Ttps – Mech.Ii – Tm I – Unit-Iii - Overhauling Of Turbine Lub Oil System, Seal Oil System, Valves And Equipments, During The Forth Coming Annual Overhaul-Overhauling Of Seal Oil Cooler , Dismantling Of Top Water Box, Brush Cleaning Of All Tubes, Hydraulic Testing Of Tube Nest, Plugging Of Punctured Tubes, Cleaning Of Top And Bottom Water Box, Cleaning Of All Flange Seating Areas, Providing New Oil And Water Gaskets, Assembling And Tightening Of All Parts And Charging Of Oil & Water Side Etc. , Overhauling Of Lub Oil Cooler, Inspection Of Loc / Soc Bottom Water Box, Inspection And Cleaning Of Mot, Overhauling Of Clean Oil Tank, Overhauling Of Nrv: Overhauling Of Pnrv 100 / 250 Ata , Glv 100 / 40 , 16 Ata, Glv 4” / 600, 300 Class Ho / Mo , Scnrv 150 / 40, 16 Ata, Srv 2.5 ” X4 ” / 300 Class , Gv 350 / 125 Class & Gv 300 / 125 Class, Gv150 / 64 Ata Ho, Scnrv 350 / 125 Class, Overhauling Of Gv 150 / 64, 40, 16 Ata Ho, Gv 6 / 600, 300, 150 Class Ho, Glv 150 / 40 Ata , Glv 6 ” / 300 Class Ho / Mo, Scnrv 200 / 40, 16 Ata., Overhauling Of Cooling Water Line Valves: Overhauling Of Gv 150 / 64, 40, 16 Ata Ho, Gv 6 / 600, 300, 150 Class Ho, Glv 150 / 40 Ata , Glv 6 ” / 300 Class Ho / Mo, Scnrv 200 / 40, 16 Ata, Overhauling Of Gv 10 / 1500 Class Ho And Pnrv 250 / 250 Ata, Scnrv 300 / 150 Class. Gv / Gvl 10 / 150 Class, 12 / 150, 300 Class, Overhauling Of Gv 20 ( 400 / 500Mm ) 150 Class H.O , Replacement Of 400 / 500 Mm Gate Valve By Butterfly Valve In Lub Oil Cooler Hdpe Cooling Water Lines , Overhauling Of Vapour Extraction Fan, Repair Of Frp Lining, Inspection Of Coupling Bearing And Mechanical Seal In Ac Lub Oil / Dc / Ac / Dc Seal Oil Pumps Pump, Cleaning And Painting Works Including Cost Of Paintings, Repairing Of Gear Pump In Turbine Lub Oil Centrifuge System