}

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atsaheb Yadaw To Ne, deoghar-Jharkhand

Drinking Water And Sanitation Department has published Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atsaheb Yadaw To Ne. Submission Date for this Tender is 13-06-2022. Garden Tools Tenders in deoghar Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

32563234
Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atsaheb Yadaw To Ne
Open Tender
Indian
Jharkhand
deoghar
13-06-2022

Tender Details

Supplying Of Materials, Tools , Plants And Skilled And Unskilled Man Power For Repairing And Maintenance Of Existing Structure And Fitting, Fixing All Works With Operation & Maintenance The Entire Works During Shrawani Mela -2022 Atsaheb Yadaw To Near Udaypura ( Plant No.-03 To Nearplant No.- 05 ) Under D.W & S. Division, Deoghar For The Year 2022-23Group No. Sm-D-02-2 Cleaning Of Site, Cutting Bushes Dressing And Leveling Do Etc All Complete As Per Direction Of E / I 3 Dismantling Patent Stone Flooring Including Stacking Serviceable Materials In Countable Stacks Within 15 M Lead And Disposal Of Unserviceable Materials With All Leads All Complete As Per Direction Of E / I. 4 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 5 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1-5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 6 Supplying All Materials, Labour, Writing Name Of Department, Male & Female Directionon The Wall After Making Box By Good Quality Of Paint As Per Direction Of E / I. 160 Mm High Letter 7 Cost Towards Painting And Writing Slogan On Board 4’ X 3’ Size With Good Quality Paint Carrying And Fitting Fixing On Each Site Including Minor Repair Of Board Taking Back After Mela As Per Direction Of E / I. ( 150 Mm High Letter ) 8 Cost Towards Transportation Ofsubmersible Pump, Pipe Fittings Etc. From Store To Work Site Including Carriage Water Tank Etc. All Complete. 9 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2 H.P To 7.5H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 10 Cost Towards Dismantling After Mela And Taking Back To Work Site From Store Including Carriage Of All Materials And Pump, Water Tank Etc. All Complete. 11 Laying Ofpvc Pipes Of Approved Make In Trenches With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) ( I ) 32 Mm Dia Pvc Pipe. 12 ( I ) 25 Mm Dia Pvc Pipe. 13 Laying Of Pvc Pipes Of Approved Make On Wall And Roof With Red Lead And Yarn With Socket And Screw Joints And Cutting Pipe So Size And Threading Ends Where Necessary Etc. All Complete As Per Specification And Direction E / I. ( Pipes To Be Supplied Departmentally Free Of Cost ) 14 ( I ) 15 Mm Dia Pvc Pipe 15 ( I ) 20 Mm Dia Pvc Pipe 16 ( Ii ) 25 Mm Dia Dia Pvc Pipe 17 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela. 18 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. 19 Cost Towards Engaging Pump Operatarcum Water Spreader On Laid Sand For Operating And Spreading Water On Sand Etc.All Complete Job. Gr.-Ii 20 Cost Towardscleaning The Rcc Water Storage Tank Over Pump House Having Size 3 M X 3 M X 2 M Including The Cost Of Bleaching Powder, Jute, Sacfolding Etc. All Complete. 21 Cost Towards Engagingplumber Andelectric Mistryduring Mela Periodincluding Contractor Profit. Plumber Gr.-Ii 22 Electric Mistry Gr.-Ii 23 Cost Towards Extra Materials Due To Damages During Taking Out Damage Cut Pieces Including Laboaur Cost As Per Direction Of E / I. In Walls / Trenches. 32 Mm Dia Pvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 24 25 Mm Dia Pvcpipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 25 15 Mm Dia Pvc Pipe. ( Rate Of Pvc Pipe + Laying Cost Charge ) 26 32 Mm Dia Pvc Elbow 27 25 Mm Dia Pvcelbow 28 15 Mm Dia Pvcelbow 29 32 Mm Dia U / S 30 25 Mm Dia U / S 31 25 X 25 X 15 Mm Diareducing Tee 32 32 Mm Dia Pvc Fta 33 25 Mm Dia Pvc Fta 34 15 Mm Dia Pvc Fta 35 15 Mm Dia Pvc Coupler 36 25 Mm Dia Pvc Coupler 37 32 Mm Dia Pvc Coupler 38 15 Mmpvcshower 39 15 Mm P.V.C Bib Cock 40 32 X 32 X 25 Mm Dia Tee Pvc 41 Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing, Cleaning, Sand Papering The Wall, Scaffolding, Curing And Taxes All Complete As Per Building Specification & Direction Of E / I. 42 Providing And F / Fixing Water Supply Arrangement From Gi Hdpe Tank To Bathing Palatform As Per Site Condition Including Required Fittings And Pvc Pipe All Completeincluding Installation Ofhdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 43 Sanitary Installation 44 Providing 12 Mm, Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M 1.5 Including Screening, Curing With All Leads And Lifts Of Water, Scaffolding Taxes And Royalty All Complete As Per Building Specification And Direction E / I. 45 Providing Designation 75 A Brick Work In C. M. ( 1:6 ) In Different Places In Sewer Line With Approved Quality Of Clean Coarse Sand Of F. M. 2 To 2.5 Including Do…..Do…….All Complete As Per Building Specification And Direction Of E / I. 46 Labour For Scrapping Old Paint With Paint Remoter And Below Lamp As Required On Wooden Or Steel Surface Including Cost Of All Labour And Materials And Scaffolding All Complete As Per Balding Specification And Direction Of E / I. 47 Providing One Coat Of Painting With Ready Mixed Paint Of Approved Shade And Make Over Steel Surface Including Cleaning The Surface Toughly, Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E / I. Quantity Same As Item No. 23 48 Providing Supplying, Fitting And Fixing Of The Followingmaterials In Connection Of Latrine Room. 25 Mm Diapvcpipe ( Rate Of Pvc Pipe + Laying Cost Charge ) 49 15 Mm Dia Pvcpipe ( Rate Of Pvc Pipe + Laying Cost Charge ) 50 25 X 25 X 15 Mmpvc Tee 51 25 Mm Dia Pvc Coupler 52 15 Mm Dia Pvc Coupler 53 25 Mm Dia Pvc U / Socket 54 25 Mm Dia Pvc Fta 55 15 Mm Dia Pvc Fta 56 25 Mm Dia Pvc Elbow 57 15 Mm Diapvcelbow 58 Providing And Fixing 15 Mm Dia Male Ended C.I. Bodybrass Spindle Valve And Seat Bib Clock Of Approved Quality ( Wt- Not Less Than 400 Gms. ) With Extra Socket All Complete As Per Specification And Direction E / I. 59 Providing Onecoats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over New Surface Including Preparing The Plastered Surface By Rubbing Month With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 60 Supplying Of Following Materials. Mug 61 Plasticbucket 62 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10Mm Think Mortar Joints, Cost Of Screening Materials, Raking Out Joints Of 15Mm Depth, Curing Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I 63 Supplying Labour Tools And Fitting Fixing Steel Door In Toilet Complex All Complete. 64 Supplying, Fitting And Fixing 20 Gauge G.C.I Sheet Gate Fitted On M.S Angle Frame Of Size60*60*6 Mm Including Cost Of Fabrication, Providing Necessary Locking Arrangement With Haskal And Domny Duly Fixed In C / C ( 1:2:4 ) Blocks Of Required Size, Applying A Priming Red Lead Paint Over Steel Work, Taxes All Complete As Per Drawing Specification And Direction Of E / I 65 Indravarsha 66 Earth Work In Excavation For Laying Of Pipe So As To Give One Meter ( Avg. ) Cover Over The Socket Of Pipe And Back Filling The Trenches After Laying Of Pipe, Again A / W In Excavation And Taking Out The Laid Pipeand Back Filling The Same After The End Ofshrawani Mela 67 Earth Work In Back Filling The Trenches Fatter Laying Different Types And Size Of Pipes With Earth Removed During Excavation Within Initial Lead And Lift As Per Specification And Direction E / I. As Per Item No. 35 68 Laying Of 32 Mm Dia Gi / Pvc Pipe In Trenches And Taking Out The Same 69 Supplying Of 32 Mm Dia Pvc Pipe With Socket In 3 M Length Do-Do All Complete. 70 Laying & Jointinggi / Pvcpipe In Hanging Position Ovar Support And Taking Out The Same After And Of Shrawani Mela ( Pipe Supplied Departmentally Free Of Cost ) . A. 32 Mm Dia. Pipe 71 B. 25 Mm Dia. Pipe 72 Supplying And Fixing Gifittings Of Approved Make All Complete As Per Specification And Direction E / I. 32 Mm Elbow 73 32 Mm Nipple 74 32 Mm U / S 75 25 Mm Plug 76 25 Mm Socket 77 32 X 25 R.S. 78 32 X 25 Elbow 79 25 Mm U / S 80 32 Mm Tee 81 Electric Welding Of 15 Mm Dia X Nipple In 25 Mm Dia Gipipe After Making Hole Of 20 Mm Dia Including Cost Ofnipple. In 32 Mm Dia. Pipe 82 Cost Of 15 Mm Dia. Gi. Socket 83 Providing Pump Operator Cum Water Spreaderfor Operating Motor And Spreading Water On Laid Sand. ( 1No. X 30 Days 9:00Am To 5:00Pm ) Gr.-Ii 84 Cost Towards Fitting & Fixing Submersible Pump With Clamp Etc. All Complete Including Lowering Of Pvc Pipe. 2H.P To 7.5 H.P And Taking Out After Ending Mela And Deposited In Departmental Store Deoghar. 85 Peyaoo 86 Earth Work In Excavation In Foundation Trenches In Ordinary Soil ( Vide Classification Of Soil Item-B ) And Disposal Of Excavated Earth As Obtained To A Distance Up To 50 M Including All Lifts, Levelling, Ramming The Foundation Trenches, Removing Roots Of Trees Shrubs All Complete As Per Approved Design, Building Specification And Direction Of E / I. 87 Providing Coarse Clean Sand In Filling In Foundation Trenches Or In Plinth Including Ramming And Watering In Layers Not Exceeding 150Mm Thick With All Leads Including Cost Of Materials, Labours, Royalityand Taxes All Complete As Per Building Specification And Direction Of E / I. ( Mode Of Measurement-Compacted Volume ) . 88 Providing Designation 75 A One Brick Flat Soling Joints Filled With Local Sand Including Cost Of Watering, Taxes Royalty All Complete As Per Building Specification And Direction Of E / I. 89 Providing P.C.C.M-150 In Nominal Mix Of ( 1:2:4 ) In Foundation With Approved Quality Of Stone Chips 20Mm To 6Mm Size Graded And Clean Coarse Sand Of F.M 2.5 To 3 Including Screening, Mixing Cement Concrete In Mixer And Placing In Position, Vibrating, Curing, Taxes And Royalty All Complete As Per Building Specification Direction Of E / I. 90 Providing Designation 75 A Brick Work In C.M. ( 1:6 ) In Foundation And Plinth With Approved Quality Of Clean Coarse Sand Of F.M. 2 To 2.5 Including Providing 10 Mm Thick Mortar Joints, Cost Of Screening, Scaffolding, Raking Out Joints To 15 Mm Depth, Curing, Taxes And Royality All Complete As Per Building Specification And Direction Of E / I. 91 Providing Designation 75A Brick Work In C.M ( 1:6 ) In Superstructure With Approved Quality Of Clean Coarse Sand Of F.M 2 To 2.5 Including Providing 10Mm Thick Mortar Joints, Cost Of Screening, Scaffolding, Raking Out Joints 15Mm Depth, Curing, Taxes And Royalty All Complete As Per Bldg. Specification And Direction Of E / I 92 Reinforced Cement Concrete Work In Beams, Suspended Floor, Roofs, Having Slope Up To 15º Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Window Sills, Staircases And Spiral Stair Cases Above Plinth Level Up To Floor Five Level, Excluding The Cost Of Centring, Shuttering, Finishing And Reinforcement, With 1:1.5:3 ( 1 Cement : 1.5 Coarse Sand ( Zone-Iii ) : 3 Graded Aggregate 20Mm Nominal Size ) 93 Providing Tor Steel Reinforcement Of 8 Mm 10 Mm Dia Bars As Per Approved Design And Drawing Cutting, Bending And Binding With Annealed Wire Including The Cost Of Wire, Removal Of Rust, Placing The Rods In Position All Complete As Per Building Specification And Direction Of E / I. ( A ) 8 Mm & 10 Mm 94 Providing 12 Mm Cement Plaster ( 1:6 ) With Clean Coarse Sand Of F.M. 1.5 Including Cost Of Screening, Curing With All Leads And Lifts Of Water, Scaffolding, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 95 Providing 25 Mm Thick First Class Patent Stone Flooring ( 1:2:4 ) With Stone Chips, In Two Layers, Bottom Layer 19 Mm Thick ( 1:2:4 ) With 12 Mm To 6 Mm Size Graded Stone Chips And Top Layer 6 Mm Thick ( 1:2 ) With 6 Mm Down Stone Chips In Panels, Including Cost Of Curing, Finishing The Surface Smooth By Rubbing With Carborun-Dum Stone, Taxes And Royalty All Complete As Per Building Specification And Direction Of E / I. 96 Providing Two Coats Of Oil Bound Distemper Of Approved Shade And Make Over A Coat Of Cement Primer Over Old Surface Including Preparing The Plastered Surface By Rubbing Smooth With Pumice Stone Or Fine Sand Paper Applying Putty Wherever Required Scaffolding Washing Of Floors And Taxes All Complete As Per Building Specification Tionand Direction Of E / I. 97 Providing Pump Operatorfor Operating Motor For Supplying Water Forpeyaoo. ( 1No.X 30 Days- Gr.-Ii 98 Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Old Surface Including Washing, Cleaning And Preparing The Walls, Scaffolding, Washing For Floor And Taxes All Complete As Per Building Specification And Direction Of E / I. 99 Providing Two Coat Of Snowmen Of Approved Shade And Makes Over A Coat Of Cement Primer On New Surface Including Prepering The Plastered Surface Smooth With Sand Paper, Scaffolding Curing And Taxes All Complete As Per Building Specification And Direction Of E / I. 100 Providing And F / Fixing Water Supply Arrangement From Gi Hdpe Tank To Bathing Palatform As Per Site Condition Including F / Fixing Bib Cock, Stop Cock, Gi Nipple, Tee, Elbow, Socket, R.Socket, Union Socket, Plug, Gun Metal Full Way Valve, Pvc Sch-80 Pipe All Complete Including Installation Of Hdpe Water Storage Tank Including Carriage Of Tank From Departmental Store To Work Site. ( Hdpe Water Storage Tank Will Be Supplied Free Of Cost Departmentally ) 101 Spreading Water Over Laid Sand 102 Providing Labour Tool And Equipmentfor Spreading Water Over Laid Sand At Kanwariya Path During Shrawani Mela.A ) Cost Of Flexible Pvc Pipe 103 B ) Labour Charge For 1 Place X 30 Dasys ( Unskild Labour ) 104 Carriage Ofall Materials From Store To Work Site And Return Back To Work Site To Departmental Store Within A Distance Of 15Km . 105 Cost Towards Electric Consumption Charge For To Be Paid To Electricity Board During Shrawani Mela .Payable Jseb 106 Carriage Of Materials Fromkiln Site Or Quarry Site To Work Site Including Contractor Profit, Loading, Unloading, Transportation, Etc. All Complete. Bricks Up To 15 K.M. 107 Sand Up To 15 K.M. 108 Stone Chips Up To 15 K.M. 109 Cement Up To 15 K.M. 110 Steel Up To 15 K.M. 111 Add Gst @ 12% 112 Add 1 % Labour Cess

Key Value

Document Fees
INR 1250 /-
EMD
INR 10500.0 /-
Tender Value
INR 5.15 Lakhs /-

BOQ Items

Name of Work: Supplying of materials, tools , plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Mela -2022 atSaheb Yadaw to near Udaypura ( Plant No.-03 to nearPlant No.- 05) under D.W & S. division, Deoghar for the year 2022-23 Group No. SM-D-02
Sl. No. Item Description
1WATER SUPPLY
2Cleaning of site, cutting bushes dressing and leveling do etc all complete as per direction of E/I
3Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.
4Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
5Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
6Supplying all materials, labour, writing name of department, male & female directionon the wall after making box by good quality of paint as per direction of E/I. 160 mm high letter
7Cost towards painting and writing slogan on board 4’ x 3’ size with good quality paint carrying and fitting fixing on each site including Minor repair of board taking back after Mela as per direction of E/I.(150 mm high letter)
8Cost towards transportation ofsubmersible pump, pipe fittings etc. from store to work site including carriage water tank etc. all complete.
9Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2 H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar.
10Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete.
11Laying ofPVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost) (i) 32 mm dia PVC pipe.
12(i) 25 mm dia PVC pipe.
13Laying of PVC pipes of approved make on wall and roof with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost)
14(i) 15 mm dia PVC Pipe
15(i) 20 mm dia PVC Pipe
16(ii) 25 mm dia dia PVC Pipe
17Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela.
18Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I.
19Cost towards engaging Pump Operatarcum water spreader on laid sand for operating and spreading water on sand etc.all complete job. Gr.-II
20Cost towardscleaning the RCC water storage tank over pump house having size 3 M x 3 M x 2 M including the cost of bleaching powder, jute, sacfolding etc. all complete.
21Cost towards engagingPlumber andElectric mistryduring Mela periodincluding contractor profit. Plumber Gr.-II
22Electric mistry Gr.-II
23Cost towards extra materials due to damages during taking out damage cut pieces including laboaur cost as per direction of E/I. in walls/trenches. 32 mm dia PVC pipe. ( Rate of PVC Pipe + Laying cost charge)
2425 mm dia PVCpipe.( Rate of PVC Pipe + Laying cost charge)
2515 mm dia PVC pipe. ( Rate of PVC Pipe + Laying cost charge)
2632 mm dia PVC Elbow
2725 mm dia PVCElbow
2815 mm dia PVCElbow
2932 mm dia U/S
3025 mm dia U/S
3125 x 25 x 15 mm diaReducing Tee
3232 mm dia PVC FTA
3325 mm dia PVC FTA
3415 mm dia PVC FTA
3515 mm dia PVC Coupler
3625 mm dia PVC Coupler
3732 mm dia PVC Coupler
3815 mmPVCShower
3915 mm P.V.C Bib Cock
4032 x 32 x 25 mm dia tee PVC
41Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I.
42Providing and F/Fixing water supply arrangement from GI HDPE Tank to Bathing Palatform as per site condition including required fittings and PVC pipe all completeincluding installation ofHDPE water storage tank including carriage of tank from departmental store to work site. (HDPE water storage tank will be supplied free of cost departmentally)
43SANITARY INSTALLATION
44Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I.
45Providing designation 75 A Brick work in C. M. (1:6) in different places in sewer line with approved quality of clean coarse sand of F. M. 2 to 2.5 including do…..do…….all complete as per building specification and direction of E/I.
46Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I.
47Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I. Quantity same as Item No. 23
48Providing supplying,fitting and fixing of the followingmaterials in connection of latrine room. 25 mm diaPVCPipe ( Rate of PVC Pipe + Laying cost charge)
4915 mm dia PVCpipe( Rate of PVC Pipe + Laying cost charge)
5025 x 25 x 15 mmPVC Tee
5125 mm dia PVC Coupler
5215 mm dia PVC Coupler
5325 mm dia PVC U/Socket
5425 mm dia PVC FTA
5515 mm dia PVC FTA
5625 mm dia PVC Elbow
5715 mm diaPVCElbow
58Providing and fixing 15 mm dia male ended C.I. bodybrass spindle valve and seat bib clock of approved quality (wt- Not less than 400 Gms.) with extra socket all complete as per specification and direction E/I.
59Providing onecoats of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbing month with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
60Supplying of following materials. Mug
61PlasticBucket
62Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I
63Supplying labour tools and fitting fixing steel door in Toilet complex all complete.
64Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I
65INDRAVARSHA
66Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela
67Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I. As per Item No. 35
68Laying of 32 mm dia GI/PVC pipe in trenches and taking out the same
69Supplying of 32 mm dia PVC pipe with socket in 3 M length do-do all complete.
70Laying & jointingGI/ PVCpipe in hanging position ovar support and taking out the same after and of Shrawani Mela ( pipe supplied departmentally free of cost). a. 32 mm dia. Pipe
71b. 25 mm dia. Pipe
72Supplying and fixing GIfittings of approved make all complete as per specification and direction E/I. 32 mm Elbow
7332 mm Nipple
7432 mm U/S
7525 mm Plug
7625 mm Socket
7732 x 25 R.S.
7832 x 25 Elbow
7925 mm U/S
8032 mm Tee
81Electric welding of 15 mm dia x Nipple in 25 mm dia GIpipe after making hole of 20 mm dia including cost ofnipple. In 32 mm dia. Pipe
82Cost of 15 mm dia. GI. Socket
83Providing pump operator cum water spreaderfor operating motor and spreading water on laid sand.(1No. x 30 Days 9:00AM to 5:00PM) Gr.-II
84Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2H.P to 7.5 H.P and taking out after ending mela and deposited in departmental store deoghar.
85PEYAOO
86Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-B ) and disposal of excavated earth as obtained to a distance up to 50 m including all lifts,levelling,ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I.
87Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads including cost of materials,labours,royalityand taxes all complete as per building specification and direction of E/I.(Mode of measurement-compacted volume).
88Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering, taxes royalty all complete as per building specification and direction of E/I.
89Providing P.C.C.M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, mixing cement concrete in mixer and placing in position,vibrating,curing,taxes and royalty all complete as per building specification direction of E/I.
90Providing designation 75 A Brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening, scaffolding, raking out joints to 15 mm depth, curing, taxes and royality all complete as per building specification and direction of E/I.
91Providing designation 75A Brick work in C.M(1:6) in superstructure with approved quality of clean coarse sand of F.M 2 to 2.5 including providing 10mm thick mortar joints, cost of screening,scaffolding,raking out joints 15mm depth,curing,taxes and royalty all complete as per bldg. specification and direction of E/I
92Reinforced cement concrete work in beams, suspended floor, roofs, having slope up to 15º landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centring, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded aggregate 20mm nominal size)
93Providing Tor steel reinforcement of 8 mm 10 mm dia bars as per approved design and drawing Cutting, bending and binding with annealed wire including the cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. (a) 8 mm & 10 mm
94Providing 12 mm cement plaster (1:6)with clean coarse sand of F.M. 1.5 including cost of screening, curing with all leads and lifts of water, scaffolding, taxes and royalty all complete as per building specification and direction of E/I.
95Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I.
96Providing two coats of oil bound distemper of approved shade and make over a coat of cement primer over old surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I.
97Providing pump operatorfor operating motor for supplying water forPeyaoo. (1No.x 30 Days- Gr.-II
98Providing one coat of plastic emulsion paint of approved shade and make over old surface including washing, cleaning and preparing the walls, scaffolding, washing for floor and taxes all complete as per building specification and direction of E/I.
99Providing two coat of snowmen of approved shade and makes over a coat of cement primer on new surface including prePering the plastered surface smooth with sand paper, scaffolding curing and taxes all complete as per building specification and direction of E/I.
100Providing and F/Fixing water supply arrangement from GI HDPE Tank to Bathing Palatform as per site condition including F/Fixing Bib Cock, stop cock, GI nipple, Tee, Elbow,Socket, R.Socket, Union Socket,Plug, Gun Metal Full way Valve, PVC Sch-80 Pipe all complete including installation of HDPE water storage tank including carriage of tank from departmental store to work site. ( HDPE water storage tank will be supplied free of cost departmentally)
101SPREADING WATER OVER LAID SAND
102Providing Labour tool and equipmentfor spreading water over laid sand at Kanwariya Path during Shrawani Mela.A) Cost of Flexible PVC pipe
103B) Labour Charge for 1 Place x 30 Dasys (Unskild Labour)
104Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM .
105Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB
106Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete. Bricks up to 15 K.M.
107Sand up to 15 K.M.
108Stone chips up to 15 K.M.
109Cement up to 15 K.M.
110Steel up to 15 K.M.
111Add GST @ 12%
112Add 1 % Labour Cess
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail