt |
| 57 | Prov. LT distribution panel with MCCB (160 A, 10 KA, 4P,1 No.) & SFU (32 A 5 No. rewireble) for 100KVA Trf. as per specification |
| 58 | Half clamp (M.S. Flat 50x6) |
| 59 | Full clamps (M.S. Flat 50x6) |
| 60 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 61 | Aluminium Thimbles |
| 62 | Copper Thimble |
| 63 | Danger Plate |
| 64 | Barbed wire (REC Sp F 3/1981) |
| 65 | LT Cable 3-1/2 core-120mm sq. |
| 66 | Alluminium Paint |
| 67 | Prov.ACSR, 6/1/3.35 mm |
| 68 | Prov. Transformer structure protection plinth(Civil Work As per HPSR) for 100KVA S/Stn |
| 69 | Supply of 11 kV HT line |
| 70 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage} |
| 71 | Prov. Steel tubular poles. 9mtrs |
| 72 | Muff for steel tubular pole (2000mm long) with concrete filling |
| 73 | Cross Arm: [Channel Iron (100x50x6 mm), Length 1270 mm (i/c tolerence of 100mm either side) x2 structure( Run Through structure (Formation Tringle) |
| 74 | Angle Iron (50x50x5 mm), Length (2x750) mm x 2 structures (Run Through structure (Formation Tringle) |
| 75 | Pole Top Bracket [MSCI:100x50x6mm-100mm] |
| 76 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through structure (Formation Tringle) |
| 77 | Belt Set - MS Angle Iron: 50x50x6, Length [1800 mm x 2 No.]for Dead End Structures |
| 78 | X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x2 No.] for Dead End Structures |
| 79 | X-Arm(Horizental) - MS C. Iron: 50x50x6, Length [2340 mm x2 No.]for Dead End Structures |
| 80 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)for Dead End Structures |
| 81 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure for Dead End Structures |
| 82 | Stay set complete in all respect ( Single Pole-1No. , /D. Pole Structures-4Nos.) |
| 83 | Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) |
| 84 | HT earthing set complete (REC Constr. Standared J-1) |
| 85 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 86 | Eye Hook for earth wire |
| 87 | Earth Wire Clamp |
| 88 | MS Chanel Iron 75x40x6mm, length: 2400mm for road crossing |
| 89 | Half clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
| 90 | Full clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
| 91 | Danger Plate (250X200X1.6 mm) |
| 92 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 93 | Barbed wire (REC Sp F 3/1981) |
| 94 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 95 | Alluminium Paint |
| 96 | prov. HP make AIQ Desktop Model HP 200 G4 with intell core 3-10110U-10 Gen.processor, 8GB DDR4 RAM expenditure upto 16 GB, ITB, HDO (T2QORPM)2st antiglare LED desplay withFHD (1920x1060) integrated HD Graphics & Webcam, 2xUSB, 3.0 2xUSB, 2.0 Cardreacer. Audio part VGNHDMI/DP Port, 10x100, 1000Mcomdliant LAN USB key board & mouse internalspl. connectivity BO2 11 b/g/n/ac PL windows etc. with three years on site warranty. (II) 650VA offline UPS system with12Vx7AHx2Nos: 158VAH/SMF batteryto povide20 Min. battery back upwith three year warrantyon UPS &battery from delivery with printer |
| 97 | Erection of 11 kV HT line |
| 98 | ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage} |
| 99 | Prov. Steel tubular poles. 9mtrs |
| 100 | Muff for steel tubular pole (2000mm long) with concrete filling |
| 101 | Cross Arm: [Channel Iron (100x50x6 mm), Length 1270 mm (i/c tolerence of 100mm either side) x2 structure( Run Through structure (Formation Tringle) |
| 102 | Angle Iron (50x50x5 mm), Length (2x750) mm x 2 structures (Run Through structure (Formation Tringle) |
| 103 | Pole Top Bracket [MSCI:100x50x6mm-100mm] |
| 104 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through structure (Formation Tringle) |
| 105 | Belt Set - MS Angle Iron: 50x50x6, Length [1800 mm x 2 No.]for Dead End Structures |
| 106 | X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x2 No.] for Dead End Structures |
| 107 | X-Arm(Horizental) - MS C. Iron: 50x50x6, Length [2340 mm x2 No.]for Dead End Structures |
| 108 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)for Dead End Structures |
| 109 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure for Dead End Structures |
| 110 | Stay set complete in all respect ( Single Pole-1No. , /D. Pole Structures-4Nos.) |
| 111 | Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) |
| 112 | HT earthing set complete (REC Constr. Standared J-1) |
| 113 | Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 114 | Eye Hook for earth wire |
| 115 | Earth Wire Clamp |
| 116 | MS Chanel Iron 75x40x6mm, length: 2400mm for road crossing |
| 117 | Half clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
| 118 | Full clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) |
| 119 | Danger Plate (250X200X1.6 mm) |
| 120 | M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) |
| 121 | Barbed wire (REC Sp F 3/1981) |
| 122 | G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type |
| 123 | Alluminium Paint |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed