Urban Local Bodies has published Construction Of Surface Drain Opposite Of Fruit Mundi Of Joygachi Super Market At Ward No-06 Under Habra Municipality . Submission Date for this Tender is 17-06-2022. Drainage Tenders in habra West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil) but excluding or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom,bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
2 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. |
3 | Ordinary cement concreat( Mix1:2:4) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevent IS codes.A) Pakur |
4 | 125mm thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
5 | Brick work with 1st class bricks in cement mortar (4:1) (a) In foundation and plinth. |
6 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as measured)and marble dust in proportion (2:1) including smooth finishing and rounding..(ii) 25mm thick. |
7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation. |
8 | Ordinary cement concreat( Mix1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevent IS codes. |
9 | Reinforcement for reinforced concrete works in all shorts of structures including distribution bars, stirruos, binders etc. including asupply of roads, initial straightening and removal of loose rust( if necessary ) cutting to requisite length , hooking and bending to correct shape placing in proper position and binding with 16 gauge black annelead wire at every intersection . For works in foundation, basement and upto roof of ground floor / upto 4 m . Tore steel / Mild Steel : |
10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/stagingwhere necessary (Ground floor). (i) with(4:1) cement morter , 20 mm thick - |
11 | Neat cement punning about 1.5 mm thick in wall dado window sills floor drain etc.00.sq.m ) |
12 | Add 12% G.S.T |
13 | Add 1% Labour Welfare Cess |