Electrical Work, Schedule Of Rates & Quantum Of Works Involved The Repairing & Maintenance Of 3.3Kvincomming Pannel Alongwith Trolly ( Arewa Make ) Capacity 1200 Amp. Insatalled At 33 / 11 Kv Sub Station Dalmau To Provide Supply Of Dalmau Pump Canal
Tender Overview
Project Description
Electrical Work, Schedule Of Rates & Quantum Of Works Involved The Repairing & Maintenance Of 3.3Kvincomming Pannel Alongwith Trolly ( Arewa Make ) Capacity 1200 Amp. Insatalled At 33 / 11 Kv Sub Station Dalmau To Provide Supply Of Dalmau Pump Canal ( Indepedent Feeder ) Of Irrigation Department.Under Supervision Ofe.D.D. Dalmau, Raebareli
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 08-Jun-2022 | date ex | Date | 16-Jun-2022 |
| 2 | 17-Jun-2022 | DATE EXTENSION | Date | 24-Jun-2022 |
| 3 | 25-Jun-2022 | DATE EXTENSION.. | Date | 04-Jul-2022 |
| 4 | 05-Jul-2022 | DATE EX | Date | 09-Jul-2022 |
| 5 | 11-Jul-2022 | DATE EXTEN | Date | 12-Jul-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Labour & Erection Charges:- |
| 2 | Repairing of Earth falt Over Current Relay (Arewa Make), if not repairable then Over Current Relay will be proovided by Contractor., if required. |
| 3 | Repairing of under voltage & over voltage relay. if not repairable then over Voltage Relay will be proovided by Contractor, if required. |
| 4 | Repairing of Master Relay. if not repairable then Master Relay will be proovided by Contractor, if required. |
| 5 | Repairing of 1200/1 Amp. Meter, if not repairable then Meter will be proovided by Contractor, if required. |
| 6 | Repairing of 33 KV VoltMeter, if not repairable then Volt Meter will be proovided by Contractor, if required. |
| 7 | Repairing of Selector Switch, if not repairable then Switch will be proovided by Contractor, if required. |
| 8 | Repairing ofT.N.C. Switch, if not repairable then Switch will be proovided by Contractor, if required. |
| 9 | Repairing of Indicator Lamp (Red & Green) . if not repairable then Lamp will be proovided by Contractor, if required. |
| 10 | Repairing of L.T.PT Fuse, if not repairable then material will be proovided by Contractor, if required. |
| 11 | Repairing of Tripping Coin Assesmbling, if not repairable then Material will be proovided by Contractor, if required. |
| 12 | Repairing of Closing Coin Assesmbling, if not repairable then Material will be proovided by Contractor, if required. |
| 13 | Repairing of Auxellourty Switch( 110 Volt AC to 110 Volt DC Power backup. |
| 14 | Machanical Equipments for complete overhallig of 3.3 KV incomming panel and trolley. |
| 15 | Complete Repairing of Trolly and panel alongwith commisioning. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender