}

Selection Of Master System Integrator ( Msi ) For Implementation Of Intelligent Integrated Traffic Management System ( Itms ) For Iscdl, Indore, indore-Madhya Pradesh

Indore Smart City Development Limited has published Selection Of Master System Integrator ( Msi ) For Implementation Of Intelligent Integrated Traffic Management System ( Itms ) For Iscdl, Indore. Submission Date for this Tender is 22-08-2022. Traffic monitoring system Tenders in indore Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32467723
Corrigendum : Selection Of Master System Integrator ( Msi ) For Implementation Of Intelligent Integrated Traffic Management System ( Itms ) For Iscdl, Indore
Open Tender
Indian
Madhya Pradesh
indore
22-08-2022

Tender Details

Selection Of Master System Integrator ( Msi ) For Implementation Of Intelligent Integrated Traffic Management System ( Itms ) For Iscdl, Indore

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 18-Jul-2022 KEYDATESITMS18072022.pdf Date 05-08-2022
2 22-Jul-2022 PrebidQueriesResponses.pdf Other 05-08-2022
3 22-Jul-2022 Corrigendum02.pdf Other 05-08-2022
4 02-Aug-2022 KEYDATESITMS02082022.pdf Date 22-08-2022
5 10-Aug-2022 CORRIGENDUM04.pdf Other 22-08-2022

Key Value

Document Fees
INR 50000 /-
EMD
INR 2250000.0 /-
Tender Value
INR 45 Crore /-

BOQ Items

Name of Work: Selection of Master System Integrator (MSI) for Implementation of Intelligent Integrated Traffic Management System (ITMS) for ISCDL, Indore
Sl. No. Item Description
1ATCS (Adaptive Traffic Control System) for 50 Junction
2ATCS (Adaptive Traffic Control System) for a 3 arm - Junction with complete hardware and software includingbut not limited to Camera based detector, traffic controller, Composite Pedestrian Walk Man and stop man, Disabled Friendly Audio Tactile Device, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories, underground cabling, ducting, etc. as required. Integration with existing BRTS traffic signals, ATCS functionalities and required hardware and software, communication to meet the functional requirement. (for 3 BRTS 3 arm junction )
3ATCS (Adaptive Traffic Control System) for a 4 arm - Junction with complete hardware and software includingbut not limited to Camera based detector, traffic controller, Composite Pedestrian Walk Man and stop man, Disabled Friendly Audio Tactile Device, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories, underground cabling, ducting etc. as required. Integration with existing BRTS traffic signals, ATCS functionalities and required hardware and software, communication to meet the functional requirement.(For 8 BRTS 4 arm junction)
4ATCS (Adaptive Traffic Control System) for a 5 arm - Junction with complete hardware and software includingbut not limited to Camera based detector traffic controller, composite Pedestrian Walk Man and stop man, Disabled Friendly Audio Tactile Device, Traffic Signals, Network Switch, mounting infrastructure, UPS, Outdoor Cabinet with suitable mounting, earthing, surge protection arrangement, accessories, underground cabling, ducting etc. as required. Integration with existing BRTS traffic signals, ATCS functionalities and required hardware and software, communication to meet the functional requirement.(For 3BRTS 5 arm junction)
5TRAFFIC ENFORCEMENT COMPONENTS
6Traffic Enforcement System for 3 arm junctions: Red Light Violation Detection (RLVD), ANPR cameras, IR, Local Processing Unit, cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses, underground cabling, ducting, earthing, surge protection etc. as required
7Traffic Enforcement System for 4 arm junctions: Red Light Violation Detection (RLVD), ANPR cameras, IR, Local Processing Unit, cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses, underground cabling, ducting, earthing, surge protection etc. as required
8Traffic Enforcement System for 5 arm junctions: Red Light Violation Detection (RLVD), ANPR cameras, IR, Local Processing Unit, cabling, accessories & Mounting Infrastructure with Pole, Switches, Junction boxes, UPS, software licenses, underground cabling, ducting, earthing, surge protection etc. as required
9SVD: Speed Detection System for covering 2 lanes in one direction with complete subcomponents including ANPR and evidence capturing capability, IR illuminator, non-intrusive speed. Sensor, with underground cabling, ducting, earthing, surge protection & mounting etc. as required
10Traffic violation detector sensor for covering 2 lanes with ANPR capability with complete subcomponent including sensor, IR illuminator, underground cabling, ducting, earthing, surge protection and mounting infrastructure and required software with the capability of Speed violation, wrong side movement etc.
11PA system including hardware, software mounting infrastructure, accessories etc. at junctions
12RLVD (including Speed, No Helmet, Triple Ridding, Wrong direction, traffic count and classification etc.) Application Software at ICCC
13ANPR Software Application at ICCC
14SVD Software Application at ICCC
15PA System Software Application at ICCC
16Integration of existing ITMS control room system, Completed integration withE-Challan software(Central/State/Local), Application at ICCC,including integration with State RTO/ Vahan & Sarathi, Payment Portal, City Mobile App( Emergency vehicels priority, Indore 311, Citizen Cop etc.) / Payment portal and Gateway, PUC integration, SMS portal etc.
17Surveillance
18Surveillance - Bullet Cameras
19Surveillance - Outdoor PTZ Camera
20ICCC AND ITMS CONTROL CENTRE APPLICATIONS
21Centralize traffic Information & Management Software at ICCC (Including but not limited to ATCS Application, ITMS application, Analytical dashboards, Map, reproting, Field equipment status, SLA reporting, software, licensesetc.features required as per RFP)
22Video Management and Video Analytics software (1000 Cameras) Where MSI may provide separate video management system and video analytics software.
23TRAFFIC CONTROL, INFORMATION AND MANAGEMENT
24Smart traffic sensor for traffic management and Analysis
25Smart traffic sensor application for traffic management and Analysis (Integrated with ITMS application)
26Operation And Maintenance cost (OPEX)
271st Year
282nd year
293rd Year
304th Year
315th Year
32Network Connectivity and Bandwidth Cost for 5 years
33INDIVIDUAL COMPONENT LIST (Note: Bidders are advised to give Individual Component cost for below from S.No. 7.01 to 7.47 , however this cost will not be considered for evalution of financial bid )
34ATCS Controller
35ATCS Controller cabinet and other accessories inside the cabinet
36ATCS Controller Cabinet foundation
37ATCS traffic detector interface
38Per meter cabling cost (cable from controller to pole)
39Per meter underground ducting and reinstatement cost (duct from controller to pole)
40Per meter micro-trenching and reinstatement cost
41Traffic Signal Aspects RED
42Traffic Signal Aspects AMBER
43Traffic Signal Aspects GREEN
44Vehicle Countdown Timer
45Pedestrian Walk Man and stop man composite signal
46Pedestrian audio tactile device
47Smart Traffic Sensor
48ATCS Traffic Detector
49Junction Box
50Earthing with material
51Communication/Networking hardware per junction
52Cantilever Poles along with foundation
53Straight Pole along with foundation
54Network Switch Ruggedized at field
55IR Illuminator
56Red Light Violation Detection (RLVD) sensors
57ANPR camera
58Local processing unit
59Field Storage device 3 arm junction
60Field Storage device 4 arm junction
61Field Storage device 5 arm junction
62UPS 3 arm junction
63UPS 4 arm junction
64UPS 5 arm junction
65Battery
66Mounting structure with pole, junction boxes etc.
67SVD camera
68VMS per camera licence
69PA Controller
70PA Speaker
71Primary /Secondary Server
72Firewall
73Storage as per the solution requirement with 180 days backup
748 port switch
7524 port switch
7648 port switch
77Load balancer
78NVR for 1000 cameras
79ATCS Application license
80ITMS Application
81KEY RESOURCES (Note: Bidders are advised to give Man Month cost for below from S.No. 8.01 to 9.05, however this cost will not be considered for evalution of financial bid )
82Team Leader-cum-Program Manager
83Solution Architect
84Database Expert
85Security Expert
86Intelligent Traffic Management Expert
87Network Expert
88OTHER RESOURCES
89Application Developer
90Software Test Lead
91Software Testing Engineer
92Integration Expert
93Support Staff
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail