| 1 | Dismantling ofstone work in cement mortarincluding disposal of serviceable material and disposal of unservieceable material as directed by Engineer-in-charge complete job. |
| 2 | Dismantling ofchain link fencing includingcement concrete work in 1:3:6 mix or richer mix and structural steel workincluding disposal of unserviceable material and stacking of servieceable material as directed by Engineer-in-charge complete job. |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil (1 meter from cutting edge) |
| 4 | Supplying/filling dry stone soling tightly hand packed under foundation & under floors includingall carriages / head load upto site of work complete. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) using crushed aggregate includingall carriages / head load upto site of work complete. |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding thecost of centering, shuttering, finishing and reinforcement-all work upto foundation / plinth andfloor V- level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) including all carriages / head load upto site of work complete. |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) using crushed aggregate including all carriages / head load upto site of work complete. |
| 8 | Green Stone (Verinag) face dressed ornamental typein superstructure upto floor V level in cement mortar 1:6 (1 cement: 6 course sand) incld. pointing with cement mortar 1:2 (1 white cement :2 stone dust) with an add mixture of pigment matching the stone shade (Green stones) including extra labour for rectangular pillars and arch portion and including all carriage upto site of work complete.(chiseled dressed) |
| 9 | Stone work in plain Ashler in cornices 100mm , in cement mortar1:6 (1 cement :6 course sand) including pointing with cement mortar 1:2 (1 white cement :2 stone dust) with an add mixture of pigment matching the stone shade (Devri stones fine chiseled dressed) and including all leads, lifts & all carriage upto site of work complete. |
| 10 | Centering and shuttering including strutting, propping etc and removal of form for: thick water proof ply board. |
| 11 | a) Foundations, footings, bases of columns etc. for mass concrete. |
| 12 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete (Thermo-mechanically treated bars) including all carriages / head load upto site of work complete. |
| 13 | P/F of Devri Stone (Ashler stone) face dressed ornamental typein superstructure upto floor V level in cement mortar 1:6 (1 cement: 6 course sand) incld. pointing with cement mortar 1:2 (1 white cement :2 stone dust) with an add mixture of pigment matching the stone shade (Devri stones) including extra labour for rectangular pillars and arch portion and including all carriage upto site of work complete.(Fine chiseled dressed) |
| 14 | Steel work welded in built up sections/framed work, including fabrication with hot finished framed workincld.cutting,hoisting, fixing in position (As per approved drawing or pattern / design ) and applying coat of approved steel primer / paint (two or more coats), using structural steel as required in grating frames, guard bars,ladders, railing,brackets, gates and similar work, including all carriages / head load upto site of work complete. (Ornamental type) |