}

Replacement And Modification Of Baggage Handling Conveyors Design, Supply, Installation, Testing And Commissioning Of Baggage Handling System With 05 Years Aicmc At Tezpur Airport., tezpur-Assam

Airports Authority Of India has published Replacement And Modification Of Baggage Handling Conveyors Design, Supply, Installation, Testing And Commissioning Of Baggage Handling System With 05 Years Aicmc At Tezpur Airport.. Submission Date for this Tender is 27-06-2022. Conveyors and Accessories Tenders in tezpur Assam. Bidders can get complete Tender details and download the document.




Tender Notice

32566285
Replacement And Modification Of Baggage Handling Conveyors Design, Supply, Installation, Testing And Commissioning Of Baggage Handling System With 05 Years Aicmc At Tezpur Airport.
Open Tender
Indian
Assam
tezpur
27-06-2022

Tender Details

Replacement And Modification Of Baggage Handling Conveyors Design, Supply, Installation, Testing And Commissioning Of Baggage Handling System With 05 Years Aicmc At Tezpur Airport.

Key Value

Document Fees
INR 1180 /-
EMD
INR 100320.0 /-
Tender Value
INR 50.16 Lakhs /-

BOQ Items

Name of Work: Replacement and Modification of Baggage Handling Conveyors (SH:Design & Supply, Installation, Testing and Commissioning of Baggage Handling System with 05 years AICMC at Tezpur Airport).
Sl. No. Item Description
1Item No. 1 ENDLESS SLAT CONVEYOR (ARRIVAL) Design, supply, installation,testing & commissioning ofheavy dutyEndless Slat TypeFlat Arrival BaggageConveyor System (Approx.42.6 Mtr.) havingnominal useful widthof 950mm, having rubber slats black in colour with smooth top of PVC / PU / Rubber, antistatic,flame retardant, height 450mm from finished floor level and speed of 24- 30 mtrs / min. The carousel shall have die-cast aluminimum chain block friction type suitable capacity drive unit complete with overlapping slats finished chain track unit frame work tension adjustment device stainless steel side covering ( inner & outer side panelsof1.6 mm thick stainless steel for PAX area and 2 mm thick MS for non PAX area) in the passenger area as well as in the non passenger area, toe-kick plate at inner & outer sides, infill, rubber slat of suitable dimensions with MS slat support having live loading capacity of 35 kgs per linear meter and all other accessoriesincluding cutting and drilling of holes, equipment grouting, earthing, necessary wiring, connection / interconnection etc. as required for successful commissioningof baggage conveyor system complete as per the direction of Engineer-in-charge.( with friction drive as per Technical Specification).
2Item No. 2 CONTROL PANEL: ARRIVAL SITC of sheet steel clad (14 SWG) dust and vermin proof, wall / floor mounted PLC based Control Panel with locking arrangement suitable for operation (for 1 No.arrival conveyor belts)on 415 volts, 3 phase, 50Hz AC supply,digital voltmeter & ammeter with selector switches, LED phase indication lamps, ON / OFF Timer (0-180 sec) and buzzer, suitable rating 4P MCCB incomer, Busbar, TP MPCB, control MCB, ELCB,power contactors, emergency stop switch, control and power wiring, soft starter mechanism, earthing etc. complete as required as per the direction of Engineer-in-charge.
3Item No. 3 DEPARTURE CONVEYOR SYSTEM Design, supply, installation, testing and commisioning of heavy duty Slider Bed Departure Conveyor of16.6 mtr. Long connector conveyer + 12.6mtr. LongTransport + 3 Mtr. long Take-away conveyer measured across the center line having frame 1050mm (useful width not less than 1000 mm) and 400 mm height from finished floor level for easy handling of passenger baggage weighing 35 kg. per linear mtr at speed of 21 to 25 mtr/min. complete with PVC belt on bed construction as specified i/c drive unit , end pulleys , take up pulley, side panels (1.6 mm thick of stainless steel for PAX area and 2 mm thick MS for non PAX area) and all other accessories for successful commissioning of the conveyor as per above length, specifications & drawings.
4Item No. 4 CONTROL PANEL: Departure SITC of sheet steel clad (14 SWG) dust and vermin proof, wall / floor mounted PLC based Control Panel with locking arrangement suitable for operation on 415 volts, 3 phase, 50Hz AC supply,digital voltmeter & ammeter with selector switches, LED phase indication lamps, ON/OFF Timer (0-180 sec) and buzzer, suitable rating 4P MCCB incomer, Busbar, TP MPCB, control MCB, ELCB,power contactors, emergency stop switch, control and power wiring, earthing etc. complete as required as per the direction of Engineer-in-charge.
5Item No. 5 GRAVITY ROLLER CONVEYOR Design, supply, installation, testing and commisioning of Gravity Roller structure of 2mtr. in length measured along the centre line complete in all respects i/c frame section, rollers, supports as per specifications / drawings as approvedby Engg.-in-charge.
6Item No. 6 DRAUGHT CURTAIN Supply & Installation of Draught Curtain cover forthe opening of conveyer belt, of sutiable size fabricated with 3mm thick Nylon Rubber flaps, to be fixed by SS flat strip as per size of shutter opening etc. the opening size shall be as per dimensions /drawings approved by engg.-in-charge, complete as required (Arrival and Departure)
7Item No. 7 ROLLING SHUTTER SITC of electricaly operated Rolling Shutter with arrangement for auto and manual operation to suit to the opening in wall fabricated extruded Aluminium provided with suitable rated tubular geared single phase motor directly coupled to the shaft of the shutter,limit switch or sensor interlock with coveyor starter, complete with guide channels, wiring, earthing, painting etc. as required for the successful operation of the shutter for minimum opening size 1.5mtr (L) x 1.35mtr (W).(Arrival and Departure)
8Item No. 8 Dismantling and shifting of existing Departure System and 1 No. Arrival Carousel including its Control Panel, Rolling Shutters etc. to Nearest AAI"s Stores.
9a) For Departure System
10b) For 1 No. Arrival System.
11Item No. 9 All inclusive Comprehensive Maintenance of depature and arrival conveyor system by providing quarterly inspection, repair, maintenance, tracking, alignment, replacement of unserviceable components, greasing, poling, topping up of gear oil in gear reducer, rolling shutter, cleaning and all other other accssociated maintenance job as per maintenance schedule and recomendation of OEM on following slat/slider belt/feeder/gracity roller coveyor and control panels to keep the conveyor system under serviceable condition including attending any numbers of breakdown as and when required. Note:-The agency shall also required to pay quterly visit during the 12 month DLP period for Preventive maintnance. (i) Endless arrival slat conveyor (42.6 mtr loop length) along with their power cum control panels - 1No. (ii) Depature slider bed conveyor (16.6 mtr + 12.6 mtr + 3 mtr)- 1 No. along with their powe cum control panels. (iii) Depature Gravityroller conveyor -1 No.
12a) 1st year after DLP of 1 year (3.545% of SITC cost, i.e item no -1 to 7 ) For 1 Job / Annum
13b) 2nd year(3.748% of SITC cost, i.e item no -1 to 7 ) For 1 Job / Annum
14c) 3rd year(3.951% of SITC cost, i.e item no -1 to 7 ) For 1 Job / Annum
15d) 4th year(4.153% of SITC cost, i.e item no -1 to 7 ) For 1 Job / Annum
16e) 5th year(4.356% of SITC cost, i.e item no -1 to 7 ) For 1 Job / Annum
17-2146826265
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail